Exam Study Guide · English, with Spanish terms of art
Spanish Real Estate: Study Notes
A condensed companion to the full Agente Profesional Inmobiliario curriculum — built from every módulo, distilled to what's actually exam-relevant: definitions, thresholds, procedures, and the Spanish vocabulary you need to recognize on sight. Search the sidebar or scroll through in order.
59 topics799 vocabulary terms6 módulos
These are the notes I studied from. I took the COAPI course for professional estate agents in Spain (diploma, September 2026), and condensed the material with the help of AI. They are unofficial: COAPI did not write, review or endorse them. General information, not legal advice. They can contain mistakes, and laws and tax rates change, so check the current text before you rely on a figure. Andrei, CasaSol
Módulo 1
Derecho Civil
Tema 1
Concept of Law. Civil, Commercial and Regional (Foral) Law
Key concepts
Law (Díez-Picazo): an order of human coexistence inspired by criteria of justice; norms are imperative, general/abstract, public (published in BOE), and coercible.
Art. 6.1 CC: ignorance of the law does not excuse compliance — the agent cannot plead ignorance of real-estate regulations.
Hierarchy of sources (art. 1.1 CC): ley (statute) > custom > general principles of law. Regulatory pyramid: Constitution (1978) > EU law/treaties > organic/ordinary laws > regulations (Royal Decrees, ordinances) > custom/general principles. Case law of the Supreme Court complements but is not formally a "source."
Public law (State organization, imperium) vs. Private law (relations between equals: civil, commercial, private international, labour).
Civil Code (Código Civil, CC): published by Royal Decree of 24 July 1889 (NOT 6 Oct 1888 — that was a superseded first edition; exam trap). Structure: Preliminary Title (arts. 1–16) + 4 Books — I Persons, II Property/ownership, III Modes of acquiring ownership, IV Obligations and contracts.
Key special civil laws outside the CC: LPH (Law 49/1960, horizontal property), LAU (Law 29/1994, urban leases), Mortgage Law (1946), LOE (Law 38/1999, building regulation), LCCI (Law 5/2019, real estate credit), Law 12/2023 (Right to Housing).
Commercial Law governs businesspeople (empresarios) and businesses (empresas); based on Commercial Code of 1885 (4 books) and Capital Companies Act (RDL 1/2010).
Regional/foral civil law coexists with common civil law in 6 Autonomous Communities: Catalonia, Aragón, Navarre, Basque Country, Galicia, Balearic Islands (constitutional basis: art. 149.1.8ª CE). Valencia has NO foral civil law (declared unconstitutional by STC 82/2016, 110/2016, 192/2016).
Civil vecindad (art. 14 CC) decides which Spanish civil law, common or foral, applies to a Spanish national (art. 16.1 CC), and so which Spanish rules govern their matrimonial property regime and forced heirship (legítima). Acquired by 2 years' continuous residence + declared wish, or 10 years with no contrary declaration, both recorded in the Civil Registry (art. 14.5 CC). Foreigners have no civil vecindad, and in cross-border cases EU rules come first: succession follows the law of habitual residence at death unless the person chose the law of their nationality (Reg. (EU) 650/2012, arts. 21–22); for marriages after 29 Jan 2019 with no chosen law, the property regime follows the spouses' first common habitual residence (Reg. (EU) 2016/1103, arts. 26 and 69.3).
Order of precedence (art. 13 CC): (1) Preliminary Title + Title IV Book I (marriage, except property regime) apply nationwide; (2) foral/special law in its territory; (3) CC applies only as supplementary law.
Spanish vocabulary
ordenamiento jurídico
legal system
norma jurídica
legal norm
Código Civil (CC)
Civil Code
derecho foral
regional/foral (special) law
vecindad civil
civil vecindad (regional civil status)
empresario
businessperson
Código de Comercio
Commercial Code
gananciales
community of acquests (marital property regime)
separación de bienes
separation of property (marital regime)
legítima
forced heirship share
capitulaciones matrimoniales
marriage settlement
Registro de la Propiedad
Land Registry
SEPBLAC
Spanish anti-money-laundering authority
autonomía de la voluntad
freedom of will/contract
Key citations
Art. 1.1 CC — sources of the Spanish legal system (ley, custom, general principles).
Art. 6.1 CC — ignorance of the law does not excuse compliance.
Art. 13–14 CC — order of application of civil rules; civil vecindad.
Art. 149.1.8ª CE — State exclusive competence over civil legislation, subject to preservation of foral law.
Tema 2
The Subject of the Legal Relationship
Key concepts
Legal relationship = normative bond between subjects of law (never solely between things); three elements: subjects (active = rights holders, passive = duty holders), object, and content (rights + duties).
Person (Albaladejo): every being the law accepts as capable of rights and obligations. Distinguish person (the being) from legal personality (the quality/fitness of being a subject of rights and obligations) — "one IS a person, one HAS legal personality."
Legal personality begins at birth: art. 30 CC (as reformed by Law 20/2011) now requires only (1) live birth and (2) complete detachment from the mother's womb — the old requirement of "living 24 hours + human form" was abolished. Exam trap: know this is a changed rule.
Art. 29 CC: the conceived but unborn child (nasciturus) is deemed born for all purposes favorable to it, conditional on actually being born under art. 30 conditions.
Legal capacity vs. capacity to act: legal capacity = fitness to HOLD rights/duties (unique, not a matter of degree, runs birth-to-death, same for everyone); capacity to act = fitness to EXERCISE rights/duties (variable, depends on civil status, subject to degree).
Legal age (mayoría de edad) begins at 18 (art. 240 CC).
Emancipation (art. 239 CC): by reaching majority, by grant of parental-authority holders, or by judicial grant; also automatic at 16 if living independently with parental consent (art. 243 CC). Effect (art. 247 CC): emancipated minor manages person/property as an adult BUT cannot take a loan, encumber, or dispose of real property without consent of both parents (or court-appointed defender if none) — critical for real estate agents dealing with emancipated minors.
Law 8/2021 abolished judicial incapacitación entirely, replacing it with a flexible system of "support measures" respecting the person's will/preferences: informal support (guarda de hecho), voluntary support (powers of attorney, preventive mandates), judicial support (curatela — assistive as a rule, representative only exceptionally for acts the court names, and a representative curator, like a guardador de hecho, needs court authorisation to sell or mortgage real property, arts. 264, 269, 287 CC; defensor judicial — for conflicts of interest).
Legal persons (art. 35 CC): associations (asociación, plurality of persons) vs. foundations (fundación, single founder + purpose); public vs. private; distinct patrimony/rights from their members.
Spanish vocabulary
relación jurídica
legal relationship
personalidad jurídica
legal personality
capacidad jurídica
legal capacity
capacidad de obrar
capacity to act
nasciturus
conceived but unborn child
mayoría de edad
legal age (majority, 18)
emancipación
emancipation
patria potestad
parental authority
tutela
guardianship (old system)
curatela
curatorship (assistive support, post-2021)
defensor judicial
court-appointed defender
guarda de hecho
de facto/informal care
incapacitación
judicial incapacitation (abolished 2021)
asociación / fundación
association / foundation
Key citations
Art. 29–30 CC — beginning of legal personality (live birth + complete detachment).
Art. 239, 243, 247 CC — emancipation, its modes, and its limits on disposing of real property.
Law 8/2021, of 2 June — replaces incapacitación with support measures for persons with disabilities.
Tema 3
The Object of Rights — Things
Key concepts
For anything to be object of a right: possible to control, useful, lawful, and determined/determinable (arts. 1255, 1271 CC). A thing additionally needs to be subject to appropriation and have economic value (air, sea water are excluded).
Movable vs. immovable (arts. 333–337 CC) is the most important classification for real estate. Doctrinal subtypes of immovable: by nature (land, art. 334.1/2/8), by incorporation (fixed attachments, art. 334.3/9), by destination (movables assigned by owner to serve the immovable, e.g. machinery, art. 334.4/5/7), by analogy (rights in rem over real property, art. 334.10).
Law 17/2021 removed animals from the category of "things": new art. 333 bis CC defines animals as sentient beings; item 6 of art. 334 was deleted and moved to a new art. 334.2: beehives, dovecotes, fish ponds and similar breeding installations kept permanently on the land are still subject to the regime of immovables, but the animals themselves are no longer things — state expressly in the sale whether any animals are included.
Acquisition/effects: immovables need escritura pública + Land Registry inscription for third-party effect and mortgage security; movables generally transfer by delivery (traditio); pledge (prenda) is the typical movable security vs. mortgage (hipoteca) for immovables.
Finca (property/plot): a delimited piece of land with its own independent folio in the Land Registry — the basic unit of registry publicity.
Rustic vs. urban property distinguished by 4 combined criteria: location, use/purpose, construction status, accessory nature. Determines applicable lease law (LAU vs. LAR/Law 49/2003), IBI rate, retracto de colindantes (neighbour's statutory right to take the buyer's place, on the same terms, after the sale of a rustic plot of up to 1 ha, within 9 days of registration, arts. 1521–1524 CC). Cadastral classification ≠ urban planning classification — the PGOU (General Urban Development Plan) governs actual buildability, not the cadastre.
Public domain property (art. 132 CE, arts. 338–339 CC): belongs to the State/public entities, for public use/service; governed by 3 principles — inalienable, imprescriptible (cannot be acquired by usucapión), non-attachable. Can exit public domain via de-affectation (desafectación), becoming private patrimony subject to ordinary trade.
Private property is a constitutional right (art. 33 CE) but limited by its "social function"; expropriation requires (1) declared public utility/social interest, (2) fair compensation (justiprecio), (3) legal procedure — governed by the 1954 Expropriation Law.
Coastal properties: Ley de Costas (Law 22/1988) imposes statutory easements (passage, protection, access to sea) near the maritime-terrestrial public domain, severely limiting construction/renovation.
Spanish vocabulary
bienes muebles / inmuebles
movable / immovable property
finca
property, registered plot
finca rústica / urbana
rustic / urban property
dominio público
public domain
desafectación
de-affectation (removal from public domain)
imprescriptible
not subject to acquisition by adverse possession
inembargable
non-attachable (not subject to seizure)
justiprecio
fair-value compensation (in expropriation)
expropiación forzosa
compulsory expropriation
retracto de colindantes
neighbour's statutory right to take the buyer's place after the sale of an adjoining rustic plot of up to 1 ha
tanteo y retracto
rights of first refusal and repurchase
nota simple
simple registry extract
Catastro
Cadastre (administrative register of the Ministry of Finance; not the Land Registry = Registro de la Propiedad)
PGOU
General Urban Development Plan
Ley de Costas
Coastal Law
bienes fungibles / no fungibles
fungible / non-fungible things
Key citations
Art. 333 & 333 bis CC (Law 17/2021) — appropriation of things; animals as sentient beings, not "things".
Art. 334 CC — list of immovable property by category.
Art. 132 CE & arts. 338–339 CC — public domain property and its principles.
Art. 33 CE — right to private property, social function, expropriation.
Tema 4
The Legal Transaction (Negocio Jurídico)
Key concepts
Legal facts (hechos jurídicos): natural (no human will, e.g. storm) vs. legal acts (voluntary — unlawful or lawful). Lawful voluntary acts split into legal acts strictu sensu (effects imposed by law) and negocio jurídico (declared will determines the effects).
Negocio jurídico = agreement of wills seeking a legally protected result; effects follow primarily from the parties' declared will.
Key classification pairs: formal (ad solemnitatem, e.g. donation of real property, art. 633 CC) vs. non-formal (freedom of form, art. 1278 CC); nominate vs. innominate; principal vs. accessory (suretyship/fianza, mortgage depend on a principal obligation); unilateral/bilateral/multilateral; onerous (commutative or aleatory) vs. gratuitous; inter vivos vs. mortis causa.
Essential elements of a contract (art. 1261 CC): (1) consent, (2) definite object, (3) cause. Missing any = no contract.
Consent/declaration of will requires: capacity, coincidence between declared and actual will (exceptions: error obstativo = transaction doesn't exist; mental reservation = valid; iocandi causa = doesn't exist), and absence of vices of will.
Vices of the will (art. 1265 CC): error (essential + excusable), dolo/fraud (serious, determinative — art. 1269), violencia (irresistible force), intimidación (unjust threat of imminent serious harm — art. 1267). All → voidability (anulabilidad), except unlawful-object cases which are void (nulidad).
Object (art. 1271 CC) must be determined/determinable, lawful, possible. Cause (art. 1274 CC) = the economic-social purpose: price in onerous contracts, mere liberality in donations; unlawful cause → nullity (art. 1305 CC).
Form: freedom of form is the default (art. 1278 CC); art. 1280 CC requires a notarized public deed (escritura pública) for creation/transfer/modification/extinction of rights in rem over real property — absence doesn't void the contract but blocks Land Registry inscription (art. 3 Mortgage Law) and third-party protection.
Natural elements: legal effects attached automatically unless excluded — key example: warranty against hidden defects in sale (arts. 1484–1499 CC), action time limit 6 months from delivery (art. 1490 CC).
Accidental elements: condition (suspensive/resolutory, positive/negative), term (dies a quo / dies ad quem), mode (accessory obligation in gratuitous transactions).
Ineffectiveness: absolute nullity (missing essential element/imperative rule breach — imprescriptible action) vs. voidability/anulabilidad (vice of will/capacity — 4-year action period, art. 1301 CC) vs. rescission (valid but harmful transaction — 4 years, art. 1299 CC) vs. resolution (breach of a valid contract, art. 1124 CC).
Lapse (caducidad): fixed period, extinguishes an unexercised right automatically; cannot be interrupted/suspended/waived; may be raised by the judge ex officio. Prescription (prescripción): must be pleaded by a party, CAN be interrupted (lawsuit, extrajudicial claim, debt acknowledgment — art. 1973 CC).
Key limitation periods: general period for personal actions = 5 years (art. 1964.2 CC, reduced from 15 by Law 42/2015 — major exam trap); ordinary usucaption of real property = 10 years (present)/20 years (absent) with good faith + just title (art. 1957 CC); extraordinary usucaption = 30 years, no good faith/title needed (art. 1959 CC); mortgage action = 20 years; rents (including monthly rent) and other payments due yearly or more often = 5 years (art. 1966 CC); professional fees = 3 years (art. 1967 CC); possessory actions & tort liability = 1 year; movable usucaption = 3 years with good faith, 6 years without any other condition (art. 1955 CC). Civil Code legal retracto of co-owners and adjoining rural owners (arts. 1522–1523 CC): 9 days from registration in the Land Registry or, if the sale is not registered, from when the person entitled learned of the sale (art. 1524 CC). Other retractos have their own periods: co-heirs 1 month from notice (art. 1067 CC); the tenant of a let home 30 calendar days from the buyer's notice with a copy of the deed (art. 25.3 LAU); the rural-lease tenant 60 business days (art. 22 LAR).
Actions that never prescribe: between co-heirs, co-owners or adjoining owners, the action to partition an inheritance, divide co-owned property or demarcate boundaries (deslinde) (art. 1965 CC); by doctrine and case law (not art. 1965) also personality/family/civil-status rights and the action for absolute nullity.
Representation: legal (patria potestad, tutela, curatela representativa, defensor judicial — closed list) vs. voluntary (power of attorney/poder). Direct representation (effects fall on the represented person) is standard in real estate practice; requires contemplatio domini (acting visibly on behalf of another).
Power of attorney types: general (covers all the grantor's affairs, but drawn in general terms only acts of administration; selling or mortgaging needs express authority, art. 1713 CC) vs. special (specific act, e.g. sell a named property — standard in real estate) vs. preventive power of attorney (poder preventivo, arts. 256–259 CC, Law 8/2021) — lets a person appoint an attorney-in-fact in advance for loss of capacity; notarized deed; avoids judicial incapacitation.
Agent's due diligence on powers of attorney: verify sufficiency (expressly covers sale/mortgage of the specific property), non-revocation (check with notary/Notarial Register of Powers of Attorney), grantor's capacity at time of granting.
Regional notes: Andalusia ITP 7% general (6% for a habitual residence worth up to €150,000; 3.5% up to €150,000 if the buyer is under 35 or a victim of domestic violence or terrorism, or the home is in a municipality with depopulation problems; 3.5% up to €250,000 for disability or a large family; 'worth' is the tax value (Catastro reference value, or the price if higher), counting garage spaces and annexes bought with the home), AJD 1.2% general, on deeds that pay no ITP, such as a new home bought from the developer with VAT (1% / 0.3% in the same €150,000 habitual-residence cases; 0.1% for disability or a large family); Castilla y León ITP 8% up to €250,000 and 10% on the excess (4% for a habitual residence of under-36s, large families or buyers with 65% disability, within income limits; 0.01% for under-36s in small rural municipalities), AJD 1.5% general (0.5% habitual-residence cases).
Spanish vocabulary
negocio jurídico
legal transaction
hecho jurídico
legal fact
ad solemnitatem
as an essential formal requirement
ad probationem
for evidentiary purposes only
dolo
fraud/deceit
error obstativo
obstructive error (unconscious mismatch)
reserva mental
mental reservation
nulidad absoluta
absolute nullity (void)
anulabilidad
voidability
rescisión
rescission
caducidad
lapse (automatic extinction of a right)
prescripción
prescription/limitation
usucapión
acquisitive prescription (adverse possession)
apoderamiento / poder
granting of power of attorney / power of attorney
poderdante / apoderado
grantor / attorney-in-fact
poder preventivo
preventive power of attorney
escritura pública
notarized public deed
saneamiento por vicios ocultos
warranty against hidden defects
retracto
statutory right of redemption
Key citations
Art. 1261 CC — essential elements of a contract (consent, object, cause).
Art. 1265–1269 CC — vices of the will (error, dolo, violencia, intimidación).
Art. 1280 CC — notarized deed required for rights in rem over real property (registration purposes).
Art. 1964.2 CC (as amended by Law 42/2015) — 5-year general prescription period for personal actions.
Art. 1490 CC — 6-month deadline for hidden-defects action.
Tema 5
The Obligation
Key concepts
Obligation (art. 1088 CC): a legal relationship where the debtor must give, do, or not do something in favor of the creditor. Three elements: active subject (creditor), passive subject (debtor), object (performance — must be possible, lawful, determined).
Key classification: joint (mancomunada) vs. solidary/joint-and-several (solidaria) obligations when multiple debtors/creditors exist. Presumption of mancomunidad is the default (art. 1137 CC) — solidaridad must be EXPRESSLY agreed (exam favorite, esp. multi-tenant leases). Under mancomunidad, each owes/claims only their share and insolvency of one doesn't burden co-debtors; under solidaridad any creditor can claim the whole and any debtor can be made to pay it all.
Legal/case-law exceptions where solidaridad applies even without express agreement: partners of a general partnership (compañía colectiva) for the company's obligations (art. 127 CCom), tort liability of multiple at-fault parties, building-agent liability when not individualized (art. 17 LOE), comodato to several borrowers (art. 1748 CC), joint mandate (art. 1731 CC), heirs after partition who accepted without benefit of inventory (art. 1084 CC).
Non-performance: attributable to debtor (dolo, culpa, mora → indemnification, art. 1101 CC) vs. fortuitous event/force majeure (exonerates liability, art. 1105 CC).
Six causes of extinction (art. 1156 CC): payment/performance, loss of the thing, condonation (debt forgiveness), merger/confusión (creditor=debtor), set-off (compensación), novation. Case law adds: prescription, mutual dissent (mutuo disenso), termination for non-performance (art. 1124 CC).
Payment must be COMPLETE — creditor cannot be forced to accept partial payment (art. 1157/1169 CC). Must be paid to the rightful creditor or an authorized agent (art. 1162 CC) — the API cannot receive/forward client payments without express authorization.
Cash-payment ban: transactions involving a business/professional cannot be paid in cash for €1,000 or more (Law 7/2012, art. 7, as reduced by Law 11/2021) — €10,000 or more when the payer is an individual with no tax domicile in Spain who is not acting as a business or professional; split payments are added together — the API is an obliged AML party under Law 10/2010 (identify client, retain records, report to SEPBLAC).
Novation (art. 1203–1205 CC): extinctive (replaces obligation) vs. modificative (alters an element without extinguishing). Passive subrogation (change of debtor, e.g., buyer assumes seller's mortgage) requires the BANK's express consent (art. 1205 CC) for the seller to be released — a common agent error to avoid. Mortgage novation governed by Law 2/1994 (change rate/term/system without a new mortgage) and LCCI 5/2019 (cost limits).
Arras (earnest money, art. 1454 CC) in a sale: confirmatorias (deposit on account, no withdrawal right), penitenciales (withdrawal allowed — buyer forfeits, seller returns double), penales (a penalty for breach, lost or returned double, that replaces damages unless agreed otherwise; performance stays enforceable, but performance plus the penalty only if the contract clearly allows it, arts. 1152-1153 CC). This module's "golden rule": if not specified, case law presumes arras CONFIRMATORY by default (contrast with Tema 6's contract module, which states the opposite default — flagged discrepancy, see Tema 6 note).
LAU habitual-residence lease: if agreed for less, it extends yearly, at the tenant's option, to 5 years if the landlord is a natural person, 7 if a legal entity (art. 9.1). Temporary housing leases (real, provable cause; over 31 days, as a rule up to 12 months) follow art. 9 bis instead (art. 9.4, since 8 Oct 2026). Stressed-market-area rules (Law 12/2023) apply only in zones a region has declared and the Ministry has listed. Andalusia has declared none (Nov 2026), so they do not cap rents in Málaga. In a declared zone, the new contract's rent cannot exceed the last rent of the previous five years, as updated, save increases of up to 10% in listed cases (art. 17.6 LAU). Large holders (>10 dwellings, or 5+ where the declaration says so) are also capped by the reference price index (art. 17.7 LAU). In ALL housing leases, not only in stressed areas, estate-agency and contract-formalisation costs can never be passed on to the tenant (art. 20.2 LAU).
Guarantor (fiador) has "beneficio de excusión" (benefit of discussion, arts. 1830-1834 CC) unless the guarantee is expressly joint and several — landlord must exhaust tenant's assets first unless waived.
Spanish vocabulary
obligación
obligation
acreedor / deudor
creditor / debtor
mancomunada
joint (each owes only their share)
solidaria
joint and several
incumplimiento
non-performance
mora
default/delay
caso fortuito / fuerza mayor
fortuitous event / force majeure
condonación
debt forgiveness
confusión
merger of creditor/debtor roles
compensación
set-off
novación
novation
subrogación
subrogation
nota de encargo
listing/engagement agreement
arras confirmatorias/penitenciales/penales
confirmatory/withdrawal/penal earnest money
fiador / beneficio de excusión
guarantor / benefit of discussion
zona de mercado residencial tensionado
stressed residential market area
Key citations
Art. 1088 CC — definition of obligation (give, do, not do).
Art. 1137 CC — presumption of mancomunidad; solidaridad must be express.
Art. 1156 CC — six causes of extinction of obligations.
Art. 1454 CC — arras in sale contracts; penitential arras (double return / forfeiture).
Art. 1205 CC — bank consent required to release original debtor on passive subrogation.
Tema 6
The Contract
Key concepts
Contract (art. 1254 CC): arises from consent to bind oneself to give something or render a service. Binding from perfection (art. 1091 CC) — "pacta sunt servanda" (art. 1256 CC: validity cannot depend on one party's will alone).
Essential elements (art. 1261 CC, same as negocio jurídico): consent, certain object, lawful cause — missing any → absolute nullity. Real contracts additionally require delivery; formal contracts require the prescribed form.
Contract type pairs: unilateral/bilateral; onerous/gratuitous; consensual (perfected by consent alone, e.g. sale)/real (requires delivery, e.g. comodato, deposit, pledge)/formal-solemn (requires specific form, e.g. donation of real property art. 633, mortgage art. 1875); single-performance/successive-performance; nominate/innominate/mixed (e.g. lease-with-purchase-option); preparatory/principal/ancillary.
Consent (art. 1262 CC, reformed by Law 34/2002): meeting of offer + acceptance on thing and cause; between absent parties, consent exists when offeror becomes aware of acceptance (or cannot ignore it in good faith); in electronic/automatic contracting, consent exists the moment acceptance is manifested. Must be free, informed, capable.
Art. 1263 CC (reformed by Law 8/2021): non-emancipated minors may contract for everyday goods/services appropriate to their age per social custom, or as the law/representatives permit — "insane/demented/incapacitated" language removed, replaced by the support-measures framework.
Vices of consent (arts. 1265-1270 CC): error, violence, intimidation, fraud/deceit (dolo) → voidability (incidental/non-serious fraud → only compensation, not voidability).
Object (arts. 1271-1273 CC): lawful, possible, determinate/determinable as to kind (quantity can be fixed later without new agreement).
Cause (arts. 1274-1277 CC): the objective purpose — performance/promise in onerous contracts, service remunerated in remuneratory contracts, mere liberality in gratuitous ones. Presumed to exist and be lawful unless proven otherwise (art. 1277); false cause → nullity unless a true lawful cause is proven (art. 1276).
Form (arts. 1278-1280 CC): freedom of form is the rule (art. 1278). Art. 1280 CC lists acts requiring a public document: creation/transfer/modification/extinction of rights in rem over real property; leases of real property for 6 or more years where they are to bind third parties; marriage settlements and their changes; assignment, repudiation and waiver of hereditary rights; powers of attorney to administer property or for any act that must be in a public deed (e.g. a power to buy or sell real property); assignment of rights arising from a public deed. (Donation of real property needs a public deed under a separate rule, art. 633 CC.) Missing public-deed form doesn't invalidate the contract between the parties but blocks Registry inscription and third-party effect (art. 1279 CC allows compelling the other party to formalize it).
Three-tier form typology: free (any form, hard to prove) / ad probationem (for proof, e.g. private sale contract) / ad solemnitatem (for validity/full effectiveness, e.g. notarized deed for registration).
Contract lifecycle: formation (preliminary negotiations — no binding force, but bad-faith breakdown of advanced talks can trigger tort liability, culpa in contrahendo, art. 1902 CC) → perfection (offer+acceptance meet, art. 1262 CC; a pure/unqualified acceptance — any modification = counter-offer) → consummation (performance completed — delivery/traditio + full price payment).
Ineffectiveness hierarchy: non-existence (missing essential element, imprescriptible) < absolute nullity (breach of mandatory rule, art. 6.3 CC — ipso iure, imprescriptible, anyone can invoke, cannot be cured) < voidability (vice of consent/capacity — 4-year action, art. 1300-1301 CC, contract valid until annulled, can be cured by confirmation art. 1309) < rescission (economic prejudice or fraud on creditors in an otherwise valid contract — extraordinary/subsidiary remedy, only if no other recourse, art. 1291/1294 CC, 4-year period) < resolution/termination (a valid contract ended by non-performance art. 1124 CC, term expiry, resolutory condition, or rebus sic stantibus).
Preparatory contracts: bilateral promise to sell (art. 1451 CC) — binds both parties once thing+price agreed, either can demand performance. Unilateral promise = purchase option (opción de compra) — binds only the seller; if registered in the Land Registry, enforceable against third parties.
Arras (earnest money) table in this module: confirmatorias (a payment on account of the price that proves the contract; no forfeiture or double return on default: the other party chooses performance or termination, with damages in both cases, art. 1124 CC); penitenciales (art. 1454 CC — buyer default = forfeits, seller default = returns double; they apply only where the parties clearly agreed a right to withdraw — when the type is not specified, case law treats the payment as confirmatory (on account of the price)); penales (a penalty for breach, lost or returned double, that replaces damages unless agreed otherwise; performance stays enforceable, but performance plus the penalty only if the contract clearly allows it, arts. 1152-1153 CC).
⚠ Note: older course materials disagreed on the default when the type of arras is not specified. The Supreme Court's line is that penitential arras (art. 1454 CC) are exceptional and require a clear agreement allowing withdrawal; without it, the payment is confirmatory — a payment on account of the price that confirms the contract (as Tema 5 says). In an exam question, still check which framing it uses.
Off-plan (new-build) sales: from the building licence, the developer must guarantee the return of all advance payments plus statutory interest, through surety insurance (seguro de caución) or a joint and several bank guarantee (aval solidario) issued individually for each buyer, and must collect the money in a special bank account (cuenta especial) used only for the construction (Disposición adicional primera, Ley 38/1999, LOE). This replaced Law 57/1968, repealed from 1 January 2016 by Law 20/2015 — ask for the individual guarantee certificate before paying.
Spanish vocabulary
perfección del contrato
perfection of the contract
consumación
consummation
pacta sunt servanda
agreements must be honored
culpa in contrahendo
fault in the negotiation phase
contrato de opción de compra
purchase option contract
promesa bilateral de venta
bilateral promise to sell
resolución
termination (of a valid contract)
rescisión
rescission
condición resolutoria
resolutory condition
rebus sic stantibus
clause allowing revision for changed circumstances
señal
deposit/down-payment
traditio
delivery of possession
capitulaciones matrimoniales
marriage settlement
nuda propiedad / usufructuario
bare ownership / usufructuary
Key citations
Art. 1254 CC — definition of contract; art. 1261 CC — essential elements.
Art. 1262 CC — moment of perfection (offer/acceptance between absent parties).
Art. 1280 CC — acts requiring a public document.
Art. 1454 CC — arras in sale contracts.
Art. 1451 CC — bilateral promise to sell.
Tema 7
The Sale and Purchase Contract (Compraventa)
Key concepts
Compraventa (art. 1445 CC): one party delivers a specific thing, the other pays a certain price in money (or token representing it). Characteristics: consensual (perfected by consent alone, art. 1450 CC — delivery not required), bilateral, onerous, commutative, property-transferring (ownership transfer needs title + tradition/mode, not consent alone), freedom of form (public deed needed for Registry access, not validity).
Prohibitions on acquiring by purchase (art. 1459 CC, closed list): guardians and persons exercising support functions (property of the persons they represent), agents/mandatarios (property they administer), executors, public employees (State/municipal property they administer), judges/prosecutors/court clerks/lawyers/procuradores (property in litigation before them). Exception: hereditary actions between co-heirs, assignment in payment of debts, or securities they hold.
Price requirements: real (not fictitious — else void for lack of cause), certain (determined/determinable, never left to one party's sole discretion, art. 1449 CC), in money (else it's an exchange/permuta, art. 1446 CC — mixed cases judged by intent, or by which portion — money vs. thing — is greater).
Seller's obligations: (1) delivery/tradition (actual, instrumental via escritura pública art. 1462, or symbolic) + hand over title deeds/keys/accessories; (2) preservation with due diligence until delivery; (3) pay expenses of the original deed (escritura matriz) unless agreed otherwise (art. 1455 CC) — buyer pays first-copy/subsequent expenses; (4) warranty (saneamiento) — against eviction (art. 1475 CC, owed even if not stated, unless excluded and seller acted in good faith) and against hidden defects.
Buyer's obligations: pay the price at agreed time/place, or at time/place of delivery if unset (art. 1500 CC) — prescription 5 years (Law 42/2015); receive the thing (else creditor's default: a buyer in default bears the risk of goods sold by weight, number or measure, art. 1452 CC, and a sale of movables is resolved by law in the seller's interest, art. 1505 CC); pay interest if agreed/thing produces fruit/buyer in default (art. 1501 CC); pay post-sale expenses, registration, and transfer tax ITP (resale; general rate 7% in Andalusia) or VAT plus stamp duty AJD on the deed (new/first transfer; general AJD rate 1.2% in Andalusia).
Warranty against hidden defects (arts. 1484-1490 CC): defect must be hidden (not obvious, not easily detectable by an expert buyer), severe enough to make the thing unfit or substantially devalued, and pre-existing the contract. Buyer's remedies: redhibitory action (rescind, mutual restitution, + damages if seller knew and concealed) or actio quanti minoris (keep thing, get price reduction) — BOTH have a 6-month deadline from delivery (art. 1490 CC).
LOE (Law 38/1999) liability of the building agents for NEW buildings runs in addition to, not instead of, the seller's CC liability (art. 17.1: 'sin perjuicio de sus responsabilidades contractuales'), counted from the reception of the works: 1 year (finishing defects, builder only), 3 years (habitability defects — damp, leaks, installations), 10 years (structural defects). The action prescribes 2 years from when the damage occurs (art. 18.1 LOE).
Retention of title agreement (pacto de reserva de dominio): seller keeps ownership until full price paid; common in movable installment sales (Law 28/1998); for real property the functional equivalent is the express resolutory condition registered under art. 11 Mortgage Law (LH).
Special sale types: sale on trial/approval and sale by taste (art. 1453 CC — presumed suspensive condition); sale with pacto de retro/carta de gracia (conventional right of repurchase, arts. 1507-1520 CC, 4 years if no term is agreed, max. 10 years if agreed, art. 1508 CC, must be registered for third-party effect).
Exchange/permuta (art. 1538 CC): each party gives a thing to receive another (not money) — governed suppletively by sale rules (art. 1541 CC). If one party's received thing turns out not to belong to the giver, the recipient need only return what they received, not deliver what they promised (art. 1539 CC). On eviction, the aggrieved party may choose recovery of what they gave or damages (art. 1540 CC). Tax: between private parties each settles ITP on the value of the property they acquire (art. 23 RD 828/1995); where a business hands over a new building (first delivery), that leg bears VAT plus AJD instead (art. 7.5 TRLITPAJD).
Spanish vocabulary
compraventa
sale and purchase
permuta
exchange/barter
tradición
delivery (transfer of possession)
saneamiento
warranty (seller's liability)
evicción
eviction (loss of thing to a prior right)
vicios ocultos
hidden defects
acción redhibitoria
redhibitory action (rescission for defects)
acción estimatoria / quanti minoris
price-reduction action
pacto de reserva de dominio
retention of title agreement
pacto de retro / carta de gracia
conventional right of repurchase
escritura matriz
original notarial deed
mora del acreedor
creditor's default
ITP-AJD
transfer tax and stamp duty
Key citations
Art. 1445 CC — definition of sale and purchase.
Art. 1450 CC — perfection by consent on thing + price.
Art. 1459 CC — prohibitions on acquiring.
Art. 1484–1490 CC — warranty against hidden defects; 6-month action deadline.
Art. 1538 CC — definition of exchange (permuta).
Tema 8
Law 29/1994 on Urban Leases (LAU) — Primary Legislative Text
Key concepts
Scope: LAU governs leases of urban properties for housing (art. 2.1 — habitable building whose primary purpose is to satisfy the tenant's housing need, including the letting of a single room or part of the dwelling; rooms let at the same time may not together exceed the whole-dwelling rent, art. 17.9) or for other uses (art. 3 — leases to carry on an industrial, commercial, craft, professional, care, cultural or teaching activity, regardless of who signs; leases for lodging people are excluded). Since 8 Oct 2026 (RDL 29/2026, validated by Congress on 12 Nov 2026) a 'temporary housing lease' (arrendamiento de vivienda temporal, art. 2.3) — for a tenant temporarily away from home for a justified, provable cause — is a housing lease under Title II, lasting more than 31 days and as a rule no more than 12 months (art. 9 bis); seasonal contracts signed before that date keep their old regime until their agreed term ends, with no extension (DT 8ª). Excluded (art. 5): doorkeeper/staff housing tied to employment, military housing, mixed rural-use leases (governed by rustic-lease law), university housing, short-term tourist lettings (whole or part of the dwelling) marketed through tourism channels under regional tourism rules, for stays of at most 31 days (art. 5.e), and rooms let by third-sector social entities in non-profit programmes (art. 5.f, both as amended by RDL 29/2026).
Applicable regime (art. 4): Titles I and IV are always mandatory. Housing leases: party agreement first, then Title II, then suppletorily the CC — with no exception since 8 Oct 2026 (RDL 29/2026 removed the former carve-out for dwellings over 300 m² or with annual rent above 5.5x the minimum wage). Other-use leases: free agreement, then Title III, then CC.
Art. 6: any clause that modifies Title II rules to the tenant's detriment is void, unless the rule itself allows it — protective, one-way mandatory character of housing-lease rules.
Assignment/subletting (art. 8): tenant needs the landlord's WRITTEN consent for both; subletting can only be partial; sublease price can never exceed the lease price; subtenant's right is extinguished when the tenant's own right ends.
Minimum duration (art. 9) — core exam fact: freely agreed initial term; if shorter than 5 years (natural-person landlord) or 7 years (legal-entity landlord), COMPULSORY annual extension applies until reaching that minimum, unless the tenant gives 30 days' notice of non-renewal. No term stated = deemed 1 year, subject to the same extension right. Landlord can block extension after year 1 only if the contract expressly stated the landlord's own/family need to occupy (own use, first-degree relatives, or spouse post-divorce/annulment) — landlord must notify tenant 2 months before needing it; if not occupied within 3 months of vacating, tenant may choose reinstatement (up to 5 more years) or compensation (1 month's rent per remaining year to complete 5).
Tacit extension (art. 10): after the 5/7-year minimum, if neither party gives notice (landlord: 4 months; tenant: 2 months before expiry), contract extends annually up to 3 more years. Extraordinary extensions exist for vulnerable tenants (1 year, mandatory if landlord is a "gran tenedor"/large-scale holder) and for dwellings in a declared stressed-market area (up to 3 more years, mandatory unless specific exceptions; no Andalusian area had been declared as of 21 Oct 2026, so it cannot be claimed in Málaga). Temporary rule (RDL 29/2026, DF 5ª): for habitual-residence leases in force on 8 Oct 2026 whose compulsory extension ends before 31 Dec 2028, or whose tacit extension ends, the tenant may ask for up to 2 more years in annual periods if the rent has been paid on time for the previous 8 months; the landlord must accept unless the parties agree otherwise, sign a new lease, or the landlord proves a real need to occupy the dwelling (art. 9.3); it does not apply where a renewal at least 5% cheaper is agreed.
Tenant withdrawal (art. 11): after 6 months, with 30 days' notice; since 8 Oct 2026 the withdrawal gives the landlord no right to compensation (art. 11.3, RDL 29/2026 — the former agreed compensation of 1 month's rent per remaining year is gone; leases signed earlier keep their own clause). In a temporary housing lease the tenant may withdraw after 1 month with 10 days' notice (art. 11.2).
Transfer of ownership (art. 14): buyer is subrogated into the lease during the first 5/7 years regardless of Mortgage Law art. 34 (registered good-faith purchaser protection); beyond that, subrogation continues for the agreed term UNLESS art. 34 LH requirements are met, in which case the seller must compensate the tenant.
Death of tenant (art. 16): closed list of possible subrogates in priority order — spouse/cohabiting partner (2+ years, or with children), descendants under parental authority or cohabiting 2 years, ascendants cohabiting 2 years, siblings (same conditions), disabled relatives (≥65% disability, up to 3rd degree, cohabiting 2 years). No qualifying person → lease extinguished. Must notify landlord within 3 months of death or lease extinguishes.
Rent (art. 17): freely stipulated; paid monthly in the first 7 days unless agreed otherwise; landlord cannot demand more than 1 month's advance rent; payment via electronic means (cash only exceptionally). In declared stressed-market areas, rent caps limit new-contract rent to the prior contract's rent (± limited increases for renovation/energy/accessibility works, or 10+ year terms) and large holders are capped at the reference price index (art. 17.6–17.7); no Andalusian area had been declared as of 21 Oct 2026, so these caps do not apply in Málaga.
Rent update (art. 18): only if expressly agreed in the contract; if agreed but no index specified, uses the annual change in the IRAV (Índice de Referencia para la Actualización Anual de los Contratos de Arrendamiento de Vivienda, published by INE), and no agreed update may exceed the IRAV change (art. 18.1 as amended by RDL 29/2026). Temporary rule: for annual updates falling between 8 Oct 2026 and 31 Dec 2027, absent a new agreement the increase is capped at 2%, and there is no increase at all if the rent is above the reference-price index (RDL 29/2026, DF 6ª). No automatic update if silent.
Security deposit / fianza (art. 36): MANDATORY — 1 month's rent (housing) or 2 months' rent (other uses), in cash; not updatable during first 5/7 years; additional guarantees beyond the deposit capped at 2 months' rent for housing leases ≤5/7 years (1 month for temporary housing leases), and the tenant can never be required to take out rent-default insurance (art. 36.5 as amended by RDL 29/2026). At the end of the lease both parties must sign a document recording the dwelling's condition; without it, or if it records no damage, the dwelling is presumed returned in good condition (art. 36.7). Unreturned deposit accrues legal interest after 1 month from key handover.
Right of first refusal (art. 25): tenant has tanteo (30 calendar days from reliable notice of sale terms to exercise) and retracto (30 days from notice of the actual sale conditions, if tanteo notice was flawed/omitted or terms were actually more favorable to buyer) — since 8 Oct 2026 the tenant can no longer waive it (art. 25.8 as amended by RDL 29/2026). The tanteo notice lapses 180 days after it is given; when the dwelling is sold together with other properties or assets, the notice and the deed must state the price allocated to it and the right is not lost (art. 25.2, 25.5, 25.7); the sale cannot be registered without proof of the notices (art. 25.5).
Landlord's upkeep duty (art. 21): must keep dwelling habitable at no rent increase (except tenant-caused damage); if repairs last >20 days and deprive tenant of part of the dwelling, rent is reduced proportionally. Since 8 Oct 2026, for repairs affecting habitability, safety or health the tenant may send a written request with a reasonable quote; if within 15 calendar days the landlord neither accepts it, proposes an alternative nor does the repair, the tenant may do the works and deduct the cost from future rent (art. 21.5, RDL 29/2026).
Termination causes the landlord can invoke ipso iure (art. 27.2): non-payment of rent or agreed amounts, non-payment/non-renewal of deposit, unconsented subletting/assignment, bad-faith damage or unconsented works, unlawful/nuisance activities, dwelling ceasing to serve the tenant's permanent housing need. Tenant can terminate for landlord's failure to repair (art. 21) or landlord interference with use.
Other-use leases (Title III, arts. 29-35): mostly free agreement; art. 32 lets a business/professional tenant sublet/assign WITHOUT landlord consent (contrast with housing leases) but landlord gets a rent increase (10% partial sublease, 20% assignment/full sublease); art. 34 grants compensation to a retail tenant losing the premises after ≥5 years of activity provided the tenant stated, 4 months before expiry, the wish to renew for at least 5 more years at market rent; if the tenant reopens the same business in the same municipality within 6 months, compensation = moving costs + lost clientele; if not, and the landlord or a third party runs the same or a similar business there within 6 months, 1 month's rent per year of the lease (max. 18).
Pre-1985 contracts (transitional provisions): old rent-controlled ("frozen rent") contracts and business-premises leases from before 9 May 1985 remain under complex transitional regimes (old subrogation chains, gradual rent-review percentage tables) — mostly legacy/historical, unlikely to be tested in depth but worth knowing they exist and follow separate rules from the 1994 Law.
Spanish vocabulary
arrendamiento urbano
urban lease
arrendador / arrendatario
landlord / tenant
prórroga forzosa / tácita
compulsory / tacit extension
fianza
security deposit
desistimiento
withdrawal (from the contract)
subrogación
subrogation (succession into the lease)
tanteo y retracto
right of first offer and right of redemption
gran tenedor
large-scale property holder
zona de mercado residencial tensionado
stressed residential market area
desahucio
eviction
traspaso
transfer of a business premises lease
inquilinato
(old term for) residential tenancy
renta
rent
more uxorio
cohabiting as if married
Key citations
Art. 9 LAU — minimum lease term (5 years natural person / 7 years legal entity landlord) and compulsory extension.
Art. 14 LAU — subrogation of the buyer of a leased dwelling into the lease.
Art. 16 LAU — closed list of persons who may be subrogated on tenant's death.
Art. 25 LAU — tenant's right of first refusal (tanteo y retracto).
Art. 36 LAU — mandatory security deposit (1 month housing / 2 months other use).
Tema 9
The Lease Contract — Course Module on the LAU (Condensed Practitioner View)
Key concepts
Reform timeline (exam-relevant dates): Law 4/2013 set minimum duration at 3 years; RDL 7/2019 raised it to 5 years (7 if legal-entity landlord) + 3-year tacit extension + rent update capped at CPI; Law 12/2023 (Right to Housing) added stressed-market areas, the new rent-update reference index later published by INE as the IRAV (DA 11ª LAU; the older IGC came from Law 2/2015), the "gran tenedor" definition, extraordinary vulnerability extension, and mandatory electronic payment; RDL 29/2026 (in force 8 Oct 2026; validated by the Congress Standing Committee on 12 Nov 2026, BOE 13 Nov 2026) added the temporary housing lease, made the IRAV the default and the cap for rent updates, barred waiving the tenant's preferential purchase right and requiring rent-default insurance, and removed the large-dwelling carve-out.
Gran tenedor (large-scale holder) definition — precise threshold: a natural or legal person owning MORE than 10 residential urban properties OR more than 1,500 m² built (excluding garages/storage rooms); in a declared stressed area the region may lower it to owners of 5 or more residential properties there. Since 8 Oct 2026 the status is proven by a Land Registry certificate, and each dwelling unit in a building counts separately even without a registered horizontal division (art. 3.k Law 12/2023 as amended by RDL 29/2026). This threshold decides whether a vulnerable tenant's 1-year extension is mandatory (art. 10.2 LAU) and whether a new lease in a stressed area is capped at the reference-price index (art. 17.7); the 3-year stressed-area extension (art. 10.3) and the up-to-2-year extension of RDL 29/2026 DF 5ª bind every landlord.
VUT (vivienda de uso turístico) vs. seasonal lease — key distinction: since 8 Oct 2026 (RDL 29/2026) a lease for a tenant temporarily away from home for a justified, provable cause (work, studies, medical treatment) is a temporary housing lease under Title II of the LAU — more than 31 days, as a rule up to 12 months, the cause written in the contract or it becomes a habitual-residence lease (arts. 2.3, 7.2, 9 bis); seasonal contracts signed before then stay other-use leases until their term ends; a VUT (stays of at most 31 days, art. 5.e) is entirely OUTSIDE the LAU, governed by regional tourism regulations (Castilla y León: Decree 3/2017; Andalusia: Decree 28/2016) and requires a declaración responsable and entry in the regional tourism register (Andalusia: Registro de Turismo de Andalucía) — operating without it carries administrative sanctions; since 3 Apr 2025 the owner also needs the owners' community's prior express approval, voted by 3/5 of owners holding 3/5 of the quotas (LPH arts. 7.3, 17.12), unless the VUT was already operating under the tourism rules before then (LPH DA 2ª). The agent must correctly classify the arrangement before drafting.
Land Registry recording: a lease must be recorded in the Land Registry to be effective against third parties who have a registered right (this is what protects a tenant against a later registered buyer/mortgagee beyond the LAU's own minimum-term subrogation rules).
Rent-update reference: the cap is the IRAV, an index INE publishes every month — use the value for the month of each update, not a fixed yearly figure (art. 18.1 and DA 11ª LAU). For annual updates due between 8 Oct 2026 and 31 Dec 2027, absent a new agreement the increase is capped at 2% (none if the rent is above the reference-price index) (RDL 29/2026, DF 6ª).
Deposit (fianza) administrative mechanics: where a region requires it (DA 3ª LAU), the landlord must LODGE the deposit with the competent regional body within a set period (Castilla y León: Junta de Castilla y León, 30 business days) — separate from the LAU's civil regime of returning it to the tenant. Andalusia dropped this on 24 Jan 2026: the Junta (formerly through AVRA) no longer holds deposits, and those lodged earlier are refunded on request as each lease ends (Ley 5/2025, DA 6ª); the landlord still takes the 1-month fianza from the tenant (art. 36.1). Total guarantee ceiling for habitual-residence leases: deposit (1 month) + additional guarantees (max 2 months) = max 3 months total.
Comparative snapshot (residential vs. other-use lease): duration (5/7-yr minimum vs. free agreement/no minimum); assignment/subletting (written consent required vs. free if business activity, with 10%/20% rent increase to landlord); deposit (1 month vs. 2 months); rent update (index-capped vs. freely agreed); compensation to tenant on expiry (none for housing vs. available for retail/commercial premises under art. 34).
Spanish vocabulary
VUT (vivienda de uso turístico)
tourist-use dwelling
arrendamiento de temporada
seasonal lease
gran tenedor
large-scale property holder
índice de referencia de precios
reference price index
IGC (Índice de Garantía de Competitividad)
Competitiveness Guarantee Index
AVRA
Andalusian Housing and Rehabilitation Agency
Junta de Castilla y León
Castilla y León regional government
fianza legal
mandatory legal deposit
garantías adicionales
additional guarantees
SOCIMI
Spanish REIT
Key citations
Law 4/2013, RDL 7/2019, Law 12/2023 — successive LAU reforms (3yr → 5/7yr minimum term → stressed areas/gran tenedor).
Art. 5(e) LAU — VUT exclusion from LAU scope, governed by regional tourism rules.
Art. 36 LAU (the deposit) + DA 3ª LAU and regional rules — lodging it with the regional body where a region requires it; abolished in Andalusia since 24 Jan 2026 (Ley 5/2025, DA 6ª).
Tema 10
Law 49/1960 on Horizontal Property (LPH) — Primary Legislative Text
Key concepts
LPH develops art. 396 CC (horizontal property/condominium). Each flat/unit carries a DUAL right (art. 3): (a) exclusive individual ownership of the private space + elements serving it exclusively, and (b) co-ownership of common elements — these two rights are inseparably united, cannot be sold apart from each other.
Participation quota (cuota de participación, art. 5): assigned in the title deed based on useful floor area, location, and presumed use of common elements; expressed in hundredths of the building's total value; serves as the module for both charges and benefits. Improvements/impairments to a unit do NOT change its quota (only changeable per arts. 10 and 17 procedures).
No action for partition (acción de división) can dissolve horizontal property (art. 4) — distinguishes it from ordinary co-ownership (comunidad de bienes).
Title deed (título constitutivo, art. 5) describes the building + each unit (area, boundaries, floor, annexes) and sets quotas; may include bylaws (estatutos) — private bylaws don't bind third parties unless registered in the Land Registry.
Owner obligations (art. 9): respect common elements; maintain own unit to avoid harm to others; allow access for necessary repairs/easements; contribute to general expenses per quota (art. 9.1.e) — non-use of a service does NOT exempt from paying for it; contribute to the mandatory reserve fund (fondo de reserva, min. 10% of last ordinary budget — art. 9.1.f); communicate an address for notices, and any change of ownership (failure = joint liability with new owner for post-transfer debts).
Community debt real charge (afección real): unpaid community expenses attach to the flat/unit — a buyer is liable, WITH the property itself, for the previous owners' unpaid community debts for the part of the current year already due + the 3 preceding calendar years (art. 9.1.e); the seller must declare being up-to-date (or state what's owed) in the sale deed and provide a certificate of debts, without which the notary cannot authorize the deed (unless the buyer expressly waives this) — critical agent due-diligence checkpoint. Community debt claims for these periods are PREFERENTIAL: they rank ahead of a registered mortgage and registered attachments (art. 1923.3º–5º CC), but not ahead of the last year's taxes on the property or insurance premiums (art. 1923.1º–2º), and wage claims keep their preference.
Governing bodies (art. 13): Assembly of owners, President (+ optional Vice-Presidents), Secretary, Administrator — secretary/administrator roles can be combined with presidency or separated; terms default to 1 year unless bylaws say otherwise.
Voting majority thresholds — a key exam area (art. 17):
1/3 owners + 1/3 quotas: telecom infrastructure, renewable-energy/new-supply infrastructure installation (non-consenting owners can't be charged unless they later opt in).
Simple majority (majority of owners + majority of quotas): accessibility works/lift installation (mandatory to pay even beyond 12 months' ordinary fees once approved) — and NO vote is needed when owners in whose unit a person with a disability or over 70 lives, works or volunteers request them, if the annual cost passed on after subsidies is at most 12 months' ordinary fees (spread over as many years as any financing allows), or if the requesters pay the excess; since 23 Oct 2026 (Law 4/2026) the community must apply for the aid calls the requester points to, and once aid actually granted reaches 70% of the cost the works are compulsory with no cost cap (art. 10.1.b); energy-efficiency works (if annual cost after subsidies ≤12 monthly instalments — dissenters can't opt out here either).
3/5 owners + 3/5 quotas: establishing/discontinuing concierge/security services; leasing unassigned common elements; non-required innovations/improvements above 3 months' ordinary fees (dissenters NOT bound, can opt in later by paying updated cost); physical division/merger/segregation of units, new floors, structural alterations; approving/restricting/prohibiting tourist-use (VUT) activity in a unit.
Unanimity: any resolution amending the title deed or bylaws not otherwise covered.
Ordinary/other resolutions: majority of ALL owners representing a majority of ALL quotas on first call; on second call, a majority of those present representing more than half of the quotas of those present (art. 17.7).
Silence rule (art. 17.8): absent owners duly summoned are counted as voting IN FAVOR if they don't object in writing within 30 calendar days of being informed of the resolution (except where cost can't be passed on to dissenters, or private-use modifications).
Owners not up to date on community debts (and not having judicially challenged or deposited the amount) may attend the Assembly but CANNOT VOTE (art. 15.2) — recorded in the minutes, excluded from majority calculations.
Challenging Assembly resolutions (art. 18): grounds — contrary to law/bylaws, seriously prejudicial to the community for one owner's benefit, serious harm to an owner with no legal duty to bear it, or abuse of right. Standing: owners who voted against, absentees, and those improperly denied a vote — but the challenger must be current on community debts (or deposit them) to have standing (exception: challenges about quota-setting). Deadline: 3 months generally, 1 year for resolutions contrary to law/bylaws, counted from the resolution; for absent owners, from when it was notified to them under art. 9 (art. 18.3).
Debt collection: community can use the special "proceso monitorio" (payment-order) procedure against the registered owner; if the debtor opposes, the community may request a precautionary attachment, which the court grants without the community posting security (art. 21.4).
Extinction of horizontal property (art. 23): destruction of the building (presumed when reconstruction cost exceeds 50% of the property's value, unless insurance covers the excess), or conversion to ordinary co-ownership.
Private real-estate complexes / urbanizaciones (art. 24): 2+ independent buildings/plots sharing indivisible co-ownership of common elements (roads, installations); may constitute as a single community (fully subject to LPH) or as a grouping/federation of communities (agrupación de comunidades) with its own president-based Assembly and quota system, competence limited to shared elements only.
VUT approval within a community (art. 7.3 + 17.12, since 3 April 2025): an owner wanting to start a tourist-use dwelling needs the community's EXPRESS prior approval by 3/5 majority; an owner already operating one under the tourist rules before that date may carry on under those rules' conditions and deadlines (DA 2ª); the community can also approve/restrict/prohibit such activity and set special expense quotas (increase capped at 20%, non-retroactive).
Spanish vocabulary
propiedad horizontal
horizontal property / condominium regime
elementos comunes / privativos
common / private elements
cuota de participación
participation quota
título constitutivo
title deed (constituting the regime)
estatutos
community bylaws
junta de propietarios
assembly of owners
fondo de reserva
reserve fund
afección real
real charge (debt attaching to the property)
certificado de deudas
certificate of community debts
proceso monitorio
payment-order (summary debt) procedure
impugnación de acuerdos
challenging assembly resolutions
complejo inmobiliario privado
private real-estate complex
VUT (vivienda de uso turístico)
tourist-use dwelling
Key citations
Art. 396 CC — foundational definition of horizontal property, developed by the LPH.
Art. 9 LPH — owner obligations; buyer's liability for prior owner's unpaid community debts (current year + 3 prior years).
Art. 17 LPH — voting majority thresholds for different types of resolutions.
Art. 18 LPH — grounds, standing, and deadlines (3 months / 1 year) to challenge Assembly resolutions.
Art. 23 LPH — extinction of the horizontal property regime.
LPH reform timeline (exam-relevant): Law 8/1999 (strengthened default-owner regime, introduced reserve fund at 5%, accessibility works); RDL 7/2019 (reserve fund minimum raised to 10%); Law 10/2022 (rehabilitation push: energy-efficiency works by simple majority, wider reserve-fund uses, deterrent measures against arrears); Law 12/2023 Right to Housing (indirect impact — gran tenedor definition, stressed areas relevant to buildings under horizontal property); LO 1/2025 (from 3 April 2025 a new tourist let needs the community's prior 3/5 approval, arts. 7.3 and 17.12).
Horizontal property vs. related figures: unlike ordinary co-ownership (comunidad de bienes, CC), no co-owner can demand division/partition of common elements; unlike ordinary co-ownership generally, there is NO right of first refusal/redemption between flat owners on a sale (contrast this with rustic-property retracto de colindantes and other tenant/co-owner retractos elsewhere in the course).
Classification of common elements (illustrative, from art. 396 CC): structural (ground, foundations, roof, load-bearing walls), building envelope (facades, exterior of terraces/balconies), interior access/communication (stairs, lobby, lifts), general installations (water/gas/electricity/heating up to the entry point into the private space), and "privately used but commonly owned" elements (exclusive-use but indivisible — e.g., a private-use community terrace).
Bylaws (estatutos) vs. internal regulations (reglamento de régimen interior) — key distinction table: bylaws govern the exercise of ownership/community life (use, expenses, administration); as a rule they need UNANIMITY to approve/amend (art. 17.6), but art. 17 sets lower majorities even where the bylaws change, e.g. 3/5 to approve, limit or ban tourist lets (art. 17.12; since 3 April 2025 a new tourist let needs that prior approval, art. 7.3) and a simple majority for accessibility works and lifts (art. 17.2); they only bind third parties if registered; internal regulations govern day-to-day coexistence (pool hours, lift use) and only need a majority to approve/amend, bind owners/occupants but are NOT registrable and have no third-party effect.
Use restrictions in registered bylaws bind subsequent buyers even if they didn't know about them at purchase (registry public faith cuts against, not just for, third parties) — the agent must check bylaws before marketing a commercial unit for restricted uses (e.g., hospitality ban).
Reserve fund practicalities: belongs collectively to the community (cannot be distributed to individual owners except at extinction); purpose limited to conservation/repair, rehabilitation, and building insurance; on a sale, the seller's share of the fund stays with the community — the seller cannot claim it back from the buyer.
Debt-collection payment-order procedure (proceso monitorio): the initial petition needs no lawyer or procurador whatever the amount (art. 814.2 LEC); if the debtor opposes, they are needed once the claim exceeds €2,000 (arts. 23, 31 and 818 LEC). File with the Court of First Instance: (1) the certificate of the assembly's debt-liquidation resolution, issued by the secretary with the president's approval and stating the amount and its breakdown, (2) proof that the debt was notified to the debtor (or posted on the community notice board for at least 3 days) (art. 21.3 LPH), and (3) since 3 April 2025, proof of a prior attempt to negotiate (MASC), without which the petition can be refused (art. 5.2 LO 1/2025; arts. 264.4 and 403.2 LEC). If the debtor neither pays nor opposes within 20 days, the monitorio ends and execution is issued on the community's request; suing the registered owner lets the execution reach the flat (art. 816 LEC, art. 21.2 LPH).
Defaulting owner: can attend the assembly but not vote (while debt persists and is not judicially challenged); loses the vote; and since Law 10/2022 the assembly may adopt deterrent measures for as long as the arrears last — interest above the legal rate or temporary suspension of the use of services or facilities — if not abusive or disproportionate and never affecting habitability (art. 21.1).
Extinction effects (beyond the two causes already noted): cancellation of independent registry folios per unit, reopening of the parent registry record, settlement of pending community rights/obligations, and distribution of remaining community assets (notably the reserve fund) among owners per their quotas.
Spanish vocabulary
reglamento de régimen interior
internal regulations (house rules)
comunidad de bienes
ordinary co-ownership
acción de división
action for partition
administrador de fincas
property administrator
presupuesto ordinario / extraordinario
ordinary / extraordinary budget
derrama
special assessment
morosidad
arrears/default (on community fees)
proceso monitorio
payment-order procedure
finca matriz
parent property record
certificado de deudas
certificate of debts
Key citations
Law 8/1999 — introduced the reserve fund and strengthened the LPH's default-owner regime.
Royal Decree-law 7/2019 — raised the mandatory reserve fund minimum from 5% to 10% of the last ordinary budget (Law 10/2022 kept the 10% and widened the fund's uses).
Art. 21 LPH — payment-order (proceso monitorio) debt-collection procedure; no lawyer or procurador needed for the initial petition (art. 814.2 LEC); above €2,000 they are needed if the debtor opposes.
Tema 12
Law 49/2003 on Rural Leases (LAR) — Primary Legislative Text
Key concepts
Rural lease (art. 1): temporary transfer of one or more rural properties (or part) for agricultural, livestock, or forestry use in exchange for rent; agreement of the parties governs first, then the LAR, then supplementarily the CC/custom. Lease of a "holding" (explotación, art. 2) treats the whole organic productive unit as the object, with an inventory attached.
Excluded from LAR (art. 6): seasonal leases under one agricultural year, land tilled/prepared at owner's expense for specified sowing, expropriated-for-public-utility properties, secondary uses (stubble grazing, montanera, hunting, fallow improvement), industrial livestock operations, communal/local-corporation property and montes vecinales en mano común.
Non-application (art. 7): LAU-scope leases, or properties that are urban/developable land, or where non-rural income exceeds double the rural income — landlord can then terminate with 1 year's notice if this arises mid-contract.
Party capacity (art. 9): "professional farmer" (agricultor profesional) = annual gross agricultural income > 2x IPREM, with ≥25% of working time dedicated to the activity. Foreign persons and entities CANNOT be tenants except EU/EEA nationals (and nationals of countries a convention gives the same regime), non-Spanish individuals with permanent residence in Spain, and companies/entities of other states that grant Spaniards reciprocity (entities only, not individuals). Land-accumulation cap: a person already holding agricultural land cannot lease more land beyond regionally-set limits, capped nationally at 500 ha dry land / 50 ha irrigated (1,000 ha for extensive livestock use) — multiplied by membership count for agricultural cooperatives.
Form (art. 11): contracts must be in writing; either party can compel formalization in a public deed (cost borne by requester); if rent is unset, market rent for the area applies; a deed transferring a rural property must state whether it is leased, as a condition of Land Registry inscription.
Duration (art. 12) — key exam fact: MINIMUM 5 years — shorter clauses are void and deemed not written. If landlord doesn't give reliable notice 1 year before term expiry, the contract is automatically extended for another 5-year period, indefinitely repeating until validly terminated.
Rent (art. 13): freely fixed in money (in-kind rent must be converted); no rent review unless expressly agreed; if agreed without specifying an index, uses the IGC (Competitiveness Guarantee Index). Payment (art. 14) defaults to cash, in arrears, annually, at the tenant's domicile if not agreed.
Expenses/improvements (arts. 17-21): landlord bears maintenance/repair costs needed to keep the property fit for use, WITHOUT rent increase (art. 18) — if landlord fails after being required, tenant may compel judicially, terminate, get a proportional rent reduction, or do the repairs and offset the cost against rent. Landlord bears legally/judicially mandated transformation works and irrigation-modernization works ordered by the irrigators' community (art. 19) — if these amount to a genuine production-increasing transformation, landlord can raise rent proportionally (or rescind if tenant disagrees). Tenant bears ordinary operational improvements typical of running the farm (art. 20) — presumed made at tenant's own expense; tenant can claim compensation for value increase from consented improvements at contract end.
Transfer & first-refusal/redemption rights (art. 22) — landmark reversal of Roman law principle: unlike ordinary property sales, the BUYER of a leased rural property is subrogated into the lease even if protected by Mortgage Law art. 34 (reversing "emptor non tenetur stare colono" / art. 1571 CC); an art. 34-protected buyer must respect only the rest of the 5-year minimum or of the tacit extension running, any other buyer the full agreed term. A professional-farmer tenant has right of first refusal (tanteo, 60 business days from reliable notice) and redemption (retracto, 60 business days from awareness) on any inter vivos transfer (sale, donation, exchange, etc.) of the leased property — EXCEPT gratuitous transfers to close relatives (ascendant/descendant/2nd-degree relative/spouse), or small consolidating exchanges (<10 ha dry/<1 ha irrigated). These rights are subordinate ONLY to the retracto de colindantes (adjoining-owner redemption, art. 1523 CC) when neither plot exceeds 1 hectare.
Assignment/subletting (art. 23): requires landlord's express consent, EXCEPT to the tenant's spouse or descendants (still requires notice within 60 business days); must cover the whole property, for the entire remaining term, at a rent not exceeding what the tenant pays.
Termination causes (art. 24): total loss/expropriation, expiry of term/extension, mutual agreement, tenant's unilateral withdrawal (1 year's notice, at agricultural-year end), tenant's death (succession preference: young farmer status, else majority choice among heirs, notify landlord within 1 year), dissolution of a tenant legal entity, termination of landlord's right. Landlord-initiated termination (art. 25): non-payment (tenant can cure/enervación, as in urban eviction), serious breach of improvement obligations, failure to work the land or diverting its use, unauthorized subletting/assignment, art. 7.1 circumstances arising, serious willful/negligent damage.
Sharecropping (aparcería, arts. 28-32): owner assigns use/enjoyment + possibly livestock/machinery/capital, sharing produce proportionally to contributions; presumed NOT an employment relationship unless expressly agreed; default duration = 1 agricultural year with automatic 1-year extensions; sharecropper gets preferential right to become tenant if owner later wants to lease the land. Associative sharecropping (aparcería asociativa, art. 32): profit-sharing joint ventures governed by partnership-contract rules absent specific agreement.
Art. 22 LAR — buyer subrogated into the lease regardless of Mortgage Law art. 34; tenant's tanteo/retracto (60 business days).
Art. 23 LAR — assignment/subletting rules (landlord consent, except spouse/descendants).
Art. 25 LAR — grounds for landlord-initiated termination.
Tema 13
Rustic Properties — Course Module on the LAR (Condensed Practitioner View)
Key concepts
Contract characteristics of the rustic lease: consensual (perfected by consent, delivery needed only for effectiveness), onerous, fixed-term (indefinite/lifetime leases prohibited), bilateral, successive-performance, formal-but-not-ad-solemnitatem (writing required by art. 11 LAR but its absence doesn't void the contract — either party can compel formalization).
Source hierarchy (art. 1.2 LAR): (1) express party agreement not contravening the LAR, (2) CC suppletorily, (3) usage/custom. LAR amended by Law 26/2005 (minimum term raised from 3 to 5 years, professional-farmer concept and the tenant's tanteo/retracto reintroduced, land-accumulation limits restored, assignment/sub-lease to spouse or descendants without landlord consent, tenant's right to cure non-payment).
Professional farmer — concrete numeric example worth memorizing: monthly IPREM ≈ €600 (2024 reference, updates annually) → annual IPREM ≈ €7,200 → threshold = 2x annual IPREM ≈ €14,400/year gross agricultural income, PLUS ≥25% of working time dedicated to the activity. Both conditions must be met simultaneously.
Minor as landlord: property must be leased on their behalf by parental-authority holders/guardian; once emancipated, the minor can end the lease after the 5-year minimum term has run, by notifying the tenant within 6 months of emancipation (or of the date when 1 year of the minimum term remains); the termination takes effect only 1 year after it is given (art. 9.4 LAR).
Landlord's core obligations: deliver property fit for agreed use; maintain tenant in peaceful/useful possession (liable for eviction and latent defects); necessary works/repairs at no rent increase; force-majeure exception (non-compensable damage costing more than 1 year's rent → landlord not obliged to repair, tenant chooses rescission or continuation with reduced rent); bear legally/judicially mandated improvement works.
Tenant's core obligations: diligent farming per the agreed purpose and good agricultural practice (cannot leave land uncultivated or change its use without authorization); maintain boundary enclosures (walls/fences/hedges/ditches) absent express agreement otherwise; bear ordinary operational repairs typical of running the farm; return the property in received condition (normal wear excepted).
Rent-reduction rule for crop loss (art. 1575 CC, suppletory): tenant can request proportional rent reduction if MORE than half the produce is lost to extraordinary, unforeseeable fortuitous events (hail, fire, locusts, unusual pest/flooding) — can be excluded by a special agreement in the contract (art. 1575 CC: 'salvo siempre el pacto especial en contrario'), no retroactive effect (applies only to the loss year), does not apply if the loss was foreseeable or under half.
⚠ Note: this module states the tenant's preferential acquisition right on sale is 30 days for tanteo (first refusal) + 60 days for retracto (redemption) counted from Land Registry registration of the sale — this differs from the primary LAR text (Tema 12), which specifies 60 BUSINESS days for both tanteo (from receipt of notice) and retracto (from awareness/notice of the actual sale terms). Treat the primary legislative text (art. 22 LAR, Tema 12) as authoritative for exam purposes if the two conflict, but be alert that course materials themselves are inconsistent on this point.
Sharecropping (aparcería) vs. lease — comparative distinction table: lease = fixed money rent, risk borne solely by tenant, 5-year minimum; sharecropping = aliquot share of produce (no fixed rent), risk SHARED between owner and sharecropper, duration freely agreed (default 1 agricultural year, renewable annually). Practical test: fixed money rent → lease; shared produce → sharecropping — this distinction changes the whole applicable legal/tax regime.
Tax regime of the rustic lease (exam-relevant specifics):
IRPF: landlord taxed on rent as income from real property capital (or as economic-activity income only if the leasing is run with at least one full-time employee, art. 27.2 LIRPF; being a professional farmer does not change this, and leasing a whole holding as a going business is movable-capital income, art. 25.4.c LIRPF); tenant (professional farmer) deducts rent paid as a business expense.
VAT: rustic land leased for agricultural/livestock/forestry use is EXEMPT from VAT (art. 20.One.23 LIVA) — no VAT charged on the rent invoice. If actual use is non-agricultural (storage, industrial, solar installations on rustic land), the exemption fails and the general 21% rate applies — misapplying the exemption risks tax penalties for the landlord.
IBI: paid by the owner-landlord as cadastral titleholder by default; can be contractually shifted to the tenant as an added expense.
ITP: the LEASE itself is subject to ITP under the "leases" modality, with the TENANT as taxpayer; rate varies by autonomous community.
Comparative summary LAU vs. LAR (housing/urban lease vs. rustic lease): purpose (housing/other use vs. agricultural-livestock-forestry); tenant qualification (anyone in LAU; in LAR natural or legal persons, art. 9.1, but foreign persons and entities cannot be tenants unless EU/EEA nationals, permanent residents or reciprocity cases, art. 9.7, and natural persons already holding land above the regional limits (max. 500 ha dry/50 ha irrigated) are barred, art. 9.6 — a company needs farming in its corporate purpose, art. 9.3; professional-farmer status matters only for the tenant's tanteo/retracto, art. 22.2 LAR); minimum duration (5/7 years for habitual-home leases, through mandatory annual extensions the tenant may decline, art. 9 LAU; temporary housing leases over 31 days and as a rule up to 12 months, art. 9 bis; other uses freely agreed; vs. 5 years with indefinite 5-year renewals); rent (free at signing, capped at signing only in declared stressed zones, art. 17.6–7 LAU; annual updates of housing leases capped by the IRAV index, art. 18.1 LAU, and for updates due until 31 Dec 2027 at 2% absent a new agreement, none if the rent exceeds the reference-index ceiling, DF 6ª RDL 29/2026; vs. free, no cap); right of first refusal (no longer waivable in LAU: art. 25.8 LAU as amended by Real Decreto-ley 29/2026, in force from 8 October 2026 and validated by Congress on 12 November 2026; vs. present but course-material-inconsistent timing in LAR); VAT (housing exempt, other-use 21% in LAU vs. exempt if genuinely agricultural in LAR).
Spanish vocabulary
arrendamiento rústico
rustic lease
aparcero
sharecropper
explotación agraria
agricultural holding
IPREM
Public Multiple-Effects Income Indicator
pérdida de frutos
loss of produce/crops
deslinde de fincas
property boundary demarcation
IRPF
personal income tax
LIVA
VAT Law
IBI
real estate (property) tax
ITP
transfer tax
joven agricultor
young farmer
Key citations
Art. 1575 CC — rent reduction for extraordinary crop loss (>50%, unforeseeable).
Art. 20.One.23 LIVA — VAT exemption for agricultural/livestock/forestry rustic leases.
Law 26/2005 — amended the LAR (professional farmer concept, sub-lease/assignment, termination grounds).
Tema 14
Law 29/1987 on Inheritance and Gift Tax (ISD) — Primary Legislative Text
Key concepts
ISD (Impuesto sobre Sucesiones y Donaciones): direct, subjective tax on GRATUITOUS wealth increases of NATURAL persons only (art. 1) — gratuitous increases to legal persons are taxed under Corporate Income Tax instead (art. 3.2), not ISD.
Taxable event (art. 3): (a) mortis causa acquisitions (inheritance, legacy, succession), (b) inter vivos gratuitous acquisitions (gifts), (c) life-insurance payouts where the policyholder differs from the beneficiary.
Taxpayers (art. 5): successors-in-title (causahabientes) for inheritance; donee for gifts; beneficiary for life insurance. Personal liability (art. 6) applies to Spanish habitual residents (worldwide assets); real/in rem liability (art. 7) applies to non-residents, but only for assets located/exercisable in Spain.
Taxable base for real property (art. 9.3): the CADASTRAL "reference value" (valor de referencia) as of accrual date — UNLESS the declared value is higher, in which case the higher declared value is used. This reference value replaced the old "real/market value" standard and can only be challenged via appeal of the assessment or a self-assessment rectification request, with a binding report from the Directorate-General for the Cadastre.
Additions to the estate (art. 11) — anti-avoidance presumptions: assets the decedent held up to 1 year before death (unless proven transferred to a non-heir); assets acquired for consideration in usufruct by decedent + bare ownership by an heir/close relative within the prior 3 years; assets transferred by decedent within 4 years before death while reserving usufruct/life interest for themselves.
Deductible encumbrances (art. 12): only perpetual/temporary/redeemable charges that actually reduce the asset's value (e.g., censos) — mortgages/pledges are NOT deductible as encumbrances (though the underlying secured debt may be deductible as a debt). Deductible debts (art. 13): decedent's outstanding debts, evidenced by public/private document, EXCEPT debts owed to heirs/aliquot legatees/their spouses-ascendants-descendants-siblings (anti-fraud rule).
Household goods (ajuar doméstico, art. 15): presumed at 3% of the estate unless the heirs declare more or prove less or none; under Supreme Court case law since 2020, the 3% is taken only on assets that can serve the deceased's personal or household use, so money, securities, shares, real estate and other intangibles are left out without any proof.
Reduction table by kinship group (art. 20.2) — key numeric exam material: Group I (descendants/adopted <21 yrs): €15,956.87 + €3,990.72/year under 21, capped at €47,858.59. Group II (descendants/adopted ≥21, spouses, ascendants): €15,956.87. Group III (2nd/3rd-degree collateral relatives, ascendants/descendants by affinity): €7,993.46 (€10,000 in Andalusia, art. 28 Law 5/2021). Group IV (4th-degree or more distant/unrelated): NO reduction. Additional disability reductions: €47,858.59 (33-65% disability) or €150,253.03 (≥65% disability); in Andalusia €250,000 or €500,000, on top of the kinship reduction (art. 29 Law 5/2021).
Life insurance reduction: 100% reduction up to €9,195.49 for spouse/ascendant/descendant/adopting-adopted beneficiaries (single reduction per taxpayer regardless of number of policies); unlimited/uncapped for terrorism-related or humanitarian-mission life insurance.
95% reduction for family business/habitual residence (art. 20.2.c): applies to sole proprietorships, professional businesses, or qualifying entity holdings (Wealth Tax art. 4.8 exemption) passing to spouse/descendants — 95% reduction, MUST retain the acquisition for 10 years post-death (else must repay tax + default interest); in Andalusia (arts. 30–31 Law 5/2021) the reduction is 99%, open to Groups I–III (and to long-serving managers in Group IV), with a 3-year retention period. Habitual residence of the deceased: same 95% reduction, capped at €122,606.47 per taxpayer, for spouse/ascendants/descendants, OR a collateral relative over 65 who cohabited with the decedent for the 2 years before death.
Rate schedule (art. 21) — progressive brackets from 7.65% (up to €7,993.46) rising to 34% (above €797,555.08) on net taxable base, when the Autonomous Community hasn't set its own schedule. Andalusia (Costa del Sol) has its own rules (Andalusian Law 5/2021): on inheritances, a €1,000,000 reduction for Groups I and II (art. 28) and 99% instead of 95% for the deceased's habitual residence, kept for 3 years (art. 27); rates from 7% to 26% (art. 37); flat coefficients 1.0 (Groups I/II), 1.5 (III), 1.9 (IV) (art. 38); and a 99% bonus on the tax due for Groups I and II, on inheritances (art. 39) and on gifts (art. 40). The gift bonus covers only assets declared without a prior tax-office request; above €5,000 (adding the same donor's gifts to the same donee in the previous 3 years) the gift needs a public deed, and for cash or bank deposits the deed must be signed within one month of the transfer and state the origin of the funds, which must be justified. Non-residents may apply these regional rules where the deceased lived in Andalusia, where most of the Spanish estate lies there, or where the gifted property is there (DA 2ª Law 29/1987).
Multiplying coefficients by pre-existing wealth + kinship group (art. 22) — this is what makes the tax dramatically higher for distant/unrelated heirs: coefficients range from 1.0000 (Groups I/II, wealth ≤€402,678.11) up to 2.4000 (Group IV, wealth >€4,020,770.98) — Group IV pays roughly DOUBLE the base tax liability compared to close relatives even at the lowest wealth bracket (2.0000 vs 1.0000).
Usufruct valuation (art. 26): temporary usufruct = 2% of total value per year (capped 70%); life usufruct = 70% minus 1% per year of usufructuary's age above 19 (minimum 10%). Bare ownership value = total value minus usufruct value.
Accrual (art. 24): mortis causa tax accrues on date of death (or final declaration of absence); inter vivos gifts accrue on the date of the act/contract. Suspended-effect acquisitions (condition/term/trust) accrue when the limitation ceases.
Accumulation rule (art. 30): gifts between the SAME donor-donee within 3 years are treated as a single transfer for tax-rate purposes (average-rate mechanism) — an anti-fragmentation rule agents must flag for clients doing staged property gifts.
Formal control mechanism (art. 33): documents evidencing a taxable ISD act CANNOT be registered/take effect in public offices or registries (including the Land Registry) unless proof of tax assessment submission is shown — critical for agents: an inherited/gifted property cannot be registered without first dealing with ISD. The Registry likewise will not register a transfer that triggers municipal plusvalía (IIVTNU) until the plusvalía return, or the communication under art. 110.6.b TRLRHL, has been filed (art. 254.5 LH).
Ceuta/Melilla tax credit (art. 23 bis): 50% credit generally, RISING to 99% for Groups I/II mortis causa acquisitions where the decedent had habitual residence there for the preceding 5 years.
Spanish vocabulary
ISD (Impuesto sobre Sucesiones y Donaciones)
Inheritance and Gift Tax
causahabiente
successor-in-title (heir/legatee)
valor de referencia
cadastral reference value
ajuar doméstico
household goods
patrimonio preexistente
pre-existing wealth (of the acquirer)
coeficiente multiplicador
multiplying coefficient
reducción por parentesco
reduction based on degree of kinship
desmembración del dominio
splitting of ownership (usufruct/bare ownership)
nuda propiedad
bare ownership
devengo
accrual (of the tax)
autoliquidación
self-assessment
Key citations
Art. 3 (Law 29/1987) — taxable event of ISD (mortis causa, inter vivos gifts, life insurance).
Art. 9.3 — real property valued at the cadastral reference value (or higher declared value).
Art. 20.2 — reduction table by kinship group (Groups I-IV) and their euro amounts.
Art. 20.2.c — 95% reduction for family business / habitual residence, with 10-year retention requirement.
Art. 22 — multiplying coefficients by pre-existing wealth and kinship group.
Art. 33 — no registration/public effect for ISD-subject documents without proof of tax assessment.
Tema 15
Gift, Loan (Comodato/Mutuo), and Mandate Contracts
Key concepts
Gift/donación (art. 618 CC): gratuitous act of liberality, donor disposes of a thing, donee accepts. Perfected when the DONOR becomes aware of the donee's acceptance (not when the donee accepts) — if donor dies before learning of acceptance, the gift has no effect. Characteristics: gratuitous, requires animus donandi (intent to enrich), consensual (delivery needed for consummation, not perfection), irrevocable in principle (only 3 exhaustive statutory grounds), a named contract (arts. 618-656 CC).
Real element limits on gifting: donor must reserve what's needed to live on (else the gift is rescindable); quantitative cap — cannot give by gift more than could be given by will (excess = inofficious gift, donación inoficiosa, reducible by forced heirs after death); cannot gift FUTURE assets (art. 635 CC).
Form for real property gifts (art. 633 CC) — critical exam point: PUBLIC DEED mandatory ad solemnitatem (not just for evidence) — absence causes RADICAL NULLITY, not curable even by delivery of possession or by later private document. Acceptance must occur during donor's lifetime, in the same or a separate deed (if separate, must be authentically notified to donor).
Types of gift: inter vivos (ordinary) vs. mortis causa (takes effect at death, donee must survive donor, governed by testamentary rules); remuneratory (payment for services that were natural, not enforceable, obligations); modal/sub modo (donee must fulfill a charge of lesser value than the gift; donor liable for hidden defects up to the charge's value); with power to dispose (art. 639 CC, donor reserves right to dispose of part); with reversion clause (art. 641 CC, assets return to donor/limited third party on a stipulated event).
Revocation grounds — the only 3 exhaustive cases: (1) subsequent birth/existence of children, only where the donor had no children or descendants when making the gift (art. 644 CC) — 5-year action period from learning of the birth of the last child, or that a child believed dead is alive (art. 646 CC); (2) breach of modal charge (art. 647 CC) — 4-year period from the breach; (3) donee's ingratitude (art. 648 CC — crime against donor, false accusation, wrongful denial of support) — 1-year period from when donor learned of the fact. Effects differ: breach of charge — assets return to donor, donee's sales/mortgages void, subject to Mortgage Law protection of third parties (art. 647 CC); later children — assets return, or their value if the donee sold them, and the donor may pay off a mortgage and reclaim it from the donee (art. 645 CC); ingratitude — sales/mortgages made before the claim is noted in the Land Registry stand, later ones are void (arts. 649-650 CC).
Inofficious gift reduction: only forced heirs can request it, only after donor's death, testamentary dispositions reduced FIRST, then gifts starting with the MOST RECENT; 5-year limitation from opening of succession (donor's death).
Gift tax treatment: donee is the ISD taxpayer (not the donor); donor may still owe IRPF on any capital gain if the gift's value exceeds acquisition cost (no reinvestment exemption for gifts, unlike a sale of primary residence; but the gain is exempt when a donor over 65, or in severe or great dependency, gifts the home that has been their habitual residence for 3+ continuous years, art. 33.4.b and DA 23 LIRPF); a private gift is not subject to VAT (business/professional gifts of business assets can trigger self-consumption VAT); ISD filing deadline in Andalusia = TWO MONTHS from the day after the gift date (art. 68 Andalusian Law 5/2021); the state term of 30 BUSINESS days (art. 67.1.b RISD) applies where the AEAT manages the tax, e.g. a donee not resident in Spain. Triple tax cost to flag for clients gifting real property: donee's ISD, donor's IRPF capital gain, and municipal capital gains tax (IIVTNU/plusvalía municipal), which on a gift is paid by the DONEE as acquirer, not by the donor (art. 106.1.a TRLRHL).
Loan contract (art. 1740 CC) splits into commodatum (comodato, loan FOR USE) and mutuum (mutuo, loan for CONSUMPTION) — both are REAL contracts (perfected by delivery).
Comodato: non-fungible object, only possession/use transfers (lender keeps ownership), essentially gratuitous (no interest possible), same thing returned, borrower bears risk only if misusing/overholding it (arts. 1740-1749 CC). Grounds for termination: term expiry, completion of the agreed use, lender's urgent unforeseen need, destruction of the thing, death of either party if intuitu personae.
Mutuo: fungible object (esp. money), OWNERSHIP transfers to borrower who bears risk from delivery, may be gratuitous OR interest-bearing but interest is owed ONLY if expressly agreed (art. 1755 CC — never presumed), equivalent amount returned (arts. 1753-1757 CC). This is the legal basis of the mortgage loan; LCCI (Law 5/2019) governs residential mortgage loans: FEIN/FIAE standardized pre-contractual info, minimum 10-calendar-day reflection period, free notarial advice for borrower, tied-sale prohibition (with exceptions), the borrower pays the appraisal; the lender pays the gestoría (processing), the notary's fees for the loan deed and the Land Registry fees; copies are paid by whoever requests them (art. 14.1.e LCCI); AJD on the mortgage-loan deed is paid by the lender (art. 29 TRITPAJD, since RDL 17/2018).
Mandate/mandato (art. 1709 CC): agent (mandatario) undertakes to act for the principal (mandante) — the legal basis for an API acting on a client's behalf. Consensual, non-formal (but disposal acts like sale/mortgage need an EXPRESS mandate with sufficient powers), presumed GRATUITOUS by default but presumed REMUNERATED when the agent's profession is rendering that kind of service (i.e., a real estate agent) — favorable presumption for API fee entitlement. Intuitu personae — trust-based, ends on death or insolvency of either party; loss of capacity alone no longer ends it (art. 1732 CC as reformed by Law 8/2021; see termination grounds below).
Mandate scope: general (all the principal's affairs; drawn in general terms it covers only administration, so disposal acts need an express mandate, art. 1713 CC) vs. special (specific matters) (art. 1712 CC); representative (effects fall directly on principal) vs. non-representative (effects fall on the agent first, who must transfer them).
Agent's obligations: perform per instructions (or with reasonable diligence absent instructions), render accounts and hand over everything received (even amounts not technically owed to the principal), liable for non-performance damages (multiple agents' liability is NOT joint/several unless expressly agreed).
Principal's obligations: honor what the agent did within mandate limits (beyond-limit acts only bind principal if ratified), advance/reimburse funds needed for the mandate, pay agreed/customary remuneration, indemnify agent for non-fault-based losses.
Termination grounds (art. 1732 CC): revocation by principal (at will, at any time — can compel return of the power-of-attorney document); renunciation by agent (with notice; must indemnify if it causes harm, unless continuing would cause the agent serious harm); death of either party; support measures set for the agent that affect the act to be performed, and a representative curatorship (curatela representativa) constituted for the principal, except preventive mandates (art. 1732.4º-5º CC as reformed by Law 8/2021 from 3 September 2021 — mere loss of capacity is no longer a ground); insolvency proceedings against either party; expiry of an agreed term.
Practical agent takeaways: a general administration power does NOT authorize selling/mortgaging — needs an express notarial power; API must render full accounts of deposits/arras received on the client's behalf; client's death halts the transaction pending a new power from the heirs; client can revoke the listing at will — the API's remedy for a broken exclusivity clause is contractual damages, not specific performance.
Spanish vocabulary
donación
gift/donation
animus donandi
intent to make a gift
donación inoficiosa
inofficious gift (exceeds freely disposable share)
donación con reversión
gift with a reversion clause
donación modal / sub modo
gift with a charge
comodato / comodante / comodatario
loan for use / lender / borrower
mutuo / mutuante / mutuatario
loan for consumption / lender / borrower
mandato / mandante / mandatario
mandate/agency / principal / agent
rendición de cuentas
rendering of accounts
revocación / renuncia
revocation / renunciation
FEIN / FIAE
standardized pre-contractual mortgage information forms
Key citations
Art. 618 CC — definition of gift; art. 623 CC — perfection on donor's awareness of acceptance.
Art. 633 CC — mandatory public deed for gifts of real property (ad solemnitatem, radical nullity if absent).
Art. 636 CC / inofficious gift — cap at what could be given by will.
Arts. 644, 647, 648 CC — the three exhaustive revocation grounds and their time limits (5/4/1 years).
Art. 1709 CC — definition of mandate; art. 1732 CC — grounds for termination.
Law 5/2019 (LCCI) — real estate credit contract protections for mortgage borrowers.
Tema 16
Power of Attorney, Negotiorum Gestio, Brokerage, and Suretyship
Key concepts
Power of attorney (poder de representación) vs. mandate — key distinction: the mandate is necessarily a CONTRACT (meeting of minds); the power of attorney is initially a UNILATERAL act by the grantor alone, becoming bilateral only when the attorney-in-fact accepts. A mandate does NOT necessarily involve representation (non-representative mandate exists); a power of attorney ALWAYS entails representation.
Critical practical consequence: revoking the underlying mandate does NOT automatically terminate the power of attorney as against good-faith third parties — revocation binds a third party only once that party knows of it — acts of the attorney with third parties unaware of the revocation remain valid (arts. 1734 and 1738 CC); in practice it is done before a NOTARY, notified to the attorney and to known counterparties and, where relevant, recorded in a public registry, so that it can be proved (apparent authority / principle of appearance protects a good-faith third party dealing with an attorney-in-fact whose power was revoked but who wasn't aware).
Power-of-attorney requirements: grantor must have full capacity (cannot delegate more than they hold); sufficiency (a general administration power is NOT enough to sell/mortgage/gift real property — needs an express, specific power); form follows the underlying act (public deed required if the act itself requires one).
Types by scope: general (all the grantor's affairs) vs. special (one or more stated affairs) (art. 1712 CC). Separately, a power in general terms covers only administration; selling, mortgaging, gifting or any other act of strict ownership needs that faculty stated expressly (art. 1713 CC), but once it is stated the properties need not be named (STS Pleno 642/2019, 27 Nov 2019); abusive use of the power can still be set aside.
Preventive power of attorney (added to art. 1732 CC by Law 41/2003; since 3 Sept 2021 in arts. 256-262 CC after the Law 8/2021 support reform; it must be granted in a public deed, which the notary sends to the Civil Registry, art. 260 CC): survives the grantor's subsequent loss of capacity if expressly so stated — avoids the need for guardianship/curatorship proceedings; essential estate-planning tool for elderly/ill clients.
Termination of power of attorney: same grounds as mandate (art. 1732 CC — revocation, renunciation, death of either party, support measures for the attorney affecting the act, or a representative curatorship constituted for the grantor UNLESS the power is preventive (art. 1732.4º-5º CC, Law 8/2021), insolvency proceedings, fulfillment of a special power's specific purpose).
Negotiorum gestio / gestión de negocios ajenos (arts. 1888-1894 CC): a person (manager/gestor) voluntarily takes charge of another's affairs (business owner/dueño) WITHOUT a mandate or legal obligation to do so — quasi-contractual source of obligations, prevents unjust enrichment. Requirements: acting in the owner's interest (not one's own), lawful, no pre-existing power/mandate, voluntary, with the diligence of a reasonable head of household.
Manager's obligation of continuity (art. 1888 CC) — cannot unilaterally abandon management once begun if the owner would be harmed; must continue until concluded or until the owner can take over themselves. Manager is liable even for FORTUITOUS damage if they undertook risky transactions the owner didn't normally do, or subordinated the owner's interest to their own. Owner's duty to reimburse depends on RATIFICATION: if ratified, acts become binding as if there'd been a mandate from the start; if NOT ratified but the owner takes advantage of the management, the owner answers for the obligations contracted in their interest and must repay the manager's necessary and useful expenses and losses; the same applies, even with no benefit at all, when the management was meant to avert imminent and obvious harm (art. 1893 CC).
Brokerage contract (mediación/corretaje) — the legal basis of the API's activity: an UNNAMED/atypical contract (no specific state law governs it generally) — sourced from party autonomy (art. 1255 CC), sector custom, analogous named-contract rules (mandate, services, commercial commission), and general CC contract rules. Characteristics: consensual, bilateral, principal (standalone), commutative and CONDITIONAL (commission owed only if the deal is actually perfected through the broker's efforts), intuitu personae (weaker when broker is a company).
Right to commission arises at PERFECTION of the underlying deal (meeting of minds on thing+price) — does NOT require consummation (delivery, full payment) — STS 21 Oct 2000.
Broker is NOT liable for the deal's successful outcome — if perfected but later fails due to buyer's default, broker STILL keeps the commission (unless an express result-guarantee was agreed) — STS 28 Nov 1956.
Causal link is INDISPENSABLE — no commission if the deal was closed without using the broker's efforts, or via another broker — STS 2 Oct 1999.
"Taking advantage of previous efforts": if the principal withdraws from the brokerage engagement but later closes directly with a buyer the broker introduced, the broker can still claim the FULL commission — Oviedo Provincial Court, 17 Oct 1994.
The broker has NO authority to conclude the main deal absent an express grant — their role is to connect the parties; arras received by the broker does NOT itself perfect the sale — STS 21 Oct 1965 / 3 Mar 1967.
Brokerage termination: perfection of the deal (normal completion — commission accrues); unilateral withdrawal by either party (no indemnity needed unless bad faith); withdrawal + later use of broker's efforts (commission still owed); expiry of an agreed term (e.g., exclusivity period, automatic, no notice needed); supervening impossibility of the object (property destroyed/expropriated — no commission); mutual agreement.
Suretyship/fianza (art. 1822 CC): surety (fiador) pays/performs for a third party (principal debtor) if the latter fails. Characteristics: consensual, gratuitous by default (can be onerous), ACCESSORY (void principal obligation → void suretyship, except debtor-incapacity cases; extinguished principal obligation → extinguished suretyship), SUBSIDIARY (surety only liable if debtor defaults), EXPRESS AND NOT EXTENDABLE — never presumed (art. 1827 CC), interpreted restrictively.
Surety's benefits/protections: benefit of discussion/excusión (art. 1830 CC — creditor must exhaust debtor's assets first); benefit of division (art. 1837 CC — multiple sureties each liable only for their share, unless waived/joint-several); right of subrogation (art. 1839 CC — paying surety steps into creditor's rights, including mortgages/privileges, and can seek reimbursement from the debtor).
Suretyship termination: extinction of the principal obligation (accessory nature); general obligation-extinction causes (art. 1156 CC); creditor granting the DEBTOR an extension WITHOUT the surety's consent releases the surety (art. 1851 CC — protects the surety's original risk expectations); creditor accepting payment in kind (dación en pago) releases the surety even if later evicted (art. 1849 CC); release of one co-surety benefits the others up to that share (art. 1850 CC); impossibility of subrogation due to creditor's act releases the surety (art. 1852 CC).
Real estate practice notes: LAU allows additional guarantees beyond the legal deposit (1 month for housing, 2 for other use), capped at 2 months' rent on a housing lease of up to 5 years (7 if the landlord is a company) and at 1 month on a temporary-housing lease; since 8 Oct 2026 a tenant can never be required to take out rent-default insurance or similar cover (art. 36.5 LAU as amended by RDL 29/2026) — personal suretyship is common, should be expressly recorded, identifying scope (rent/damages/costs); in deferred-price sales, a personal surety is subsidiary UNLESS joint-and-several liability is agreed; in mortgage loans, the surety is liable with ALL present and future assets (art. 1911 CC) and a foreclosure auction shortfall does NOT release the surety: the creditor can pursue them for the rest (art. 579.1 LEC), but only if they were notified of the original foreclosure claim, and for no more than that claim, with no default interest added for the foreclosure period (art. 685.5 LEC); where the habitual home was foreclosed, paying 65% of the shortfall within 5 years (80% within 10) releases the executed party (art. 579.2 LEC).
Spanish vocabulary
apoderamiento
granting of a power of attorney
poderdante / apoderado
grantor / attorney-in-fact
poder preventivo
preventive power of attorney
gestión de negocios ajenos
management of another's affairs (negotiorum gestio)
gestor / dueño del negocio
manager / business owner
ratificación
ratification
mediación / corretaje
brokerage/agency
corredor / comitente
broker / principal (client)
nexo causal
causal link
fianza
suretyship
fiador
surety
beneficio de excusión
benefit of discussion
beneficio de división
benefit of division
subrogación del fiador
surety's subrogation
dación en pago
payment in kind (in lieu of debt)
Key citations
Art. 1732 CC — grounds for termination of mandate/power of attorney.
Art. 1888 CC — manager's obligation of continuity in negotiorum gestio.
STS 21 October 2000 — broker's commission accrues at perfection, not consummation, of the deal.
STS 2 October 1999 — indispensable causal link for commission accrual.
Art. 1822 CC — definition of suretyship; art. 1827 CC — express, non-extendable nature.
Art. 1830 CC / 1839 CC — benefit of discussion / right of subrogation.
Tema 17
Real Property Rights (Derechos Reales)
Key concepts
Real right (derecho real) vs. right of credit/personal right: real right = direct, immediate power over a thing, erga omnes (against everyone); personal right = relationship between two people (creditor/debtor), only inter partes, needs the debtor's conduct. Real rights (over real estate) can be acquired via usucapión; personal rights cannot.
Characteristics of real rights: falls directly on a determined thing; absolute/erga omnes; patrimonial content only; immediacy (no intermediary needed); numerus apertus (open list — besides the real rights named in the CC and special statutes, parties MAY create atypical real rights over real estate, arts. 2 LH and 7 RH, provided the new right keeps the structural features of a real right — direct power over the thing, effect erga omnes — and its content is fully regulated, while a merely personal pact cannot be registered as one); registry publicity needed for third-party effect; escritura pública is the form the law requires for creating/transferring real rights over real estate (art. 1280 CC) and is needed to register them (art. 3 LH) — but a private contract still binds and either party can compel the other to sign the deed (arts. 1278-1279 CC), and only a donation of real estate (art. 633 CC) and a mortgage (art. 1875 CC) are invalid without it; acquirable via usucapión.
Art. 348 CC: property (dominion) = the right to enjoy and dispose of a thing, with no limits other than those set by law — the FULLEST real right; all others are "limited real rights" (rights over another's property, granting only some powers of dominion).
Classification: full real right (property/dominion) > provisional real right (possession) > real rights of ENJOYMENT (usufruct, use/habitation, easement, censos/emphyteusis, building-above/below rights) > rights of PREFERENTIAL ACQUISITION (option, tanteo, retracto) > real rights of SECURITY (mortgage, pledge, antichresis).
Usufruct: broadest enjoyment right — use + gather fruits, must preserve form/substance; always TEMPORARY (life, fixed term, or conditional; max 30 years if usufructuary is a legal person); extinguished by death (if life usufruct), term expiry, waiver, consolidation (merger with bare ownership), prescription, or destruction of the thing.
Use and habitation: more limited than usufruct, STRICTLY PERSONAL — cannot be assigned or leased (unlike usufruct, which can generally be transferred/leased).
Easement (servidumbre): burden on a servient estate for benefit of a dominant estate (or person); predial easements are inseparable from their estates. Types: of way (paso), of light and view (luces y vistas), of aqueduct, party wall/medianería, altius non tollendi (height restriction).
Rights of preferential acquisition compared: purchase option (unilateral declaration of will exercised within an agreed period — erga omnes if registered); tanteo (exercised BEFORE a sale, on notice of intended terms); retracto (exercised AFTER a sale, stepping into the buyer's shoes on the same terms — "tanteo exercised after the fact"). Concrete deadlines: LAU tanteo 30 days from reliable notice; LAU retracto 30 days from notice of the sale; LAR tanteo 60 business days from the notice and, if no notice was given, LAR retracto 60 business days from learning of the transfer (art. 22.2 LAR; only for a professional-farmer tenant); co-owners' retracto (art. 1522 CC) 9 days from registration, or from learning of the sale if it is not registered (art. 1524 CC).
Real rights of security: mortgage (arts. 1874-1880 CC, with the rules common to pledge and mortgage in arts. 1857-1862 CC, + Mortgage Law — over real estate, stays in debtor's possession, requires public deed + registration for validity, judicial/extrajudicial enforcement on default); pledge (movable property, requires DELIVERY of possession to the pledgee — no delivery, no valid pledge); antichresis (creditor holds the property and applies its fruits first to interest, then to capital, art. 1881 CC; if unpaid, the creditor does NOT become owner — any pact to the contrary is void — but may sue for payment or for a court sale of the property, art. 1884 CC; essentially obsolete, displaced by the mortgage).
Powers of dominion (Latin terms — common MCQ material): ius possidendi (possession), ius utendi (use), ius fruendi (enjoyment/fruits), ius abutendi/disponendi (disposal — sell, encumber, transform, destroy — what distinguishes an owner from a mere enjoyment-right holder), ius excludendi (exclusion of others).
Modes of acquiring dominion (art. 609 CC): law, donation, succession (testate/intestate), certain contracts + delivery, or usucapión. Classification axes: original (no prior right — occupation, usucapión, accession) vs. derivative (transferred from a prior holder — "nemo dat quod non habet," acquirer gets no more than transferor had); universal (whole estate — inheritance) vs. particular (specific assets — sale, donation); inter vivos vs. mortis causa; onerous vs. gratuitous.
Title-and-mode system (título y modo) — Spanish law's defining feature: a contract (title) alone does NOT transfer ownership; DELIVERY (mode/tradición) is also required. Delivery forms: actual (physical handover), symbolic (handing over a representative symbol, e.g. warehouse keys), instrumental (art. 1462.2 CC — the escritura pública itself equals delivery, unless the deed states otherwise), traditio longa manu (pointing out the thing at a distance), constitutum possessorium (transferor stays in possession under a different capacity, e.g. seller becomes tenant).
Usucapión (acquisitive prescription): ordinary (possession as owner, public/peaceful/uninterrupted + just title + good faith — 10 years between persons present / 20 years absent) vs. extraordinary (no good faith/title needed — 30 years of open, peaceful possession as owner suffices). Real risk on abandoned rural estates and unfenced plots — registry ownership is NOT a bar to usucapión against the registered owner, but against a good-faith, for-value buyer protected by art. 34 LH it prevails only if the buyer knew or had reasonable means to know of the adverse possession before buying, or tolerated it for the whole year after buying (art. 36 LH) — inspect the property, not only the Registry, before buying.
Modes of LOSING dominion: voluntary (alienation, abandonment) vs. involuntary (destruction of the thing, revocation — e.g., resolutory condition for non-payment, forced expropriation — requires prior justiprecio payment, original acquisition by a third party via usucapión).
Content of ownership — three broad powers: free use (ius utendi/fruendi/abutendi, limited by planning/environmental rules); free disposal (power to alienate — limited by third parties' preferential-acquisition rights and prohibitions on disposal; power to encumber — cannot exceed what the encumbering party holds; power to transform/destroy); exclusion (vindicatory action, negatory action, right to enclose land).
Limitations on property: social function (art. 33.2 CE); urban planning; abuse of rights (art. 7.2 CC — "acts of emulation" that only harm a neighbor with no benefit to the actor); neighboring-property relations (arts. 589-593 CC — distances and protective works for dangerous or noxious installations near another's wall, tree-planting distances of 2 m / 50 cm, overhanging branches and roots); party-wall regime (arts. 571-579 CC); forced expropriation; alienation prohibitions (e.g., VPO subsidized housing resale bans); statutory easements (arts. 549-570 CC); historical heritage protection (Law 16/1985, art. 38 — selling a BIC triggers the Administration's tanteo/retracto; in Andalusia Law 14/2007, art. 17, extends the Junta's tanteo/retracto to EVERY property in the Catálogo General del Patrimonio Histórico Andaluz, not only BICs — notify the Consejería and the town hall 2 months before the sale, otherwise retracto within 6 months of the Junta learning of it; from 7 April 2027 Andalusian Law 4/2026, art. 76, narrows it to BICs and catalogued buildings in a Conjunto Histórico).
Actions protecting property — key distinctions: vindicatory action (acción reivindicatoria — recover possession from a non-titled holder; claimant must prove ownership + defendant's possession + individualized identification; NOT time-barred unless usucapión has already run) vs. declaratory action (claimant already possesses, just wants title formally recognized — not time-barred) vs. negatory action (deny a claimed third-party encumbrance exists — 30-year period) vs. Publician action (protects a possessor mid-usucapión against a weaker-right possessor — case-law recognized, not in the CC) vs. boundary and enclosure (deslinde, art. 384 CC — the boundary action between neighbouring owners never prescribes, art. 1965 CC; the right to fence, art. 388 CC, is a power of ownership for which the Code sets no time limit, subject to existing easements) vs. third-party ownership claim/tercería de dominio (stop enforcement against an asset that isn't actually the debtor's — must be brought before the auction).
Registry protection principles: registry legitimation (art. 38 LH — registered holder presumed true owner, burden of proof shifts to challenger); registry public faith (fe pública registral, art. 34 LH — a good-faith, for-consideration acquirer from someone appearing in the Registry as empowered to transfer KEEPS their acquisition even if the transferor wasn't the true owner, once registered); registry priority (art. 17 LH — first to register prevails in rank, even over an earlier but unregistered acquirer, if acting in good faith).
Spanish vocabulary
derecho real
real right
derecho de crédito
right of credit (personal right)
erga omnes
against everyone (absolute effect)
numerus clausus
closed list of real rights (not the Spanish rule: Spain follows numerus apertus, arts. 2 LH and 7 RH)
nuda propiedad
bare ownership
usufructo / usufructuario
usufruct / usufructuary
servidumbre
easement
predio dominante / sirviente
dominant / servient estate
tanteo / retracto
right of first refusal / right of redemption
título y modo
title and mode (transfer system)
tradición
delivery
usucapión
acquisitive prescription
acción reivindicatoria
vindicatory action
acción negatoria
negatory action
tercería de dominio
third-party ownership claim
fe pública registral
registry public faith
Key citations
Art. 348 CC — definition of property/dominion as the fullest real right.
Art. 609 CC — modes of acquiring ownership.
Art. 1462.2 CC — instrumental delivery (escritura pública equals delivery).
Art. 34, 17, 38 LH — registry public faith, priority, and legitimation principles.
Tema 18
Co-ownership (Comunidad de Bienes)
Key concepts
Co-ownership (art. 392 CC): ownership of a thing/right belongs pro indiviso to several people — each holds an ideal/abstract SHARE (cuota) over the whole, not a physical part. Legal nature: a real right, transitory by design (any co-owner can force division — imprescriptible action), NO independent legal personality (acts done on behalf of all co-owners jointly, unlike a company).
Origin types: conventional/voluntary (deliberate joint acquisition) vs. incidental/forced (arises from a legal fact — inheritance, mixing of materials, marital regime commingling) — inheritance co-ownership (comunidad hereditaria) is the most common real-estate scenario.
Structure types: Roman-type (by shares — CC's default/presumed model — each co-owner freely disposes of their OWN share without others' consent, any co-owner can demand division) vs. Germanic-type (joint hand/gesamte Hand — no individual disposable shares, only joint action — used for communal mountain land, water communities, and partly for gananciales marital property).
Co-ownership vs. civil partnership (sociedad civil) — key distinctions: co-ownership can arise WITHOUT a prior agreement of wills (forced by law); a partnership always requires a contract. Co-ownership contributions are limited to assets (not labor/money alone, strictly); partnership contributions can be assets, money, OR labor/industry. Co-ownership has no profit purpose necessarily; partnership is profit-driven. Division: co-ownership divisible at will anytime (imprescriptible); a partner cannot unilaterally dissolve except for legal/agreed causes.
Shares presumed EQUAL absent proof otherwise (art. 393 CC, rebuttable/iuris tantum) — rebutted by the constitutive title, contribution value, or other admissible proof. Use/enjoyment, fruits, and expense contributions are all proportional to the share; a co-owner CAN escape the duty to contribute to upkeep costs, but only by renouncing their share in the ownership (art. 395 CC).
Free disposal of an individual share (art. 399 CC): a co-owner may sell, mortgage, donate, or substitute another in enjoyment of their OWN share WITHOUT the others' consent. Mortgaging a share: the security falls on the abstract share only — on foreclosure, the share is auctioned (not a physical part), and the auction buyer becomes a new co-owner. Leasing a share requires agreement if it entails exclusive use of the thing (distinct from just transferring the abstract share).
Majority/unanimity rules — the central exam distinction: ordinary use (no prior agreement needed, per one's own share, art. 394 CC) < ordinary administration acts (MAJORITY OF SHARES, not of persons — e.g., leasing the common thing for up to six years, ordinary repairs, insurance, appointing an administrator — art. 398 CC; a longer lease counts as an act of disposal and needs every co-owner; if no majority reached or the agreement seriously harms co-ownership interests, a judge decides) < acts of alteration/innovation AND acts of disposal of the WHOLE thing (UNANIMITY of all co-owners — sale of the entire property, mortgage on the whole, material division, change of use — without unanimity, the act is VOID).
Co-owners' right of redemption/retracto de comuneros (art. 1522 CC): when a co-owner sells their share to an outside THIRD PARTY (not another co-owner, not a gift — only applies to ONEROUS sales/exchanges-in-disguise), the other co-owners can step into the buyer's shoes at the same price within 9 days from Land Registry registration (or from awareness if unregistered). If several co-owners want to redeem, they do so pro rata to their shares — cannot be exercised by just one to exclude others. This right takes PRIORITY over the neighboring landowner's retracto de colindantes when both apply. Does NOT apply: sale to another co-owner, gift of the share (only onerous transfers trigger it).
Termination causes: division (actio communi dividundo — most frequent, imprescriptible); consolidation (one co-owner buys out all others, becomes sole owner via public deed); loss/destruction of the asset; joint disposal (all co-owners sell together); compulsory expropriation (justiprecio distributed by share); joint gratuitous transfer; termination by agreement (extinción de condominio).
Extinción de condominio — key tax-planning fact: when the asset is indivisible (or would lose much value if divided) and one co-owner keeps it and compensates the others in cash, this is taxed under STAMP DUTY (AJD, notarial-documents modality) on the share newly acquired, rather than Transfer Tax (ITP) — since it's treated as specifying a pre-existing right, not a new transfer (art. 7.2.B TRLITP, art. 1062 CC). An avoidable excess paid in cash pays ITP (7% in Andalusia). AJD is significantly cheaper than ITP (concrete regional rates: Castilla y León AJD 1.5%, Andalusia AJD 1.2%). IRPF: the co-owner paid out in cash HAS a capital gain if the property rose in value since they acquired their share: the cash received minus what the share cost, even when the cash only matches the share's value (Supreme Court, 10 Oct 2022, ROJ STS 3585/2022); no gain only if the value has not risen. No IIVTNU (municipal plusvalía) is due when the asset is indivisible: the excess paid in cash under art. 1062 CC is not treated as a transfer (DGT binding ruling V0123-24); an avoidable excess paid in cash is a transfer and does pay IIVTNU.
Pact of indivision (art. 400 CC): co-owners can agree to stay undivided for up to 10 YEARS, extendable by unanimous agreement — binds co-owners and heirs, but does NOT bind a creditor who has attached a co-owner's share (creditor can still force division).
Cases where material division isn't done (award or public sale instead): real indivisibility (nature of the thing), material division would greatly devalue it, division would make the thing useless for its purpose, or division cost would be disproportionate.
Ways of carrying out division (art. 402 CC): by the co-owners' own agreement (public deed, fastest/cheapest), by arbitrators/amicable compounders (arbitral award = res judicata effect), or judicially (actio communi dividundo — judge appoints an expert valuer, decides award-with-compensation or public auction).
Liability: co-owners bear UNLIMITED, joint-and-several personal liability for co-ownership debts toward third parties (contrast with a civil partnership's joint/mancomunada, non-solidary default liability).
Spanish vocabulary
comunidad de bienes
co-ownership
pro indiviso
undivided (co-ownership state)
comunero
co-owner
cuota
participation share
copropiedad / condominio
co-ownership/condominium
comunidad hereditaria
inheritance co-ownership
sociedad civil
civil partnership
actio communi dividundo
action for division
pacto de indivisión
pact of indivision
retracto de comuneros
co-owners' right of redemption
extinción de condominio
termination of co-ownership
AJD (Actos Jurídicos Documentados)
Stamp Duty
ITP (Impuesto sobre Transmisiones Patrimoniales)
Transfer Tax
Key citations
Art. 392 CC — definition of co-ownership (pro indiviso ownership).
Art. 393 CC — presumption of equal shares; proportional benefits/burdens.
Art. 398 CC — majority of shares for administration acts; art. 397 CC — unanimity for alteration.
Art. 399 CC — free disposal of an individual share without others' consent.
Art. 1522 CC — co-owners' right of redemption (9-day deadline).
Art. 400 CC — imprescriptible action for division; pact of indivision (max. 10 years).
Tema 19
Possession (La Posesión)
Key concepts
Possession (arts. 430-466 CC): the de facto power over a thing — a FACT, not a right, but independently protected by law. Two elements: corpus (material holding/control — no need for constant physical contact, e.g. holding keys suffices) and animus (intent — animus domini = intent to hold as owner, vs. animus detinendi = intent to merely keep/enjoy while acknowledging another's title).
Possession is the law's "provisional real right" — protects the possessor against disturbance regardless of whether they actually have the underlying right; this protection is summary/provisional and does NOT prejudge who has the better right.
Classification axes: natural (mere corpus, no animus domini — e.g., a tenant) vs. civil possession (corpus + animus domini — leads to usucapión); as owner (generates legitimacy presumption, can lead to usucapión) vs. as holder/tenedor (acknowledges another's title — tenant, usufructuary, depositary — CANNOT acquire by usucapión); own name vs. another's name (representative, possession servant); immediate (direct) vs. mediate (through another — a landlord has mediate possession, the tenant has immediate possession); just (lawful acquisition) vs. unjust (violence, clandestinity, mere tolerance — merely tolerated acts create NO possession at all); good faith (unaware of a title defect) vs. bad faith (aware of the defect).
Civilísima possession (art. 440 CC) — special automatic mode: an heir who ACCEPTS an inheritance is deemed to possess the estate's assets from the moment of the DECEDENT'S DEATH, without interruption and without any material act of taking possession. Only applies to heirs (universal successors), NOT legatees (who must request delivery of the legacy). Effect on usucapión: heir's possession tacks onto the decedent's without interruption. Procedural tool: verbal proceeding under art. 250.1.3 LEC to be formally placed in possession of unpossessed estate assets.
Possessory presumptions (all rebuttable/iuris tantum): legitimacy (art. 448 CC — possessor-as-owner presumed to hold just title, doesn't have to prove it — challenger bears the burden); continuity (art. 459 CC — proving possession at two points in time presumes possession throughout the interval); good faith (art. 434 CC — ALWAYS presumed, whoever alleges bad faith must prove it); preservation of possessory capacity (art. 436 CC — presumed to continue in the SAME capacity as acquired, e.g. a tenant can't later claim to possess as owner without proving a change); registered title (art. 38 LH — registered owner presumed to possess even without material possession); possessory extension (art. 449 CC — possessing real property implies possessing the movables/fittings inside it).
Effects by good/bad faith on FRUITS: good-faith possessor keeps fruits received while possession isn't legally interrupted (art. 451 CC), must return only fruits pending/received after bad faith begins; bad-faith possessor must hand over ALL fruits received AND fruits the legitimate possessor could have received (fructus percepti + percipiendi) from the START of possession (art. 455 CC). Either type gets reimbursement for fruit-production expenses if defeated.
Effects on deterioration/loss: good-faith possessor NOT liable unless intentional; bad-faith possessor liable for deterioration/loss in every case, and even for force majeure where he maliciously delayed returning the thing to the legitimate possessor (art. 457 CC).
Effects on expenses/improvements (settlement of the possessory estate on defeat): necessary/upkeep expenses — good faith gets full reimbursement + RIGHT OF RETENTION until paid; bad faith gets reimbursement but NO retention right. Useful expenses (value-adding improvements) — good faith is reimbursed, with the same right of retention, and the party who defeated the possessor chooses between paying the cost OR the resulting value increase (art. 453 CC); bad faith gets NOTHING (art. 455 CC). Purely luxury/ornamental expenses — never reimbursed; good faith may remove ornaments if no damage (unless the successor prefers to pay what was spent, art. 454 CC); bad faith may also remove them if no damage, unless the legitimate possessor keeps them by paying their value when he takes possession (art. 455 CC).
Usucapión link (real property): possession as owner in GOOD FAITH and with JUST TITLE shortens the period — 10 years between present/20 years between absent, i.e. residing abroad (arts. 1957-1958 CC) — vs. 30 years extraordinary (no good faith/title needed, art. 1959 CC).
Modes of acquiring possession (art. 438 CC): apprehension/occupation (original — res nullius, abandoned goods); tradition (derivative — voluntary delivery, bilateral tradens/accipiens, the typical sale mode); acts and legal formalities (instrumental tradition via public deed); possession of rights via repeated exercise (e.g., habitually using a right of way).
Mortis causa acquisition contrast: heir gets civilísima possession automatically at death (art. 440 CC); LEGATEE does NOT — must request delivery from the heir/executor, possession begins only at actual delivery.
Preservation rules: art. 439 CC — a third party acting without a mandate (negotiorum gestor) can acquire possession on another's behalf, but it has no effect until ratified; art. 441 CC — possession may never be taken by force against an objecting possessor; art. 444 CC — tolerated, clandestine, or violent acts do NOT create protectable possession; art. 446 CC — every possessor has the right to be respected/restored if disturbed (foundation of possessory actions); art. 463 CC — a mere holder's acts (e.g., unauthorized subletting) don't bind the true owner absent express authorization or ratification.
Concurrence of possessions (art. 445 CC) — order of preference when two people dispute possession: (1) current possessor at time of dispute, (2) if both current, the LONGER-STANDING one, (3) if equal/undetermined dates, whoever holds documentary TITLE, (4) if still equal, JUDICIAL DEPOSIT pending resolution.
Loss of possession (art. 460 CC): voluntary (unequivocal abandonment — never presumed; transfer for onerous or gratuitous title with delivery) vs. involuntary (destruction/total loss of the thing; the thing falling outside commerce — e.g. expropriation into public domain; possession by another for MORE THAN A YEAR, even against the former possessor's will — this ties directly to the 1-year limitation period for possessory actions, art. 1968.1 CC and art. 439.1 LEC).
Possessory protection actions (post-1881 LEC reform, now under verbal proceeding, art. 250.1 LEC): retention/recovery of possession (art. 250.1.4 LEC — 1-year limitation from the disturbance/dispossession, summary, doesn't prejudge ownership); acquiring the inheritance (art. 250.1.3 LEC — places heir in possession of unpossessed estate assets, no specific time limit); suspension of new construction (art. 250.1.5 LEC — urgent, must be brought WHILE works are ongoing — lapses once works complete; unlike art. 250.1.4, since 3 April 2025 it needs a prior negotiation attempt (MASC, art. 5.2 LO 1/2025), but interim measures before the claim need none, art. 5.3); Publician action (recovers possession against a possessor with an inferior right — no summary procedure, ordinary declaratory proceeding, no specific time limit, case-law recognized).
Self-help NOT generally permitted — the only exception is legitimate self-defense against a CURRENT unlawful attack; once dispossession is complete, recourse must be through the courts (possessory action within 1 year).
Possessory (summary, fact-based, 1-year limit, provisional effect) vs. petitory actions (declaratory, right-based — ownership/real right, longer/ordinary procedure, imprescriptible or 30-year limits, res judicata definitive effect) — key structural distinction for exam questions asking "which type of action."
Agent practice notes: buyer of an illegally occupied property acquires ownership but NOT possession — seller should clear occupants before sale; handover of keys = tradition = possession transfer to buyer, normally timed at deed signing; a tenant who overstays after lease expiry becomes a bad-faith possessor, recoverable only via eviction proceedings (art. 250.1.1 LEC; never self-help); since 3 April 2025 the claim is admitted only after a prior negotiation attempt (MASC, art. 5 LO 1/2025) and only if it states whether the property is the occupant's habitual home and whether the landlord is a large holder (art. 439.6 LEC); a tenant's alteration works done without the landlord's written consent give no compensation right (the landlord can demand restoration or keep them for free, art. 23 LAU); other possessors still recover necessary expenses, and good-faith ones useful expenses too (art. 453 CC).
Spanish vocabulary
posesión
possession
corpus / animus
material element / intentional element
animus domini
intent to hold as owner
posesión civilísima
civilísima (constructive/automatic) possession
poseedor de buena/mala fe
possessor in good/bad faith
frutos percibidos
fruits received
gastos necesarios / útiles / de lujo
necessary / useful / luxury expenses
derecho de retención
right of retention
interdicto posesorio
possessory injunction (historical term)
acción publiciana
Publician action
despojo
dispossession
tradición
delivery
tenedor
mere holder (non-owner possessor)
Key citations
Art. 430 CC — natural vs. civil possession; art. 432 CC — as owner vs. as holder.
Art. 440 CC — civilísima possession of the heir from the decedent's death.
Art. 434, 448, 459 CC — presumptions of good faith, legitimacy, and continuity.
Art. 451/455 CC — fruits: good-faith possessor keeps them / bad-faith possessor pays them all over.
Art. 460 CC — causes of loss of possession; art. 1968.1 CC — 1-year prescription of possessory actions.
Art. 445 CC — order of preference when possession is disputed.
Tema 20
Limited Real Rights — Usufruct, Surface Right, Air Rights, Easements
Key concepts
Usufruct (art. 467 CC, arts. 467-522): a real right to enjoy another's property with the obligation to preserve its FORM and SUBSTANCE, unless the constituting title or law authorizes otherwise. Limited real right (ius in re aliena), erga omnes, temporary by nature (max. 30 years if usufructuary is a legal person — never perpetual), transferable/mortgageable EXCEPT most legal usufructs, registrable in the Land Registry for third-party effect.
Tax valuation of usufruct — memorize this formula: life usufruct value = 89% minus the usufructuary's age, never above 70% (usufructuary under 20) nor below 10% (age 79+) of the asset's value; temporary usufruct = 2% per year, max. 70%; bare ownership = the complement up to 100% (based on ISD Law 29/1987 art. 26). "Usufruct with power of disposal" (usufructuario con facultad de disponer) can be treated by tax authorities as a FULL transmission for ISD purposes if the usufructuary can freely alienate.
Constitution of usufruct (art. 468 CC): by law (only the surviving spouse's forced-heirship usufruct remains under common CC post-reforms — falls on the tercio de mejora if concurring with descendants, half the estate if only ascendants, two-thirds if neither), by will of private parties (inter vivos or mortis causa), or by usucapión (same 10/20-year ordinary / 30-year extraordinary periods as ownership).
Extinction of usufruct (art. 513 CC): death of the usufructuary (main cause — personal, doesn't pass to heirs unless expressly agreed); renunciation (needs public deed for registered real property); expiry of term/condition; total loss of the thing (partial loss doesn't extinguish it for the remainder); expropriation (indemnity split between bare owner and usufructuary); consolidation (merger of usufruct + bare ownership in same person); extinctive prescription (non-use 6 years movables / 30 years real property); resolution of the constituent's own right.
Extinction triggers ISD "consolidation of title" taxation on the bare owner — 6-month self-assessment deadline from the usufructuary's death (art. 67.1.a RISD; art. 68.2 Andalusian Law 5/2021); if it ends otherwise, e.g. by term or condition, 2 months in Andalusia for a usufruct created by gift (art. 68.1 Law 5/2021), 30 business days for one created by inheritance (art. 67.1.b RISD); the FIRST bare owner pays on the value the usufruct was given when it was constituted, less any unused kinship reduction, at the same average effective rate fixed then (art. 26.c Law 29/1987, art. 51.2 RISD) — not on any later rise in the property's value; if the bare ownership changed hands in between, the new bare owner is assessed at consolidation on the percentage of the total value not yet taxed, at the scale of the title that split the ownership (art. 51.3 RISD).
Usufructuary's rights: possession/use/enjoyment (all fruits, but NOT treasure found (art. 471 CC); the usufructuary DOES enjoy increases by accession, e.g. alluvial accretions (art. 479 CC)); transmission/lease of the right (can sell, mortgage, or lease their usufruct — except legal, non-transferable usufructs); improvements (can make useful/ornamental improvements without altering form/substance, no compensation at extinction but may remove if no harm caused); possessory and reivindicatory actions against disturbers.
Usufructuary's obligations: inventory before taking possession (with notice to bare owner); post security/bond (waivable); diligent care (liable for own-fault deterioration); ORDINARY repairs/upkeep costs; pay taxes/contributions levied ON THE FRUITS (not on the capital); return the thing at extinction in received condition (normal wear excepted).
Bare owner's position: retains disposal power (can sell/mortgage/encumber the bare ownership WITHOUT the usufructuary's consent, subject to the usufruct continuing); can inspect and sue for serious deterioration; automatically recovers FULL ownership at extinction (no additional act needed — consolidation); must fund EXTRAORDINARY repairs (but can charge the usufructuary interest on that investment for the usufruct's duration); pays taxes levied directly on the CAPITAL (art. 505 CC) — but IBI is not one of them: while a usufruct exists, the USUFRUCTUARY is the IBI taxpayer (arts. 61 and 63 TRLRHL).
Surface right (derecho de superficie, TRLSRU RDLeg 7/2015 arts. 53-54 — NOT regulated in the national CC beyond a passing mention in art. 1611): grants the superficiary the power to build on/above/below another's land (or acquire temporary ownership of an existing building), while the landowner keeps ownership of the land itself. Only the LANDOWNER can grant it (not a usufructuary or emphyteuta). Requires a NOTARIZED PUBLIC DEED (no private document accepted) + Land Registry registration — and registration is CONSTITUTIVE: without it the right is not validly created (art. 53.2 TRLSRU). Maximum duration: 99 years, whether the landowner is public or private (art. 53.2 TRLSRU); art. 16.1 RH was annulled by the Supreme Court (31 January 2001).
A surface right is excluded as mortgage-market security only if less than 20 years of it remain after the loan's final repayment date (RD 716/2009, art. 11.1.c) — insufficiently stable/durable a value, though it can still be independently VALUED under Order ECO/805/2003. On extinction (term expiry, failure to build within the constituting title's term, mutual agreement, merger, breach), what was built reverts to the landowner WITHOUT compensation, unless otherwise agreed.
Air rights (derecho de vuelo) vs. right to build additional floors (sobreelevación): vuelo is the general right to build on another's land/building (airspace); sobreelevación is the SPECIFIC right to add floors on top of an EXISTING building — necessarily alters the horizontal-property participation quotas. Transferring air rights within a community requires the LPH majority thresholds (art. 17 LPH). Taxed under ITP (private transferor) or VAT (business/professional transferor).
Easement/servidumbre (art. 530 CC): encumbrance on a servient estate for the benefit of a dominant estate belonging to a DIFFERENT owner. Characteristics: indivisible (affects the whole servient estate even if only part is used, art. 535); inseparable (can't be transferred apart from the estate, art. 534); predial (falls on an estate — personal easements are the exception); must be possible; requires "otherness"/alterity — cannot exist between estates of the same owner (nemine res sua servit — usufruct/use rights are NOT easements).
Easement classification (art. 532/536 CC): legal (imposed by law) vs. voluntary; predial (dominant party = another estate) vs. personal (benefits a person/community, e.g. balcony easement); positive (obliges servient owner to allow/do something — right of way, aqueduct) vs. negative (prohibits an otherwise-lawful act — altius non tollendi); continuous (usable without human intervention — aqueduct, light/view) vs. discontinuous (needs human acts — right of way, grazing); apparent (visible external signs) vs. non-apparent (no visible sign — grazing, not-to-build easements).
Usucapión of easements — critical restriction: ONLY continuous AND apparent easements can be acquired by usucapión (20 years public/peaceful/uninterrupted possession, art. 537 CC). Discontinuous or non-apparent easements CANNOT be acquired this way — e.g., a right-of-way easement (discontinuous) is never usucapión-acquirable, only by title or "destination by the head of household" (art. 541 CC — an apparent sign between two same-owner estates becomes a title of easement when one estate transfers, unless removed/excluded beforehand).
Legal easements catalog: natural water drainage (lower estates must receive natural water flow from higher ones, arts. 552+); dam/aqueduct easement (compensated passage of water, arts. 557+); right of way (arts. 564+) — the most frequent in practice: a landlocked estate gets a compensated right of way (free, unless agreed otherwise, if it became landlocked on its sale, exchange or partition by the owner of the land around it, art. 567), established at the point LEAST detrimental to the servient estate (and shortest to the public road if compatible); once passage is no longer needed (estate joined to one on the road, or a new road opens), the servient owner MAY ask for its extinction, refunding the compensation (art. 568). Party-wall easement (arts. 571+); light-and-view easement (arts. 580+ — direct views need 2m from boundary, oblique views 60cm); building drainage (rainwater must fall on own ground, art. 586); planting-distance (arts. 591-592 — 2m for tall trees, 50cm for shrubs).
Extinction of easements (art. 546 CC): merger/consolidation of dominant+servient ownership (doesn't automatically revive if later separated); non-use for 20 years (counted from cessation of use for discontinuous, from a contrary act for continuous); impossibility due to estate conditions (can revive if conditions permit, unless already prescribed); term/condition fulfillment; renunciation (express or tacit) by the dominant estate owner; agreed redemption (usually for compensation).
Registry protection nuance for easements (case law, not statute: art. 13 Mortgage Law itself only says charges must appear in the registration to affect third parties): APPARENT easements remain enforceable against a good-faith purchaser even if NOT registered (visible = presumed known); NON-APPARENT easements only bind a third-party purchaser if actually REGISTERED — this is the flip side of the general registry public faith rule (art. 34 LH), and a key due-diligence point: physical inspection matters as much as the nota simple.
Spanish vocabulary
usufructo / nudo propietario
usufruct / bare owner
usufructuario con facultad de disponer
usufructuary with power to dispose
consolidación
consolidation (merger of usufruct + bare ownership)
derecho de superficie / superficiario
surface right / superficiary (holder)
derecho de vuelo
air right
sobreelevación
right to build additional floors
servidumbre predial / personal
predial / personal easement
predio dominante / sirviente
dominant / servient estate
altius non tollendi
not-to-build-higher easement
servidumbre de paso
right-of-way easement
destino del padre de familia
destination by the head of household
finca enclavada
landlocked estate
Key citations
Art. 467 CC — definition of usufruct (enjoyment + preserve form/substance).
Art. 513 CC — causes of extinction of usufruct.
Art. 53.2 TRLSRU (RDLeg 7/2015) — surface right constitution; 99-year max duration for any landowner, public or private; registration constitutive.
Art. 530 CC — definition of easement (servient/dominant estate).
Art. 537 CC — only continuous AND apparent easements acquirable by 20-year usucapión.
Art. 13 Mortgage Law — charges and limited real rights affect third parties only if they appear in the registration; the exception for apparent easements (binding even unregistered) comes from case law, not from art. 13.
Tema 21
Real Security Rights — Pledge, Antichresis, Mortgage
Key concepts
Real security rights (pledge, mortgage, antichresis) share common characteristics: value-realization power on default; the forfeiture clause (pacto comisorio — automatic creditor ownership on non-payment) is PROHIBITED; erga omnes; priority in collection; the debtor still bears UNLIMITED personal liability with all present/future assets alongside the security (art. 1911 CC) — the real security does NOT replace this, except with limited-liability mortgages (art. 140 LH); limited real rights (ius in re aliena); accessory to the principal obligation; indivisible (whole thing secures whole debt, partial payment doesn't partially release it unless agreed).
Comparison table — object/possession-transfer/registration: mortgage (real estate, NO possession transfer, YES constitutive registration); ordinary pledge (movable, YES possession transfers to creditor/third party, NO registration — publicity via possession transfer); non-possessory pledge (specific movables like machinery/collections, NO possession transfer, YES Register of Movable Assets); chattel mortgage (vehicles/aircraft/ships, NO possession transfer, YES Register of Movable Assets); antichresis (fruits of real estate, YES possession transfers, registration NOT constitutive but needed for third-party opposability).
Pledge (prenda, arts. 1857-1873 CC): object = possessable/transferable movables (or transferable rights); TRANSFER OF POSSESSION is the essential constitutive requirement (art. 1863 — without it, it's not an ordinary pledge, only the special non-possessory-pledge regime applies); no public deed needed for validity between parties, but a document with certain date needed for third-party effect (art. 1865). Pledgee's rights: retention until full payment (reinforced right of retention, art. 1866); realization via public auction on default with notice (art. 1872); expense reimbursement. Pledgee's obligations: custody with due diligence; CANNOT use the pledged thing or take its fruits (else debtor can request sequestration); must return the thing once paid.
Antichresis (arts. 1881-1886 CC): object = the FRUITS of real estate (not the property itself) — creditor retains the property and collects fruits, applying them first to interest then principal. Requires a PUBLIC DEED for validity + Land Registry registration for third-party opposability; needs a maximum agreed TERM (no indefinite real encumbrances). Forfeiture clause (pacto comisorio) is prohibited here too — non-payment does NOT let the creditor keep the property; they must seek payment/sale via the Civil Procedure Act. In insolvency, antichresis grants special-privilege status over the property's fruits (art. 270.2 TRLC).
Real estate mortgage (art. 1876 CC): subjects the mortgaged asset DIRECTLY and IMMEDIATELY to the obligation, whoever possesses it — grants the creditor ius persequendi (right of pursuit, chase the asset regardless of possessor) and ius praelationis (priority of collection). Characteristics: indivisible, accessory, value-realization, PECUNIARY (secures a money obligation), real-estate-related, WITHOUT possession transfer (owner keeps possessing — key contrast with pledge), specificity/determination required (determined asset + determined amount — a general mortgage over all assets is PROHIBITED), CONSTITUTIVE registration (art. 1875 CC/145 LH — without registration it does NOT exist as a real right), the mortgage claim itself is assignable and the mortgage right itself mortgageable.
LCCI (Law 5/2019) — residential mortgage consumer protections: FEIN (binding offer, 10 days pre-signing) + FiAE (standardized warnings) + amortization schedule; free notarial advice at least 1 day before signing (recorded in a notarial act); lender bears agency/registration/notary/AJD costs, borrower bears only appraisal + requested copies; early termination only after unpaid instalments of at least 3% of the capital granted or 12 monthly instalments (first half of the loan) or 7% or 15 instalments (second half), AND a prior demand giving the borrower at least one month to pay and warning of acceleration (art. 24 LCCI, also applicable to older loans under DT 1ª.4); caps on opening/early-repayment/conversion fees.
Mortgage classifications: voluntary (agreed/owner-created, public deed + registration) vs. legal (statutorily admitted to protect minors/disabled/State/municipalities); ordinary/of-trade (secures a determined, existing, enforceable debt — registry public faith covers both the security AND the claim's existence/amount) vs. security/máximo mortgage (secures a doubtful/future/undetermined-amount obligation, e.g., a credit account — registry public faith covers ONLY the security, the claim's existence must be proven separately, art. 153 bis LH); capital (single payment) vs. income (periodic payments); mortgage with limited liability (art. 140 LH — creditor waives pursuit of the debtor's other assets, exceptional and strictly construed).
Mortgageable assets (arts. 106-107 LH): real estate, transferable real rights over real estate, USUFRUCT right (extinguishes with the usufruct if it ends for reasons unrelated to the usufructuary's will), bare ownership (mortgage extends to full ownership once usufruct ends), already-mortgaged assets, one's own mortgage right, registered surface rights, administrative concessions, pacto-de-retro assets, litigious assets (if creditor aware). NON-mortgageable (art. 108 LH/1874 CC): easements (unless with the dominant estate — EXCEPTION: water easements ARE independently mortgageable); legal usufructs (EXCEPTION: surviving spouse's IS mortgageable); use and habitation (strictly personal, non-transferable).
Mortgage-market exclusions (RD 716/2009) — not eligible even though otherwise valid mortgages: usufruct (temporary/personal), administrative concessions (subject to Administration's will), surface rights with less than 20 years left after the loan's final maturity, and grazing/water/wood-gathering rights (insufficiently stable, art. 11.1.c), buildings outside planning regulation or with provisional works (demolition risk).
Parties: mortgage creditor (claim + mortgage inseparable — assignable together, art. 149 LH); debtor-mortgagor (real + personal liability, art. 1911); non-debtor mortgagor (mortgages own asset for a THIRD PARTY's debt — never becomes a debtor, liability capped at the asset, has recourse against the actual debtor if executed); third-party possessor (subsequent acquirer of the mortgaged property — takes it "cum onere hipotecario," liable only with the encumbered property, not personally, unless, once required, they neither pay nor abandon it: then they also answer with their own assets for interest accrued since the demand and the costs their delay causes (art. 126 LH) — can pay to avoid enforcement and subrogate into creditor's rights, art. 1210.3 CC; can remove separable improvements they added, art. 113 LH; has the right to cure/enervación by paying the matured claim before enforcement concludes).
Objective scope of the mortgage (arts. 109-115 LH): automatically includes natural accessions, post-mortgage improvements, and post-mortgage indemnities (e.g. fire insurance); interest secured against third parties: absent agreement, only the last 2 years plus the matured part of the current year, and by agreement never more than 5 years (art. 114 LH); does NOT include (absent agreement): permanently placed movables, fruits (owner keeps collecting them — unlike antichresis), or rents already matured/unpaid when the debt falls due (art. 111 LH).
Distribution of mortgage liability: multiple properties securing one claim must specify each property's answerable amount in the registration (art. 119 LH) — absent distribution, creditor can pursue any/all properties for the whole debt; dividing a mortgaged property doesn't redistribute the claim without agreement (art. 123 LH); land added to a mortgaged property is not automatically covered by the mortgage, unless added by natural accession (art. 110.1 LH); while the liability is not distributed, partial payment releases no part of the mortgaged property (art. 125 LH).
Mortgage rank (registry priority — prior in tempore, potior in iure): enforcement of a HIGHER-ranking mortgage extinguishes/"purges" lower-ranking ones from the registry (the lower creditor keeps their personal claim, just loses the real security).
Twofold creditor action: real action (hipotecaria, art. 129 LH — against the mortgaged asset regardless of possessor, 20-year prescription, art. 128 LH) + personal action (art. 1911 CC — against the debtor's whole estate, 5-year prescription: since Law 42/2015 (from 7 October 2015) personal actions without a special term prescribe 5 years from when performance can be demanded, art. 1964.2 CC — there is no special 15-year term for the mortgage-related personal action; for actions that arose before 7 October 2015, DT 5ª Law 42/2015 applies art. 1939 CC, so they prescribed at the latest on 7 October 2020 unless interrupted). Both actions are compatible, can run simultaneously/successively.
Post-2013 debtor protections (CJEU Aziz case, C-415/11, 14 March 2013 — declared Spain's mortgage-enforcement system contrary to EU law for not letting judges suspend on unfair terms) → Law 1/2013, LCCI (2019), Law 12/2023 (Right to Housing) reforms: judicial power to suspend enforcement for unfair terms, expanded debtor opposition grounds, new early-termination conditions, vulnerable-debtor protections (the eviction, not the auction, of especially vulnerable households from their habitual residence is suspended until 15 May 2028, art. 1 Law 1/2013 as extended by RDL 1/2024; Law 12/2023's vulnerability check and prior conciliation before the sale stage, art. 655 bis LEC, were annulled by STC 26/2025, and RDL 29/2026 removed the vulnerability document from the enforcement claim, art. 685.2 LEC, from 8 October 2026).
Enforcement procedures: judicial mortgage enforcement (arts. 681-698 LEC — summary/privileged, executory title = registered mortgage deed, limited opposition grounds (art. 695 LEC): extinction of the guarantee or debt, error in the amount when the debt is an account balance, a prior registered charge (movables only), unfair terms); ordinary enforcement (personal action against the whole estate, art. 517+ LEC — used when mortgage enforcement doesn't fully satisfy the claim); extrajudicial notarial sale (art. 129 LH — requires express agreement in the deed, notary auctions, suspended if unfair terms alleged); insolvency procedure (mortgage creditor = special-privilege creditor, art. 270 TRLC, enforcement can be suspended during the common phase).
Auction rules (LEC as amended by Organic Law 1/2025, in force from 3 April 2025): in a mortgage enforcement, the auction value (tipo de subasta) set in the mortgage deed cannot be below 75% of the appraisal (art. 682.2.1º LEC). To bid, a bidder deposits 20% of the auction value, at least €1,000 (art. 669.1). A bid of 70% or more of the auction value is approved outright (art. 670.1). Below 70%, the debtor has 10 days to present a third party offering at least 60%, or enough to pay the creditor in full (art. 670.3). If that does not happen, the best bid is approved if it reaches 50% of the auction value, or 40% if it pays the creditor in full; below that, the court clerk (letrado de la Administración de Justicia) decides on the circumstances. For the debtor's habitual residence, the sale cannot be approved below 70%, or below 60% when the bid covers everything owed to the creditor. If nobody bids, the creditor can no longer ask to be awarded the property (art. 647.2): the attachment is lifted at the debtor's request, and the debtor, alone or on the creditor's proposal, may designate a buyer at 50% of the auction value or more, or at 40% or more if that pays the creditor in full (art. 671). Auction buyer takes the property free of charges SUBSEQUENT to the enforced mortgage (purge) but NOT of PRIOR charges (art. 670.5) — agent must check all registered charges ranking ahead of the enforced mortgage.
Extinction of mortgage (a distinct act from Registry CANCELLATION): extinction of the secured obligation (payment, set-off, waiver, merger, novation — mortgage is materially extinct even if still registered); total loss of the asset (insurance indemnity substitutes via real subrogation; partial loss leaves the mortgage on the remainder); creditor waiver (cancellation deed); termination of mortgagor's right; 20-year prescription of the mortgage action (art. 128 LH) without exercise/acknowledgment; enforcement of a preferential mortgage (purges lower-ranking ones); merger (creditor becomes owner); nullity of the mortgage or the secured obligation.
Registry cancellation methods: cancellation deed by the creditor (standard, "discharge and cancellation"); final court judgment substituting the creditor's will if they refuse; cancellation by LAPSE (art. 82 LH — at the request of the holder of any registered right on the property, NOT ex officio: once the prescription period of the mortgage action, 20 years (art. 1964.1 CC), has run from the date the secured debt had to be fully paid according to the Registry, plus one more year in which the Registry shows no renewal, interruption or enforcement); cancellation via enforcement of a preferential mortgage.
Tax notes on mortgage cancellation: cancellation itself is NOT a taxable event for ITP/AJD or IRPF. Dación en pago (payment in kind — delivering the property to the bank to cancel the debt) is treated as a transfer BUT the resulting capital gain is IRPF-EXEMPT (art. 33.4.d LIRPF) for a debtor/guarantor's habitual residence, IF the debtor has no other sufficient assets — same conditions extend the exemption to IIVTNU (municipal capital gains). Mortgage novation (term/rate changes) is subject to the FIXED AJD fee but EXEMPT from the VARIABLE AJD fee under Law 2/1994 art. 9.
Spanish vocabulary
derecho real de garantía
real security right
prenda / pignorante / pignoraticio
pledge / pledgor / pledgee
anticresis
antichresis
hipoteca
mortgage
pacto comisorio
forfeiture clause (prohibited)
ius distrahendi
right to realize the asset's value
ius praelationis
right of priority (in collection)
ius persequendi
right of pursuit
tercer poseedor
third-party possessor
dación en pago
payment in kind
purga de cargas
purge of (subsequent) charges
cancelación registral
registry cancellation
hipoteca de máximo
maximum/security mortgage
Key citations
Art. 1857-1873 CC — pledge regime; art. 1863 CC — transfer of possession as constitutive requirement.
Art. 1881-1886 CC — antichresis regime.
Art. 1876 CC — mortgage's direct/immediate subjection of the asset (ius persequendi/praelationis).
Art. 1875 CC / 145 LH — constitutive registration of the mortgage.
Art. 128-129 LH — real action (20-year prescription); art. 1911 CC — personal action/unlimited liability.
Arts. 647.2, 669.1, 670, 671 and 682.2.1º LEC (as amended by Organic Law 1/2025, from 3 April 2025) — auction value at least 75% of appraisal, 20% deposit, approval thresholds (70%, 60%, 50%, 40%), habitual-residence floors, no creditor award without bids.
Tema 22
The Land Registry (Registro de la Propiedad)
Key concepts
Land Registry (art. 1 LH): public institution recording acts/contracts on ownership and other real rights over real property; run by Land Registrars (notary-equivalent public officials), under the Ministry of Justice. Registrable acts (art. 2 LH): titles transferring/declaring ownership or real rights; titles constituting/modifying/extinguishing usufruct, use, habitation, emphyteusis, mortgage, censos, easements, surface rights, vuelo, etc.; awards of real property/rights; judicial decisions declaring absence or death or affecting a person's free disposal of property, and those under art. 755.2 LEC such as support measures for persons with disability (since Law 8/2021); leasing contracts over real property; State/corporate acquisition titles.
Organization: folio real system — the PROPERTY (not the person) is the registry's organizing axis; each property has its own independent registry file recording its whole legal history. Key books: Book of Registrations (definitive entries), Daily Book/Libro Diario (chronological log of submitted documents — determines PRIORITY), Book of Incapacitated Persons, indexes. Law 13/2015 introduced mandatory georeferencing for first registration, area excess, and subdivision — enables Registry-Cadastre coordination.
Documents accessing the Registry: PUBLIC documents are the ordinary route (notarial deeds/instruments, judicial writs/orders, administrative certifications); PRIVATE documents access only in exceptional legally-listed cases (e.g. a request distributing mortgage liability among properties, signed before the Registrar or with certified signatures, art. 216 RH; the heirs' request to annotate their hereditary right, art. 46 LH) — general rule is private documents do NOT access the Registry. First registration goes through a notarial expediente de dominio (art. 203 LH) or two public titles at least a year apart (art. 205 LH, since Law 13/2015).
Publicity instruments: nota simple informativa (informative only, NOT authoritative — the API's standard verification tool) vs. registry certification (the ONLY authoritative means, signed by the Registrar, full public faith — used in court/mortgage subrogation/official certification needs).
Ten registry principles (core exam material):
Registry entries (asientos) — five types: entry of presentation (asiento de presentación, provisional, 60 working days, extendable — determines priority); registration/inscripción (definitive/principal, indefinite duration until cancelled); preventive annotation (anotación preventiva — protects not-yet-final rights or notable legal situations like attachments/claims/prohibitions-to-transfer/mechanic's liens/inheritance rights — lapses after 4 YEARS unless the law sets a shorter term, renewable in further 4-year blocks if the extension order is filed before expiry, art. 86 LH; a mechanic's-lien (refaccionario) annotation lapses 60 days after the works end, art. 92 LH); marginal note (nota marginal — secondary facts on principal entries, e.g. tax-liability notes, variable duration); cancellation (extinguishes/nullifies a prior entry, total or partial).
Effects of registration: legitimation (art. 38 LH); UNENFORCEABILITY of unregistered rights against third parties (art. 32 LH — valid between the parties, but doesn't bind outsiders); public faith (art. 34 LH); presumption of accuracy (art. 38 LH); judicial safeguard (art. 1 LH — Registrar cannot cancel entries on their own initiative, only via judicial decision or titleholder's deed); judicial protection via the summary verbal proceeding for registered real actions (art. 41 LH).
Constitutive vs. declarative registration — critical distinction: CONSTITUTIVE = the right doesn't exist as a real right without registration (mortgage art. 1875 CC/145 LH, chattel mortgages, non-possessory pledges, certain surface rights). DECLARATIVE = the right already exists between the parties via title+mode (e.g., a sale — delivery/deed already transfers ownership inter partes), but registration is needed for THIRD-PARTY enforceability and art. 34 LH public-faith protection.
Practical due-diligence protocol for the agent: (1) nota simple before starting any transaction (ownership, description, encumbrances, limitations, urban-planning status); (2) verify ACTUAL possession separately — a simple note doesn't reflect real occupancy, and an occupant not matching the registered owner may signal usucapión risk or an unregistered lease the buyer can't invoke against art. 34 LH; (3) request a full registry CERTIFICATION (not just a nota simple) for complex transactions (inheritances, developers, large estates); (4) register the deed urgently (same/next day) to preserve priority against a fraudulent double-sale risk; (5) check marginal notes of TAX liability (ITP/AJD) — these encumber the property against the Tax Authorities for 5 years even if the current buyer isn't the original taxpayer.
Spanish vocabulary
Registro de la Propiedad
Land Registry
folio real
real-property-based registry file system
Libro Diario
Daily Book (chronological submission log)
nota simple (informativa)
informative simple note
certificación registral
registry certification
fe pública registral
registry public faith
tracto sucesivo
successive chain of title
inmatriculación
first registration
expediente de dominio
title-resumption/first-registration proceeding
calificación registral
registry legal review
asiento de presentación
entry of presentation
inscripción
registration
anotación preventiva
preventive annotation
nota marginal
marginal note
tercero hipotecario
mortgage-law third party
Key citations
Art. 1-2 LH — purpose and scope of the Land Registry; registrable acts.
Art. 34 LH — registry public faith (the four cumulative requirements).
Art. 38 LH — presumption of legitimation/accuracy.
Art. 20 LH — tracto sucesivo (successive chain of title).
Art. 35 LH — registration as just title for acquisitive prescription purposes.
Tema 23
Mortgage/Registry Law — The Registral Property, First Registration, and Cadastre Coordination
Key concepts
The finca registral (registral property) is the Spanish registry system's basic unit — organized via the folio real: each property gets its own independent registry folio recording its entire legal history. Types: rustic, urban, special properties under horizontal property (each flat/unit gets its OWN folio despite being physically part of one building — Law 49/1960 LPH + art. 8 LH), private real estate complexes ("tumbada" horizontal property or complex regime, arts. 24-25 LPH), administrative concessions (independently registrable/mortgageable, art. 107.6 LH), and surface rights (independent folio when the superficiary builds and owns separately from the land).
Description requirements (art. 9 LH, post-Law 13/2015): nature (urban/rustic + crop type), location, boundaries (4 cardinal points or naming adjoining features), surface area, CADASTRAL REFERENCE (mandatory since Law 13/1996 on every first registration and entry), and GEOREFERENCED GRAPHICAL REPRESENTATION (mandatory since Law 13/2015 for first registration, area surplus, segregation, division — ETRS89 coordinates; uses the CCDG — descriptive/graphical cadastral certification — if it matches the cadastral parcel, or a validated alternative representation if not).
Folio real sections: heading/description, ownership entries, charges/encumbrances, marginal notes, preventive annotations, cancellations. Entries are unalterable once made — can only be rectified/cancelled via a LATER entry (arts. 211-220 LH for error rectification).
Physical modifications (don't change legal identity/registry number): declaration of new construction/obra nueva (art. 28 TRLSRU, art. 202 LH — completed construction needs public deed + building licence + technician's certificate that the finished work matches the project + occupation authorisation (in Andalusia a declaración responsable, art. 138.1.d LISTA) + 10-YEAR/decenal insurance for mainly-residential buildings under LOE (art. 20 LOE) — not required of an individual self-builder of a single family home for own use, but if that home is sold within 10 years the seller must take out the insurance for the remaining years unless the buyer expressly waives it and the seller proves having used the home (LOE DA 2ª) + georeferenced representation; new construction "in progress" needs a permit + matching technical certificate, allows mortgaging the plot+building-in-progress; "antigüedad"/age route when the planning-enforcement limitation period has expired, proven by technical/cadastral certificate).
Area surplus/exceso de cabida (real area > registered) vs. shortfall/defecto de cabida (real < registered) — Law 13/2015 completely reformed this: an area difference of up to 10% can be registered without a proceeding when the descriptive and graphic cadastral certificate (CCDG) shows the parcel fully matching the registered plot, and up to 5% even without it (art. 201.3 LH) — but only if the registrar, in a reasoned decision, has no grounded doubts (e.g. the area was measured exactly before, repeated rectifications, or the plot came from a segregation, division or aggregation); after registering, the registrar notifies the registered owners of the adjoining plots; surpluses >10% require the full art. 199 or art. 201 LH procedure with adjoining-owner notice. DGSJFP doctrine: area surplus is ONLY for correcting a measurement error on an already-registered property — NEVER a disguised way to register additional/unregistered land.
Legal/tabular modifications (change registry identity, need municipal license where required): merger/agrupación (2+ registered properties → one new folio; possible even across different Registries, for non-adjoining plots that form one farm or organic unit, and for plots of different owners if the deed sets each one's undivided share in the result — arts. 44-45 RH); addition/agregación (absorbing a segregated portion into an EXISTING folio without opening a new one — the increase generally capped at 1/5 of the main property unless adjoining, art. 48 RH); segregation/segregación (splitting off part of a property into a NEW independent folio — needs a segregation permit); division/división (splitting a whole property into 2+ new independent folios — needs a subdivision permit). Minimum farming units (Law 19/1995) prohibit segregating rustic properties below a minimum agricultural surface — infringement voids the segregation.
First registration (inmatriculación) — Law 13/2015 abolished the old judicial title-record proceeding and the notoriety-deed procedure, replacing them with: (1) notarial title record proceeding (art. 203 LH — ordinary route, before a Notary, notifies adjoining owners/Cadastre/municipality, edict published in the BOE in every case (the notary may also post it on the town-hall board), 1-MONTH objection period, objection → archived, applicant goes to court); (2) first registration by DOUBLE PUBLIC TITLE (art. 205 LH — the acquirer's title + the transferor's PRIOR public title, with at least 1 YEAR gap between the two titles' dates — if less than a year, must use art. 203 instead; Registrar notifies adjoining owners, cannot be used for portions already registered); (3) first registration by ADMINISTRATIVE CERTIFICATION (art. 206 LH — reserved for Public Administrations and the public-law entities linked to them — the Catholic Church was removed by Law 13/2015 — with their written title where they have one); (4) registration from a final court judgment (art. 204 LH); (5) usucapión proved within the art. 203 notarial proceeding.
Chain-of-title resumption (interrupted tracto sucesivo): notarial proceeding under art. 208 LH (voluntary, before a Notary, notice to affected registered holders + adjoining owners + public notice — replaces the old judicial proceeding) for a genuinely broken chain, i.e. unregistered intermediate transfers between the registered owner and the current owner; it does NOT apply when the current owner acquired directly from the registered owner or the owner's heirs — then the acquisition documents (e.g. inheritance deed + sale) are simply presented (art. 208 LH, rule 1); OR a court judgment in a declaratory action ordering the rectification (art. 40.a LH) if judicially proved; OR, in the cases art. 20 LH lists, an abbreviated chain without registering every link.
Charges/encumbrances catalog and registry effect: mortgage (constitutive registration, priority in sale proceeds); judicial/administrative attachment (preventive annotation, art. 42.2 LH, 4 years renewable, binds subsequent acquirers); easement (registered on the SERVIENT estate's folio — apparent easements bind third parties even unregistered — case law; art. 13 LH sets the general rule that charges must be registered to affect third parties); usufruct/use/habitation (reduce bare owner's powers while in force); explicit resolutory condition (CRE, arts. 1504 CC/11 LH) — seller reserves the right to rescind a sale for non-payment of deferred price, registered as a charge on the buyer's folio, functionally similar to a mortgage but without the mortgage regime; prohibition on disposal; tax charges (ITP/AJD) — property remains liable for 5 YEARS via a marginal note (art. 5 TRLITPAJD, art. 122.4 RITPAJD), and a later ACQUIRER answers SUBSIDIARILY, with the property itself, if the tax is not paid (art. 79 LGT); plusvalía (IIVTNU) gets no such note — in a sale it is the seller's tax, but if the seller is a non-resident individual the BUYER is the substitute taxpayer and must pay it (art. 106.2 TRLRHL), and the Registry will not register the sale until the plusvalía return or communication is filed (art. 254.5 LH); the seller's unpaid IBI likewise charges the property, in subsidiary liability (art. 64 TRLRHL).
Priority/ranking mechanics beyond the basic principle: rank determined by the Daily Book filing entry's date/time; incompatible rights → registry CLOSES to the second; compatible-but-competing rights (e.g. 1st vs 2nd mortgage) → higher rank paid first, foreclosure of the higher-ranked one PURGES lower-ranked charges. Postponement of ranking (posposición) — a higher-rank holder voluntarily yields position to a later right; to postpone a mortgage to a FUTURE one, art. 241 RH requires the postponing creditor's express consent, the future mortgage's maximum liability and maximum duration fixed in advance, and its registration within the agreed term, or the postponement lapses; reservation of ranking for a future mortgage; exchange of ranking between two mortgages by mutual consent (affects only those two, not intermediate ones).
Rectification procedure choice — art. 199 vs. art. 201 LH: art. 199 (REGISTRAL procedure — owner requests registration of the cadastral/alternative graphical representation directly with the Registrar; adjoining-owner notice; 20 BUSINESS DAYS objection window; quicker/cheaper, no notary) vs. art. 201 (NOTARIAL proceeding — greater legal certainty via notarial involvement, objection → archived, must go to court). Choice depends on case circumstances/owner preference.
Registry-Cadastre coordination (Law 13/2015 core pillar): a property is "coordinated" when its registered georeferenced representation matches its cadastral parcel — recorded via marginal note, published on the Registry Geoportal, creates a rebuttable presumption (art. 10.5 LH) that the cadastral graphical representation IS the registered property's representation, enforceable against third parties. Mandatory-coordination triggers: first registration, area surplus >10%, segregation/division/merger/addition, new-construction declarations with graphical representation. CCDG (free, online via Sede Catastro) used when matching; alternative graphical representation (RGA, professional-prepared, GML format) when not matching.
Practical agent takeaways: compare the nota simple against the CCDG to detect registry/cadastre discrepancies (surface mismatches, boundary conflicts, undeclared/illegal construction visible on cadastral maps but absent from the registry); cadastral reference is MANDATORY in every real-estate deed since Law 13/1996 — but a missing cadastral reference does NOT stop the notary authorising the deed or the Registry registering it — the omission is only noted (art. 44 TRLCI); rustic properties are especially prone to large registered-vs-real area discrepancies, worth flagging in the listing agreement (nota de encargo) as something to regularize before sale.
Spanish vocabulary
finca registral
registral property
folio real
real-folio (property-based registry file)
obra nueva
declaration of new construction
exceso / defecto de cabida
area surplus / shortfall
agrupación / agregación
merger / addition (of properties)
segregación / división
segregation / division (of properties)
inmatriculación
first registration
acta de notoriedad
notoriety record (abolished for first registration)
CCDG
descriptive and graphical cadastral certification
representación gráfica alternativa (RGA)
alternative graphical representation
condición resolutoria explícita (CRE)
explicit resolutory condition
posposición de rango
postponement of ranking
coordinación Registro-Catastro
Land Registry-Cadastre coordination
Geoportal del Registro
Land Registry Geoportal
Key citations
Art. 9 LH (as amended by Law 13/2015) — property description requirements, cadastral reference, georeferencing.
Art. 203 LH — notarial title record proceeding for first registration (1-month objection period).
Art. 205 LH — first registration by double public title (minimum 1-year gap between titles).
Art. 201.3 LH — area differences up to 10% with a fully matching CCDG (up to 5% without it) registrable without a proceeding, unless the registrar has grounded doubts; adjoining owners notified afterwards.
Art. 199 vs. art. 201 LH — registral vs. notarial rectification procedures.
Art. 208 LH — notarial proceeding to resume a genuinely interrupted chain of title; rule 1: acquiring directly from the registered owner or the owner's heirs is not an interruption.
Art. 10.5 LH — presumption of coincidence for Registry-Cadastre coordinated properties.
Módulo 2
Técnico (Construcción y Finanzas)
Tema 20
Commercial and Financial Calculation
Key concepts
Financial calculation = time value of money: capital available today > capital available tomorrow, because today's capital can be invested.
Interest rate is priced on: amount lent, term (longer term = higher rate, normal yield curve), borrower solvency, collateral type (real guarantee/mortgage vs personal guarantee), ECB/Euribor reference rates, expected inflation.
Simple interest: proportional to time, used short-term (≤1 year). Compound interest: interest generates further interest ("interest on interest"), used medium/long-term (mortgages, deposits, funds).
Fixed vs variable vs mixed interest; TIN (nominal rate, no fees/frequency) vs TAE/APR (real annual cost, includes settlement frequency + mandatory fees/insurance) — always compare TAE, not TIN, across offers.
Legal interest rate of money is set annually by the Spanish Budget Act; late payment of a money debt (art. 1108 CC) = the agreed interest, or the legal interest if none was agreed; from a first-instance judgment ordering payment, legal interest + 2 points (art. 576 LEC); residential mortgage loans to individuals signed from 16 June 2019, or older ones novated or subrogated since then: default interest = ordinary (remuneratory) rate + 3 points, only on the overdue principal and never compounded, save the art. 579.2.a LEC case (art. 25 and DT 1ª.2 LCCI 5/2019).
Amortization systems: French (constant payment, most common in mortgages), German (constant principal installment, decreasing total payment), American/bullet (interest-only, principal at maturity).
Pledging securities (loan-to-value 40–70%) lets an investor get liquidity without selling assets and without triggering a capital gain/loss for IRPF.
An empréstito (bond issue) is legally a single loan divided into negotiable bonds; bondholders are creditors, not shareholders, with payment priority over shareholders in liquidation.
Present value of a property = capitalization of its net income: perpetual annuity Vo = R/i, or fixed-term Vo = R×[1-(1+i)⁻ⁿ]/i — higher discount rate i means lower valuation.
Key formulas
Simple interest: I = Co · i · n; Final capital: Cn = Co · (1 + i·n)
Compound final capital: Cn = Co · (1 + i)ⁿ; Compound present value: Co = Cn·(1+i)⁻ⁿ
APR (no fees): TAE = (1 + i/k)^k − 1 (i = nominal annual rate, k = settlements/year)
French system annuity: a = Co·i / [1−(1+i)⁻ⁿ]
Present value of ordinary annuity: Vo = a·[1−(1+i)⁻ⁿ]/i; Perpetual annuity: Vo = a/i
Spanish vocabulary
cálculo mercantil
commercial calculation
capitalización
capitalization (interest accrual)
tipo de interés legal del dinero
legal interest rate of money
TAE (Tasa Anual Equivalente)
APR / Annual Equivalent Rate
TIN (Tipo de Interés Nominal)
nominal interest rate
interés de demora
late-payment/default interest
garantía real
real guarantee / collateral (asset-secured)
aval
personal guarantee / surety
empréstito
large-scale bond issue
obligación
bond/debenture
sindicato de obligacionistas
bondholders' syndicate
pignoración de valores
pledging of securities
amortización
amortization (loan repayment or asset depreciation)
cuadro de amortización
amortization schedule
usufructo (del préstamo)
usufruct (present value of interest installments)
nuda propiedad (del préstamo)
bare ownership (present value of principal installments)
Key citations
Art. 1108 Código Civil — late payment of money: the agreed interest, or the legal interest if none agreed. Art. 576 LEC — from a judgment ordering payment: legal interest + 2 points (procedural interest).
Ley 5/2019 (LCCI) — mandatory APR disclosure; mortgage default interest = ordinary rate + 3 points, only on overdue principal, no compounding save art. 579.2.a LEC (art. 25; loans from 16 June 2019, or older ones novated or subrogated since, DT 1ª.2); early-acceleration thresholds + one-month demand (art. 24)
Circular 5/2012 Banco de España (amended several times, most recently by Circular 3/2022) — APR calculation methodology
Ley 3/2004 — late payment in commercial transactions, rate = ECB rate + 8 points
--
Tema 21
Loans and Amortization Systems
Key concepts
Loan elements: lender (prestamista), borrower (prestatario), principal/Co, term, installment (interest + principal portions), present value of loan = usufructo (PV of interest) + nuda propiedad (PV of principal).
Loan classification: by collateral (mortgage / personal-unsecured / pledge / personal guarantee) and by repayment system (bullet, French-constant installment, German-constant principal, American-interest only, increasing installments in arithmetic/geometric progression).
LCCI 5/2019 borrower protections: mandatory FEIN (binding offer) + FiAE + draft contract (+ instalment scenarios for variable-rate loans) ≥10 calendar days before signing (art. 14.1); free notarial advice, at the latest on the day before signing (art. 15.3 and 15.8); bank pays notary/registration/gestoría/AJD (borrower pays only the appraisal and any deed copies he asks for; art. 14.1.e); single opening fee (no study fee if loan denied); early acceleration requires unpaid instalments of at least 3% of the capital granted or 12 monthly instalments (first half of the term), or 7% or 15 instalments (second half), AND a prior demand giving at least one month to pay and warning of acceleration (art. 24; also for older loans, DT 1ª.4); default interest = ordinary rate + 3 points, only on overdue principal, no compounding save art. 579.2.a LEC (art. 25).
The longer the amortization term → lower monthly installment but MORE total interest; the interest rate has a bigger cost impact than the term.
French system: installment constant, interest portion decreases and principal portion increases over time (principal installments form geometric progression with ratio (1+i)). German system: principal installment constant, total installment decreases, total interest cost is LOWER than French. American system: interest-only, principal at maturity, often paired with a sinking fund.
Grace period (only interest paid, no principal amortized) lowers initial installment but raises total interest and post-grace installment — recommended only for documented temporary hardship or developer loans during construction.
Early repayment fee caps under LCCI 5/2019: fixed-rate ≤2% (first 10 yrs) / ≤1.5% (from yr 11); variable-rate 0.25% (first 3 yrs) or 0.15% (first 5 yrs); the contract may provide one of the two options, never both (art. 23.5) then 0%; fee only chargeable if the lender suffers a real financial loss.
Borrower can choose, on early repayment, to reduce the term (max interest savings) or reduce the installment (immediate monthly relief).
Key formulas
Effective/equivalent annual rate: i_effective = (1 + i_k)^k − 1 (i_k = rate per period, k = periods/year)
Monthly rate from annual TIN (simple/proportional): i_monthly = TIN / 12
LCCI art. 11 — the lender must assess the borrower's solvency in depth (income, savings, commitments, retirement income) and may not base it mainly on the property's value; the article sets no maximum financing percentage
LCCI art. 17 — linked insurance cannot be bank-exclusive if client provides equivalent cover
Fundamental equation: Assets = Liabilities + Equity (Net Worth). Assets = property/rights owned; liabilities = debts to third parties; equity = residual value belonging to owners.
Double-entry method (3 rules): every transaction has a debtor and creditor; every fact hits ≥2 accounts (Debit + Credit); Debit total must always equal Credit total.
Normal balances: Assets & Expenses (group 6) → debit balance (increase = Debit). Liabilities, Net Worth & Income (group 7) → credit balance (increase = Credit).
Mandatory accounting books (Art. 25–30 Commercial Code): Journal (Libro Diario) and Inventory & Annual Accounts Book for all business owners; Minutes Book and Shareholders' Book for commercial companies. Ledger (Libro Mayor) and auxiliary books (VAT registers, cash book) are voluntary commercially but often mandatory for tax purposes. Books/records must be kept 6 years from the last entry (Art. 30 CCom), and longer where tax law requires it: the Tax Agency can check tax losses and deductions still being carried forward for 10 years (Art. 66 bis LGT, Art. 26.5 LIS).
Chart of accounts groups 1–5 = balance sheet (1 financing, 2 non-current assets, 3 inventory, 4 trade debtors/creditors, 5 financial accounts); groups 6–7 = P&L (6 expenses, 7 income); groups 8–9 = charged directly to equity (bypass P&L).
Real estate developers: apartments under construction/for sale = INVENTORY (group 3), NOT fixed assets; property held for rental income = investment property (group 2, accounts 220–221).
Accounting principles: going concern, accrual (devengo — recognize when earned/incurred, not when cash moves), consistency, prudence, no offsetting, materiality.
Annual accounts: balance sheet, P&L, statement of changes in equity (ECPN), cash flow statement (EFE, only mandatory for larger companies), notes (memoria). Abbreviated model available if 2 of 3 thresholds met for 2 years: assets ≤€4M, turnover ≤€8M, employees ≤50.
Depreciation: systematic recognition of non-current asset wear; LAND is never depreciated; buildings are depreciated (excluding land value). Methods: straight-line (most common), sum of digits, fixed % on net book value (declining balance), units of production. For corporate tax, buildings may not use the fixed-% or sum-of-digits methods (Art. 12.1 LIS); the official table allows up to 2%/year for housing and commercial buildings, 3% for industrial ones.
Key formulas
Net book value: VNC = Acquisition cost − Accumulated depreciation − Accumulated impairment
Straight-line annual depreciation: (Cost − Residual value) / Useful life years
Money, the Financial System, Markets and Inflation
Key concepts
Money's three functions: medium of exchange, unit of account, store of value; liquidity = ease of converting an asset into anything else.
Financial system channels savings to investment; the bank's profit is the intermediation margin (spread between what it pays savers and charges borrowers).
Central bank (ECB) functions: note/coin issuance monopoly, monetary policy control, lender of last resort, banking supervisor (SSM), reserve custodian, payments-system stability.
Money multiplier / fractional reserve banking: an initial deposit is repeatedly re-lent, so total deposits created = deposit / reserve requirement (multiplier = 1/reserve ratio).
Three ECB monetary policy tools: interest rates (policy rate up → less credit → inflation falls), reserve requirement (up → less lending → money supply falls), open market operations (buying securities = QE/injects money; selling = withdraws money).
Market types by competition structure: perfect competition, monopoly (supply-side), monopsony (demand-side), oligopoly, monopolistic competition (real estate agencies fall here — differentiated "product," limited pricing power).
Law of supply: price ↑ → quantity supplied ↑ (upward curve). Law of demand: price ↑ → quantity demanded ↓ (downward curve), with exceptions: Giffen goods, Veblen/luxury goods, speculative-expectation goods, complementary goods.
Elasticity of demand: inelastic (E<1, necessity, e.g. primary housing) vs elastic (E>1, sensitive to price, e.g. offices/retail) vs unitary (E=1).
Inflation = widespread, sustained rise in general price level. Measured by CPI (INE monthly, representative basket), Core CPI (excludes volatile fresh food/energy — best "underlying" gauge), HICP (EU-harmonized, ECB's 2% target reference), GDP deflator.
Four types of inflation: demand-pull (too much money chasing scarce goods), cost-push/supply-side (rising production costs passed to price), imported (import prices rise, e.g. oil), structural (chronic economy-wide rigidities e.g. housing land scarcity). Stagflation = high inflation + stagnation/unemployment, worst combination for policy.
Wage-price spiral: prices rise → wage demands rise → costs rise → prices rise again — self-reinforcing, hard to stop once anchored expectations break.
Real estate & inflation: property acts as an inflation hedge (price tends to track inflation); fixed-rate mortgage debtors benefit (repay with cheaper money) while fixed-income savers/rentiers lose; rising ECB rates to fight inflation curb housing demand.
Spanish vocabulary
trueque
barter
curso legal
legal tender
coeficiente de caja (reserva)
reserve requirement
tipo de interés oficial (BCE)
ECB policy rate
operaciones de mercado abierto
open market operations
oferta / demanda
supply / demand
elasticidad de la demanda
elasticity of demand
precio de equilibrio
equilibrium price
masa monetaria
money supply
IPC (Índice de Precios de Consumo)
CPI
IPC subyacente
core CPI
inflación de demanda / de costes
demand-pull / cost-push inflation
espiral precios-salarios
wage-price spiral
IRAV (Índice de Referencia para la Actualización Anual de los Contratos de Arrendamiento de Vivienda)
reference index for annual housing-rent updates
Euríbor
Euribor
Key citations
Real Decreto-ley 6/2022 — limited housing-rent updates falling due from its entry into force (March 2022) to 31 December 2023 to the IGC variation (2%): binding on large landlords, and on other landlords only when no new agreement was reached (art. 46)
Ley 12/2023 (right to housing) — tasked the INE with a reference index for annual housing-rent updates (now the IRAV) as the limit under art. 18 LAU (DA 11ª LAU), and capped 2024 updates at 3%; since 8 October 2026 (Real Decreto-ley 29/2026, validated by the Congress Standing Committee on 12 November 2026) art. 18.1 LAU: no update unless agreed, an agreed clause naming no index uses the IRAV, and no annual update may exceed the IRAV variation; for updates falling due up to 31 December 2027 the same decree-law (DF 6ª) allows no increase at all where the rent is above the reference-price-index ceiling, and otherwise what the parties newly agree or, absent a new agreement, at most 2%
--
Tema 24
Business Formation and Contracting
Key concepts
Two main corporate forms for a real estate business: SA (Sociedad Anónima, min. capital €60,000, 25% paid at incorporation) and SL (Sociedad de Responsabilidad Limitada, min. capital now just €1 after the Crea y Crece reform).
Full SL incorporation sequence: (1) negative name certification, (2) drafting bylaws, (3) provisional NIF, (4) deposit of share capital, (5) public deed before notary, (6) ITP-AJD settlement (exempt since RDL 13/2010), (7) registration in Commercial Registry (grants legal personality), (8) final NIF via Census Declaration (form 036).
Crea y Crece Act (Ley 18/2022) reform: SL minimum capital cut from €3,000 to €1; capital between €1–€2,999 triggers a special regime (20% of annual profit to legal reserve until capital+reserve reach €3,000, and partners jointly liable for the shortfall on liquidation).
ERL (limited liability entrepreneur, Ley 14/2013) lets a sole trader shield from business debts the habitual residence, only if its value is at most €300,000 (ITP-AJD taxable value when registered in the Commercial Registry; ×1.5 in towns of over 1,000,000 inhabitants), and, since October 2022, the production equipment used in the business, identified in the Movable Property Registry, up to the last two years' combined turnover (art. 8.2) — requires notarial deed + registration in Commercial Registry AND Property Registry; debts contracted before registration keep full liability unless the creditor consents (art. 9.3); the shield is lost for later debts if annual accounts are not filed within 7 months of year-end, and regained on filing (art. 11.3); tax and Social Security debts are outside the shield, although the habitual residence can be sold for them only if no other sufficient assets are known and at least 2 years after the first attachment notice (Disposición adicional primera); no protection for fraud/gross negligence.
Tax start-up procedures: Census Declaration (form 036; the simplified form 037 was abolished on 3 February 2025) notifies AEAT of activity start; IAE (Economic Activities Tax) registration (form 840) — real estate agents fall under IAE group 834 (business section: real-estate services, intermediaries acting for third parties) or, for colegiado agents working as professionals, group 721 of the professional section (group 811 is banking); exempt from actual IAE payment if natural person, turnover <€1M, or in first 2 years of activity.
Social Security registration: self-employed → RETA (must register before starting activity, up to 60 days ahead); since 2023, contributions are based on actual net income brackets; new self-employed (first registration, or none in the previous 2 years) get a reduced flat fee for the first 12 months (€80/month in 2023–2025; from 2026 the amount set in each year's Budget Act), extendable 12 more months only if net income is below the minimum wage (art. 38 ter LETA). Legal entities hiring staff need a Contribution Account Code (CCC) from the TGSS.
No prior opening or activity licence for an estate agency (IAE group 834) with up to 750 m² of floor space open to the public, nor for fit-out works that need no project; a declaración responsable or comunicación previa to the town hall replaces it (arts. 2–4 Ley 12/2012, basic state law); other activities may still need a municipal activity licence; works: in Andalusia, minor works needing no technical project, and works on existing buildings in urban land that do not change site coverage, height, buildability or the number of dwellings, need only a declaración responsable and may start the day it is filed (art. 138 LISTA 7/2021); other works need a prior municipal licence (art. 137 LISTA); a project by an architect/aparejador is required when the works alter the structure, exterior composition, volume or use of the building (art. 2.2 LOE).
CIRCE + PAE (Entrepreneur Support Points) allow fully online SL incorporation with standard bylaws — with standard bylaws the name certificate is due within 6 business hours, the notary signing within 12 business hours of filing, and Registry inscription within 6 business hours of receiving the deed (art. 15 Ley 14/2013); notaries must handle CIRCE-initiated procedures via the Electronic Notarial Diary.
Organizational structure levels: top management (manager/managing partner), middle management (team leader/coordinator), operational base (agents/sales advisors), technostructure (market analysts/marketing), support structure (admin/legal/tax advisory).
Ley 18/2022 (Crea y Crece) — amends art. 4 LSC, cuts SL minimum capital to €1
Real Decreto Legislativo 1/2010 (LSC) — Capital Companies Act, SA minimum capital €60,000
Ley 14/2013 — support for entrepreneurs; creates ERL figure and CIRCE/PAE framework
Real Decreto-ley 13/2022 — new RETA contribution system based on actual net income
--
Tema 25
Measurement of Surface Areas and Volumes
Key concepts
Metric surface units: m² is the base unit; km² = 1,000,000 m², hm² = 10,000 m², dam² = 100 m², dm² = 0.01 m², cm² = 0.0001 m².
Rustic/rural property units: 1 centiárea = 1 m²; 1 área = 100 m²; 1 hectárea = 10,000 m² — to convert hectares→m² multiply by 10,000, áreas→m² multiply by 100.
Basic area formulas (see table) plus Heron's formula for a triangle when only the 3 sides are known (no height given).
Irregular surface areas are measured by decomposing into known shapes: perpendiculars method (diagonal + perpendicular cuts), diagonals method (n-sided polygon → n−2 triangles from one vertex), circumscribed polygon method (wrap and subtract), inscribed polygon method (fit inside and add gaps).
Volume: base unit is the cubic metre (m³); regular solid relation: faces + vertices = edges + 2. A "pointed" solid (pyramid, cone) always has 1/3 the volume of its "straight-sided" equivalent (prism, cylinder) with the same base and height.
Cubing a building (calculating total volume) is used for: sizing heating/AC, checking urban-planning volume limits, calculating material quantities (concrete, partitions).
Critical exam distinction — usable vs built floor area: usable floor area (superficie útil) excludes wall thickness and structural elements; built floor area (construida) adds wall/partition thickness; built floor area with common elements adds the proportional share of building common areas (entrance, stairs, lift). A professional selling or letting a dwelling to consumers must state its usable floor area in the information held for the public and in brochures (RD 515/1989, arts. 4.3 and 8), and advertising must not mislead (art. 3). In Andalusia, Decreto 218/2005 also requires it in any advert that describes the dwelling (art. 5.e) and in the free Documento Informativo Abreviado for new-build sales and lettings (arts. 6, 7, 11); a resale visitor gets a ficha with the built or usable area from a nota simple no more than three months old (art. 10). So always say which type any other area figure is.
Scales: mathematical ratio between drawing size and real size. Natural scale = 1, enlargement scale > 1, reduction scale < 1 (used for buildings/land). Numerical scale (fraction, e.g. 1:100) vs graphic scale (a ruler drawn on the plan, no calculation needed). Common reduction scales: 1:2, 1:5, 1:10, 1:20, 1:50, 1:100, 1:200, 1:500, 1:1,000, up to 1:2,000–1:50,000 for urban planning.
Key formulas
Square: S = a² | Rectangle: S = B × H | Triangle: S = (B × H) ÷ 2
Heron's formula: semiperimeter p = (a+b+c) ÷ 2; S = √[p(p−a)(p−b)(p−c)]
Parallelogram: S = B × H | Trapezoid: S = ((B+b) × H) ÷ 2 | Rhombus: S = (D × d) ÷ 2
Regular polygon: S = (P × a) ÷ 2 (P = perimeter, a = apothem) | Circle: S = π × R²
Circular sector: S = π × R² × (α ÷ 360°)
Cube: V = a³ | Prism: V = base area × height | Pyramid: V = (base area × height) ÷ 3
Cylinder: V = π × r² × h | Cone: V = (π × r² × h) ÷ 3 | Sphere: V = (4÷3) × π × r³
Spanish vocabulary
superficie útil
usable floor area
superficie construida
built floor area
superficie construida con elementos comunes
built floor area with common elements
centiárea / área / hectárea
centiare / are / hectare
apotema
apothem
sector circular
circular sector
cubicaje
cubing (volume calculation)
escala numérica / gráfica
numerical / graphic scale
escala de reducción / ampliación
reduction / enlargement scale
planta / alzado
floor plan (view from above) / elevation (front view)
Key citations
Real Decreto 515/1989 (art. 4.3) — a professional seller/lessor dealing with consumers must hold available to the public a description of the dwelling with its usable floor area, and include it in any brochure (art. 8)
--
Tema 26
Construction and Physical Elements
Key concepts
A solar (buildable plot) requires 3 basic services: vehicle access, water supply + drainage, electricity supply; technically it must front a paved/lit road with alignments and grading marked, and building consolidated on ≥2/3 of buildable area also counts as urban land.
Spanish land classification (tripartite, since the 1956 Ley del Suelo, now delegated to each Autonomous Community): suelo urbano (already serviced/developed), suelo urbanizable (developable, planned for future transformation), suelo no urbanizable/rústico (protected from construction — agricultural/forestry/environmental value). In Andalusia (Costa del Sol), LISTA (Ley 7/2021) replaced this with two classes only, suelo urbano and suelo rústico (art. 12); there is no suelo urbanizable. Land an older plan calls urbanizable now counts as rústico, yet sectors a plan still in force calls urbanizable ordenado or sectorizado can still be developed under it (DT 1.ª a) 3.ª), and new growth goes on suelo rústico común (art. 31): in Andalusia, 'rústico' does not mean protected. Nationally, RDLeg 7/2015 (TRLSRU) only distinguishes "rural land" vs "developed/urbanized land" (art. 21) for valuation/expropriation purposes.
Before buying a plot, request the cédula urbanística (urban planning certificate) from the Ayuntamiento. In Andalusia (Decreto 550/2022, art. 3) the council must send it within a month; it is informative only, does not bind the council and holds for at most six months. It states the land class, whether the plot is a solar, and the use and building rules, typically: buildability (edificabilidad, m² built per m² of plot), site coverage (ocupación, % of ground floor buildable), max height, max floors, minimum setback, minimum plot size, minimum frontage, patios, max building depth.
Earthworks sequence: clearing/scrub removal (despeje y desbroce) → site setting-out (replanteo) → excavation. Test pits (calicatas) check ground before excavating. Extracted soil swells (esponjamiento) — can exceed 25% of excavated volume.
Shoring (entibación) props trench walls in low-consistency ground to prevent collapse/accidents: vertical planking + braces for shallow/compact ground; full sheeting for deeper/less compact ground.
Embankments (terraplenes, add soil) and cuttings (desmontes, remove soil) bring land to grade; fill layers of 40–50cm must be compacted individually to avoid uneven settling/cracks later.
Foundation types by ground bearing capacity: isolated footings (zapatas aisladas, point loads e.g. under columns), strip/continuous footings (zapatas corridas, distributed load e.g. under load-bearing walls), raft/mat foundations (losas, whole-building slab, used on low-capacity ground), piles (pilotes, deep foundation reaching a resistant stratum when surface ground is too weak).
Reinforced concrete foundations combine steel rebar (absorbs tension) with concrete (absorbs compression) — each material does what it does best.
Load-bearing structure = vertical part (load-bearing walls or columns transmitting loads to foundation) + horizontal part (floor slabs/forjados, made of joists + infill blocks + steel mesh + ring beams + concrete topping, absorbing bending stresses).
Enclosures (cerramientos): exterior (façade, "skin" of the building) vs interior (partition walls between rooms).
Spanish vocabulary
solar
building plot
suelo urbano / urbanizable / no urbanizable (rústico)
urban / developable / non-developable (rural) land
cédula urbanística
urban planning certificate
edificabilidad
buildability (built m² per plot m²)
ocupación
site coverage
replanteo
site setting-out
desmonte / terraplén
cutting / embankment
entibación
shoring
calicata
test pit / trial borehole
zapata aislada / corrida
isolated / strip footing
losa (de cimentación)
raft/mat foundation
pilote
pile
forjado
floor slab
vigueta / bovedilla
joist / infill block
zuncho
ring beam
cerramiento
enclosure (exterior or interior)
Key citations
Ley del Suelo (1956) — origin of the tripartite land classification
Real Decreto Legislativo 7/2015 (TRLSRU) — current national land law, "rural" vs "developed" basic situations (art. 21)
--
Tema 27
Roofs, Coverings, Finishes and Building Installations
Key concepts
Roof choice depends on climate: steep pitched roofs (tejados) shed snow by gravity, common in mountain areas; flat roofs (azoteas) are common on the coast and are usable as terraces/solar-panel space. Watch points: pitched roofs are harder to inspect (hidden leaks); flat roofs risk water ingress if the waterproofing membrane ages/cracks (no slope to drain quickly).
Pitched roof parts: eave (alero, protects wall from rain), gutter (canalón, collects rainwater) + downpipe (bajante), ridge (cumbrera, highest line). A blocked/rusted gutter is a common cheap-to-fix fault that causes façade damp if ignored.
Flat roof (azotea) finish depends on use: walkable → outdoor tile; non-walkable → bituminous or rubber waterproof sheeting. Check waterproofing age before buying a penthouse (ático).
Partition walls (tabiques): exterior enclosure (thermal/acoustic insulation + waterproofing) vs interior (lighter, mainly acoustic separation between rooms) — brick (solid, slower) vs plasterboard/pladur (fast, lighter, easier for installations, generally worse acoustic insulation unless filled with mineral wool).
Thermal/acoustic insulation: air cavity (cámara de aire, ~5cm gap) historically used, but air alone is a poor insulator against convection/radiation — modern practice fills the cavity with polyurethane foam or rock wool. Windows are the weakest insulation point (thermal break in aluminum frames, noise-reducing glass).
CTE (Building Technical Code, RD 314/2006): DB-HE regulates thermal insulation (energy saving); DB-HR (2007) sets minimum acoustic insulation between dwellings and against outside noise. Construction date relative to these requirements often explains why comparable dwellings feel different thermally/acoustically.
Solado = rigid floor covering (fired clay, terrazzo, slate, stoneware/gres) — wood/plastic/carpet are NOT technically "solados." Alicatado = vertical wall tiling (bathrooms/kitchens) for damp-proofing, cleanability, decoration.
Carpentry (carpintería): doors (access/protection) vs windows (light/ventilation, usually double-glazed) — both have a frame (marco, fixed) and leaf (hoja, moving). Opening types: hinged (abatible), sliding (corredera, saves swing space), folding (plegable), roller (enrollable, common for shutters).
Cerrajería (locksmithing) = metal security/protection elements (locks, bars, railings, hardware); vidriería (glazing) = all glass elements, double glazing standard now for insulation.
Plumbing (fontanería): supply (from façade connection → general shut-off valve → main pipe → horizontal branch lines → dwelling branches) and sanitation/drainage (rainwater, used water, ground moisture → public sewer or private septic tank if no municipal network).
Hot water systems: individual water heater, combi boiler (heating + hot water, individual), central boiler (whole building, shared cost/risk), solar panels.
Electrical installation path: service connection (acometida) → meter room → per-dwelling devices: power limiter (contracted power cap), residual-current device/interruptor diferencial (leak/electrocution protection), fuses/circuit breakers (short-circuit/overload protection).
Heating: district heating (whole neighborhood), collective central (one building boiler), individual (own boiler per dwelling); distribution via radiators (fast, localized) vs underfloor heating/suelo radiante (even, slower to heat, pricier to retrofit).
Air conditioning does 3 jobs at once: filters air, regulates humidity, regulates temperature. Types: split (most common in dwellings), ducted (hidden, more construction work), portable, heat pump (reversible heating/cooling).
Private vs communal responsibility (exam favorite): private = everything inside the dwelling from its own meter/connection onward (interior plumbing branches, interior electrical panel/wiring, individual heating system); communal = shared infrastructure (main pipes, horizontal branch lines to each floor, general electrical connection up to meter room, elevator always communal, roof/flat roof (cubierta) always a common element (art. 396 CC), even when the title or bylaws give a penthouse exclusive use of the azotea (exclusive use is not ownership)).
Elevators: electric (traction cables + counterweight + machine room, ~0.60 m/s typical) vs hydraulic (cylinder in the pit, quieter, used in low-rise, no separate machine room needed, but pricier). Control/maniobra types: simple, down-collective, up-and-down collective, duplex (coordinates multiple elevators).
CTE DB-SUA (SUA 9) requires an accessible lift or ramp in new residential buildings where more than two floors must be climbed from an accessible main entrance to any dwelling or communal area, or with more than 12 dwellings on floors without an accessible entrance; in existing buildings, installing a lift needs only a simple majority (majority of owners who also hold the majority of quotas, art. 17.2 LPH), and it is mandatory without any vote when requested by an owner in whose home a person over 70 or with disability lives or works, provided the cost passed on each year, after subsidies, does not exceed 12 months of ordinary community fees (if the community seeks financing, counted over as many years as the financing allows; the requesters may pay any excess), or, whatever the cost, once aid actually granted reaches 70% of it, and the community must apply for any aid calls the requester points out (art. 10.1.b LPH as amended by Ley 4/2026, in force since 23 October 2026; before that, 75% of the aid available).
Spanish vocabulary
cubierta / tejado / azotea
roof / pitched roof / flat roof
alero / canalón / bajante / cumbrera
eave / gutter / downpipe / ridge
tabique
partition wall
cámara de aire
air cavity
rotura de puente térmico
thermal break
solado / alicatado
flooring / wall tiling
carpintería
carpentry (doors/windows)
marco / hoja
frame / leaf (of door or window)
cerrajería / vidriería
locksmithing / glazing
fontanería / saneamiento
plumbing / sanitation-drainage
llave de corte general
general shut-off valve
acometida
service connection
interruptor diferencial
residual-current device
suelo radiante
underfloor heating
privativo / comunitario
private / communal (element)
ascensor / montacargas
elevator / freight lift
maniobra (de ascensor)
elevator control/dispatch logic
Key citations
Real Decreto 314/2006 — Building Technical Code (CTE)
DB-HE (thermal), DB-HR (acoustic), DB-SUA (accessible lift or ramp when more than two floors must be climbed from an accessible entrance, or more than 12 dwellings are on floors without one)
Ley de Propiedad Horizontal — governs retrofitting elevators in existing buildings (simple majority of owners and quotas, art. 17.2; mandatory without a vote when requested for a resident >70 or with disability, within the 12-months-of-fees cap or once aid actually granted reaches 70%, art. 10.1.b as amended by Ley 4/2026, in force since 23 October 2026)
Módulo 3
Derecho Público
Tema 36
Law 39/2015 (LPAC) — Full Text of the Common Administrative Procedure Act
Key concepts
LPAC is the primary source-law behind Tema 28 (Administrative Law); this file is the full consolidated BOE text, not a course module — treat it as the article-map to cite when Tema 28's summary isn't precise enough.
Legal capacity to act (art. 3): natural/legal persons per civil law; minors for rights exercisable without parental assistance; groups/estates when a law expressly allows it.
Interested party (art. 4): (a) initiates the procedure as rights-holder, (b) holds rights that may be affected without having initiated it, (c) legitimate interests affected who appear before a final decision. Status is transmissible to successors (art. 4.3).
Representation (art. 5): presumed for mere procedural acts; must be proven for applications, appeals, withdrawals, waivers — provable via apud acta power of attorney or the electronic register of powers of attorney (art. 6, max. validity 5 years).
Electronic interaction (arts. 13–14): natural persons choose electronic vs. paper unless legally obliged; legal persons, entities without legal personality, members of professions that require compulsory association membership (for acts done in that profession — incl. notaries and registrars), anyone representing an obliged party, and public employees (acting as such) are ALWAYS obliged to interact electronically.
Calculation of time limits (art. 30): days = working days (Sat/Sun/holidays excluded) unless a law states calendar days; months/years counted from day following notification, ending on the same day of the month, or last day of month if no equivalent date exists; a deadline falling on a non-working day rolls to the next working day.
Extension (art. 32): may extend up to half the original term, ex officio or on request, only before the deadline expires — never retroactively.
Notification (arts. 40–46): must be sent within 10 days of the act; must state the ruling, whether it exhausts administrative remedies, and appeal routes/deadlines — omission means the notification only takes effect once the party acts on it or appeals. Where electronic notification is mandatory for the recipient (e.g. companies, professionals) or the recipient chose it, an electronic notification left unopened for 10 calendar days is deemed refused (and thus effected) (art. 43.2). Failed/unlocatable notification defaults to publication in the BOE (art. 44).
Nullity vs. voidability (arts. 47–52): absolute nullity (void ab initio, imprescriptible) for breaches of rights protected by amparo, manifest lack of competence by subject matter or territory, impossible content, criminal acts, total disregard of procedure, acts (incl. by silence) granting rights to someone lacking the essential requirements, and any other ground set by law; voidability (annullable, curable) for any other legal-order infringement, including misuse of power. Formal defects and late acts are only voidable if they deny due process or where the time limit's nature requires it. Voidable acts may be ratified (art. 52).
Ex officio review (arts. 106–111): nullity of a final/unappealed act may be declared at any time by the Administration, requiring a favorable opinion from the Council of State (or regional equivalent); "declaration of injuriousness" (lesividad) to challenge a favorable-but-voidable act before the courts must occur within 4 years and itself needs judicial confirmation.
Spanish vocabulary
LPAC
Law 39/2015, Common Administrative Procedure Act
capacidad de obrar
legal capacity to act
interesado
interested party
poder apud acta
power of attorney granted by personal/electronic appearance
sede electrónica
electronic office/headquarters
plazo
time limit / deadline
notificación
notification
publicación en el BOE
publication in the Official State Gazette
nulidad de pleno derecho
absolute nullity (void as a matter of law)
anulabilidad
voidability
desviación de poder
misuse of power
revisión de oficio
ex officio review
declaración de lesividad
declaration of injuriousness
ratificación
ratification (curing a voidable act)
Consejo de Estado
Council of State
Key citations
--
Tema 37
Administrative Law — Procedure, Silence and Appeals (Módulo 28)
Key concepts
Administrative Law = public law regulating the Executive's organization and its relations with the administered; applies to the State, Autonomous Communities, local authorities and professional associations alike.
The common procedure (Law 39/2015, in force since 2 October 2016, repealed Law 30/1992) has four phases: initiation (arts. 54–69), development/ordering + investigation (arts. 70–83), termination (arts. 84–95), enforcement (arts. 97–104).
Initiation is either ex officio (own initiative, higher order, reasoned request, or complaint) or at the interested party's request; sanctioning procedures are ALWAYS initiated ex officio, with the investigation phase strictly separated from the sanctioning-decision phase.
Applications for initiation (art. 66) need: identity, notification address, facts/reasons/request, place/date, signature, addressee body. Defects get a 10-day cure period or the application is deemed withdrawn.
Investigation: evidentiary period max. 30 days / min. 10 days; hearing stage precedes the proposed decision; reports are non-binding unless a rule says otherwise (in liability claims the report of the service concerned is always mandatory; the Council of State's opinion is mandatory from €50,000, and in Andalusia the Consejo Consultivo's above €70,000 against the Junta and above €50,000 against town halls).
Termination: decision, withdrawal, waiver, lapse (caducidad), or termination by agreement. Sanctioning procedures can end by acknowledgment of responsibility or voluntary payment.
Lapse (art. 95): in party-initiated procedures paralyzed by the party's own fault, a warning is given and lapse occurs after 3 months.
Forced enforcement means (arts. 101–104): attachment of assets, execution by substitution, coercive fine (repeatable), compulsion against persons (only where the law expressly allows it).
Three administrative appeals: appeal to a higher authority (recurso de alzada, 1 month to file against an express act — any time against a silence; 3 months to decide, silence = negative, except that an alzada against a request already refused by silence is deemed upheld unless the matter is one of the art. 24.1 negative-silence matters), appeal for reconsideration (recurso de reposición, optional alternative to judicial review, 1/1 months), extraordinary appeal for review (recurso extraordinario de revisión, only against final acts on narrow grounds — 4 years for factual-error ground, 3 months for the others). Town halls: decisions of the Pleno, the Mayor (Alcalde) or the Junta de Gobierno, and those taken by delegation from them, end the administrative route (art. 52.2 LBRL) — against them only the optional reposición or a contentious-administrative appeal, never alzada.
Judicial review (recurso contencioso-administrativo): 2 months from an express act / 6 months from an act presumed by positive silence; a refusal by silence can be challenged with no time limit (STC 52/2014); a lawyer is always required; a procurador is mandatory before collegiate courts and optional before single-judge courts (art. 23 LJCA).
Administrative silence (arts. 24–25): max. decision period set by the governing rule, capped at 6 months unless a statute or EU law sets a longer one (default 3 months if unspecified; for applications counted from entry in the competent body's register). Party-initiated procedures default to POSITIVE silence unless a law with the rank of statute or EU law provides otherwise, and except for right-of-petition/public-domain/environment/liability/challenge/ex-officio-review matters, which are NEGATIVE. In urban planning, permits for new-build works and for siting prefabricated houses must be express and silence means refusal (art. 11.4 TRLSRU), and no rights contrary to planning are ever acquired by silence (art. 11.3 TRLSRU). Ex officio procedures: favorable-rights procedures → deemed dismissed by silence; sanctioning/burdensome procedures → lapse (caducidad).
Spanish vocabulary
procedimiento administrativo común
common administrative procedure
iniciación de oficio
initiation ex officio
denuncia
complaint (triggering ex officio action)
trámite de audiencia
hearing stage
desistimiento
withdrawal
renuncia
waiver of right
caducidad
lapse (of the procedure)
ejecución subsidiaria
execution by substitution
multa coercitiva
coercive fine
recurso de alzada
appeal to a higher authority
recurso de reposición
appeal for reconsideration
recurso extraordinario de revisión
extraordinary appeal for review
recurso contencioso-administrativo
judicial review proceedings
silencio administrativo positivo/negativo
positive/negative administrative silence
agotar la vía administrativa
to exhaust administrative remedies
Key citations
--
Tema 38
Introduction to the Cadastre (Quick Reference)
Key concepts
Cadastre = administrative register under the Ministry of Finance (Hacienda); mandatory and free of charge; records physical, economic and legal data on rustic, urban and special-characteristics property.
Cadastre (fiscal purpose, physical/valuation data) vs. Land Registry (legal purpose, protects ownership/rights in rem) — the two should match but can diverge.
Cadastral reference: unique property ID, mandatory on deeds, contracts, tax declarations and transfers.
Cadastral titleholders (owners, usufructuaries, concession holders, surface-right holders) are presumed accurate but this is NOT full title as in the Land Registry.
Owners must declare alterations (sales, inheritance, new construction, demolition, subdivision, merger) within 2 months of the event — unless the change reaches the Cadastre by 'communication': a sale or inheritance formalised in a notarial deed or registered at the Land Registry, with the cadastral reference provided, is reported by the notary or registrar and the owner need not declare it (arts. 13.2 and 14.a TRLCI).
Cadastral value is the base of the IBI (property tax) and of IRPF imputed income. For the municipal capital-gains tax only the land's cadastral value counts, times a holding-period coefficient, and the seller can ask for the actual gain instead if it is lower (art. 107 TRLRHL, since RDL 26/2021). By law cadastral value can never exceed market value.
Protected data (ownership, value) needs titleholder status or authorization; non-protected data (surface, use, reference) is open to anyone via the Electronic Office.
Law 13/2015 pushes Cadastre–Land Registry coordination: the georeferenced plot plan is mandatory on first registration and on subdivision, segregation, merger, expropriation or boundary setting (art. 9.b Ley Hipotecaria); for a plain sale it is optional, though the deed still carries the cadastral certificate (art. 3.2 TRLCI).
Spanish vocabulary
Catastro Inmobiliario
Real Estate Cadastre
Hacienda
(Ministry of) Finance
Registro de la Propiedad
Land Registry
referencia catastral
cadastral reference
titular catastral
cadastral titleholder
valor catastral
cadastral value
IBI (Impuesto sobre Bienes Inmuebles)
property tax
plusvalía municipal
municipal capital-gains tax
Sede Electrónica del Catastro
Cadastre's Electronic Office
Key citations
--
Tema 39
The Cadastre — Concept and Regulations (Módulo 29)
Key concepts
Governing rule in force: RDLeg. 1/2004 (TRLCI, Consolidated Text of the Real Estate Cadastre Act) + implementing RD 417/2006. History: Law 39/1988 created the IBI → Law 48/2002 (first specific Cadastre law) → TRLCI 2004 (current).
Cadastral classes of property (art. 6.4 TRLCI): urban, rustic, and special-characteristics (Groups A–D: energy/gas/nuclear, dams/reservoirs, toll roads, airports/ports).
Cadastral titleholder (art. 9 TRLCI): full/lesser ownership, administrative concession, surface right (derecho de superficie), usufruct. Pro-indiviso co-ownership → title to the community + each co-owner individually; gananciales → equal halves unless proven otherwise. On Cadastre/Registry discrepancy, the Registry title prevails unless the cadastral document is later.
Incorporation procedures (art. 11 TRLCI): declarations/notifications/applications (owner or collaborating notary/registrar/town council), correction of discrepancies, cadastral inspection, valuation.
Filing deadline for cadastral declarations: 2 months from the triggering event (completion of works, change-of-use authorization, deed date) — art. 28 RD 417/2006.
Cadastral reference (art. 6.3 TRLCI, arts. 18–20 RD 417/2006): 20-character alphanumeric code (urban: 7 plot + 7 map sheet + 4 property within the plot + 2 check characters; rustic: 2 province + 3 municipality + 1 sector + 3 polygon + 5 parcel + 4 property + 2 check characters); assigned on first registration and never reassigned; a provisional reference can be requested by a notary for pending consolidation.
Provisional cadastral registration (art. 25 RD 417/2006) applies when evidence is inconclusive but reasonably supports the description.
Cadastral inspection (arts. 19–21 TRLCI, arts. 47–55 RD 417/2006): ex officio verification/regularization; effects are retroactive to the date of the event, with a 6-month window, from notification of the cadastral alteration, to open a sanctioning procedure (art. 20.2 TRLCI as amended by Law 11/2021).
Cadastral value (arts. 22–32 TRLCI): land value + construction value, capped at market value via a ministerial market-reference coefficient. Set via valuation panels (ponencias de valores: total/partial/special). General collective valuation requires ≥5 years since the last valuation, mandatory by year 10.
Standard maximum decision period for cadastral procedures: 6 months, with NEGATIVE silence as the default.
Spanish vocabulary
TRLCI
Consolidated Text of the Real Estate Cadastre Act (RDLeg. 1/2004)
bien inmueble de características especiales (BICE)
property of special characteristics
titular catastral
cadastral titleholder
derecho de superficie
surface right
usufructo
usufruct
pro indiviso
undivided co-ownership
gananciales
community property of marriage
ponencia de valores
valuation panel
valoración colectiva general/parcial
general/partial collective valuation
inspección catastral
cadastral inspection
discrepancia catastral
cadastral discrepancy
Key citations
--
Tema 40
Consolidated Land and Urban Rehabilitation Act (RDLeg. 7/2015) — Full Text
Key concepts
Structure: Preliminary Title (definitions, arts. 1–4) → Title I (citizen/owner statute, arts. 5–19) → Title II (land-regime bases, common procedural/civil rules, arts. 20–28) → Title III (Building Evaluation Report, arts. 29–30) → Title IV (inter-administrative cooperation, arts. 31–33) → Title V (valuations, arts. 34–41) → Title VI (expropriation & patrimonial liability, arts. 42–48) → Title VII (social function of property: compulsory sale/substitution, public land holdings, right of superficies, arts. 49–54) → Title VIII (legal regime: nullity, appeals, Land Registry, arts. 55–68).
This is the same law condensed for exam purposes in Módulo 30 (definitions, land situations, valuation, discipline) — this tema adds the structural/registry/expropriation machinery Módulo 30 doesn't detail.
Expropriation (art. 42): plan approval itself declares public utility/necessity of occupation where execution requires it; delimiting an urban-environment action area, once final in administrative proceedings, declares public utility/social interest for expropriation and compulsory sale/substitution; the clause also subjecting the land to the Administration's first-refusal/redemption rights was struck down (STC 143/2017), so those rights now depend on regional law (in Andalusia, e.g. areas delimited under LISTA art. 132).
Fair compensation (art. 43): individual or joint-appraisal procedure; in-kind payment for urban-environment actions doesn't require owner consent if within the action area and completion deadline.
Taking possession + Registry (art. 44): record of possession is a registrable title (needs cadastral reference/graphic representation); acquisition is free of charges once possession is taken (art. 45) — no possessory action lies against the Administration afterward.
Reversion vs. re-assessment (art. 47): reversion applies if the expropriation's use changes UNLESS (a) public-facility use maintained 8+ years, (b) land holdings expansion, (c) urban development action, (d) owner's own duty-failure caused the expropriation. For development-action expropriations specifically: reversion after 10 years without completed development; re-assessment (retasación) if use/floor-area changes increase value outside a full planning review.
Compensable cases (art. 48): change in execution conditions before deadlines expire (or after, if delay is the Administration's fault); non-compensability applies to mere non-conformity-with-planning situations (fuera de ordenación) arising from later plan changes, though losing the lawful use and enjoyment of the building during its useful life can be compensated.
Compulsory sale/substitution (arts. 49–50): triggered by an owner's failure to fulfil duties (build/conserve); awarded via publicity + competitive bidding; the content of ownership can never be reduced by more than 50% of its value.
Public land holdings (patrimonios públicos de suelo, arts. 51–52): a separate patrimony, funded by the 5–15% development-potential transfer duty; must go to publicly-protected housing (VPO) or specified social/urban purposes; registrable limitations/conditions can trigger transfer termination on breach.
Right of superficies (arts. 53–54): right in rem to build on/use another's land while owning the construction temporarily; must be in a public deed, registered, max. 99 years; extinguishes on term expiry with reversion to the landowner (no compensation owed) unless otherwise agreed.
Void acts and criminal referral (arts. 55–56): permits breaching green-area/open-space planning are void as a matter of law; indications of an urban planning crime suspend the administrative sanctioning file and trigger referral to the Public Prosecutor (non bis in idem).
Land Registry recordability (arts. 65–68): final execution-approval acts, compulsory land assignments, discipline-proceeding initiations, and rights transfers are all registrable — by full registration, preventive annotation (4-year lapse, e.g. discipline files), or marginal note depending on the act's category.
Spanish vocabulary
TRLSRU / TRLSR
Consolidated Text of the Land and Urban Rehabilitation Act (RDLeg. 7/2015)
justiprecio
fair compensation (expropriation)
reversión
reversion (of expropriated land)
retasación
re-assessment/re-valuation
venta forzosa
compulsory sale
sustitución forzosa
compulsory substitution
patrimonio público de suelo
public land holdings
derecho de superficie
right of superficies
desafectación
deallocation (from public domain)
nulidad de pleno derecho
absolute nullity
acción pública urbanística
public action (in urban planning matters)
anotación preventiva
preventive annotation (Land Registry)
nota marginal
marginal note (Land Registry)
Key citations
--
Tema 41
Urbanism and Land Use Regime (Módulo 30)
Key concepts
Constitutional basis: art. 33 CE (property's social function, expropriation with compensation), art. 47 CE (right to housing, anti-speculation, community share in capital gains), art. 148.1.3 CE (regional urban planning competence), art. 149.1.1 CE (State's equality-conditions competence).
STC 61/1997 is the pivotal ruling: it struck down the 1992 Land Act's specific urban-planning techniques as regional-competence encroachment, leaving the State only basic-equality/valuation/liability rules and full urban planning to the 17 Autonomous Communities.
Current State law: RDLeg. 7/2015 (TRLSRU), basic legislation nationwide, consolidating the 2007 Land Act + 2013 Urban Rehabilitation Act.
Two basic land situations replace the old 3-way classification: RURAL (protected/undeveloped) and DEVELOPED (integrated into the urban grid via planning execution, operational services, sufficient building occupancy, or qualifying traditional settlements).
Subsidized-housing (VPO) land reserve: ≥40% of residential floor area for new development, ≥20% for reform/renewal of existing development (art. 20.1.b TRLSRU, raised from 30%/10% by Law 12/2023 with effect from 26 May 2023; regional law may exceptionally allow a lower reserve or exempt certain municipalities or actions).
Valuation: rural land = capitalization of actual/potential income, NO development expectations; developed unbuilt land = static residual method; developed built land = the higher of (a) land and lawful building valued together by the comparison method, or (b) the residual value of the land alone, ignoring the building (art. 37.2 TRLSRU).
Conservation duty limit: half the current cost of an equivalent new building (art. 15.3 TRLSRU; in Andalusia half of the replacement cost, art. 144.3 LISTA). Works beyond that limit ordered for general-interest improvements are paid by the authority that orders them (art. 144.3 LISTA). In Andalusia the limit can be raised to 75% when ordered works are not carried out without justification (art. 144.4 LISTA). Above the limit, legal ruin (ruina urbanística) may be declared (art. 146 LISTA); a catalogued or protected building cannot then be demolished — only complete rehabilitation is possible (art. 146.3.a LISTA).
Urban planning permits: building, subdivision and land-use licences (art. 137 LISTA), plus activity permits. In Andalusia, first occupancy of a finished building built under a licence, and a change of use in an existing urban building that adds no dwellings, need only a declaración responsable (art. 138.1.d, f LISTA).
Infringement categories mirror later Tema 44 detail: very serious / serious / minor, with limitation periods set by regional law — in Andalusia 4 years for serious and very serious infringements and 1 year for minor ones (art. 169 LISTA); the separate power to restore legality (e.g. order demolition) lasts 6 years from completion, and has no time limit on public domain and protection easements, coastal-influence rustic land, green areas and other listed cases (art. 153 LISTA).
Non-conformity with planning (fuera de ordenación): legally built, later out of line with the plan; the plan sets the works allowed (art. 84.3 LISTA). By default: repair, conservation and habitability works; exceptionally, reform without extra footprint or volume, or a compatible change of use, if no expropriation or demolition is due within 5 years. Limits value and financing.
Spanish vocabulary
urbanismo
urban planning (as a discipline)
función social de la propiedad
social function of property
suelo rural / suelo urbanizado
rural land / developed land
PGOU
General Urban Development Plan
aprovechamiento urbanístico
development potential / buildable floor area entitlement
cesión de aprovechamiento
dedication of development rights
reserva de vivienda protegida
subsidized-housing land reserve
fuera de ordenación
non-conformity with (current) planning
cédula urbanística
planning/urban certificate
deber de conservación
conservation duty
ruina (declaración de)
structural condemnation
Key citations
--
Tema 42
Urban Planning Instruments (Módulo 31)
Key concepts
Distinguish urban planning (ordenación urbanística, the whole legal framework) from planning instruments (planeamiento, the specific plans that particularize it).
Statutory right of urban property: content isn't fixed a priori — owners only acquire powers once they fulfil duties; heterogeneous (varies by land class/zone); publicly directed; governed by equitable distribution of benefits/burdens.
Classification (land class; in Andalusia since LISTA, 23 Dec 2021, only urban or rustic, art. 12; 'developable' land survives only as sectors of plans already in force, DT 1ª) vs. designation (specific use assigned within a classified zone) — two distinct planning techniques.
Planning hierarchy (top to bottom): EU/state basic legislation → regional laws/Regional Planning Schemes → Regional Coordination Master Plans (PDTC) → Municipal General Plan (PGOU/PGMO) or Subsidiary Standards → Partial/Special Plans → Detail Studies/Development Projects.
Territorial plans (supra-municipal; in Andalusia the POTA and subregional POTs, art. 34 LISTA; the PDTC and its 1-year rule are 1976 state law) bind municipalities: their directly applicable rules prevail at once, and municipal plans must adapt within the term set in the plan's approval decree, after which the territorial rules prevail (arts. 55–56, 85.2 LISTA); plans in force in 2021 had until 23 Dec 2025 at the latest (DT 2ª.5).
PGOM functions in Andalusia (art. 63 LISTA): classify land as urban or rustic, regulate the rustic categories, define the general structure (roads, facilities, general green space keeping at least the existing standard and never below 5, 7 or 10 m²/inhabitant in municipalities under 10,000, 10,000–100,000 and over 100,000, art. 82.3 RLISTA), set criteria for new-urbanisation actions (detailed by Partial Plans); urban land is detailed by the Urban Ordering Plan (POU, art. 66). The flat 5 m² and the two 4-year stages are 1976 state law.
Partial Plans develop a General Plan sector in detail (zoning, roads, VPO reserve — state minimum ≥40% of residential floor area in new development, stage plan) — may NEVER amend the General Plan.
Detail Studies: narrowest instrument — only adjust alignments/volumes; may NOT reduce roads/open spaces, increase buildable volume/density, alter assigned use, or harm neighboring properties.
Special Plans: sectoral purpose (infrastructure, heritage, inner reform) — cannot classify land or serve as comprehensive planning.
Development Projects (Proyectos de Urbanización): technical works projects (NOT planning instruments) executing development works — cannot modify the plan they implement.
Modification (partial, doesn't touch the territorial model) vs. Revision (overall reconsideration, replaces the model) of plans — revision needs the full original approval procedure including strategic environmental assessment.
Public Interest Actions (AIP) on rustic land: exceptional authorization for non-agricultural uses (rural hotels, golf courses; renewable-energy plants only on protected or preserved rustic land, since on common rustic land LISTA makes them an ordinary use needing just a municipal licence, art. 21 LISTA and STC 25/2024) needing public-utility justification, siting necessity, landscape compatibility, and payment of a compensatory levy — in Andalusia, LISTA (in force 23 Dec 2021) replaced AIPs with 'extraordinary actions' (actuaciones extraordinarias) on rustic land, which need a prior authorisation before the licence (6 months to decide, silence = refusal) and a compensatory payment of 10% of the material execution budget of the works, excluding machinery and equipment (municipal ordinances may lower it on the regulation's criteria), but always 15% for an isolated single-family house (art. 22.5 LISTA; art. 35 RLISTA) — independent of the building permit and opening/activity permit.
Spanish vocabulary
planeamiento urbanístico
urban planning instruments
clasificación del suelo
land classification
calificación del suelo
land designation
Plan Director Territorial de Coordinación (PDTC)
Regional Coordination Master Plan
Plan General de Ordenación Urbana (PGOU)
General Urban Development Plan
Plan Parcial
Partial Plan
Estudio de Detalle
Detail Study
Plan Especial
Special Plan
Proyecto de Urbanización
Development Project
modificación / revisión del plan
modification / revision of the plan
Actuación de Interés Público (AIP)
Public Interest Action
canon compensatorio
compensatory levy
Key citations
--
Tema 43
Execution Systems (Módulo 32)
Key concepts
Executing the plan = development (urbanización: infrastructure provision, always a public function regardless of who performs it) + construction (edificación, essentially private, controlled via permits).
Three classic execution systems (1976 Consolidated Text, supplementary): Compensation (owners execute, owners pay 100%, private), Cooperation (Administration executes, owners pay, mixed), Expropriation (Administration executes and pays, recovers via resale, public).
Compensation system: owners form a Compensation Board (Junta de Compensación) — an administrative-nature entity with own legal personality, self-protection privileges (enforceable acts, immune to possessory actions), acting as fiduciary with full disposal power over members' land.
Board formation (Andalusia): owners with more than 50% of the surface submit Statutes + Bases of Execution → initial approval or refusal within 20 days → 20 days' public information and owner hearing → initiative decided within 2 months (silence = approval) → deed of constitution → final approval → registration. Owners who have not joined get 1 month from notice to join by deed of adhesion. In Andalusia an owner who neither joins nor asks to be expropriated is not expropriated: forced reallotment (reparcelación forzosa) applies, and they pay their share of the costs in buildable land or plots (LISTA art. 101.4).
Compensation Project: the technical-legal document distributing benefits/charges, approved within the Board by members holding more than 50% of the surface or of the participation shares, then ratified by the Administration, which may refuse only on strict legality grounds (silence = ratification); has reallotment (reparcelación) effects: land transfer to Administration, plot subrogation, real burden for development costs, ITP-AJD exemption and no plusvalía charge for allotments in proportion to the land contributed, if all planning requirements are met (any excess is taxed).
Real burden (afección real): registered charge on newly-allotted plots for pending development dues — automatically binds any buyer via Land Registry subrogation (classic API due-diligence trap).
Development company (empresa urbanizadora) may join the Board as a member (paid in land, shares risk) or as mere contractor (paid in cash, no board membership).
Owner default or deadlock (Andalusia): there is no forced-compensation (compensación forzosa) system. If owners miss the plan's deadlines, the Administration may switch to indirect management (an agente urbanizador) or to a public system (cooperation or expropriation). It may also replace the system where owner obstruction endangers the action. It acts ex officio or at any interested party's request and must decide within 6 months (LISTA arts. 99.5, 100.3, 104).
Cooperation system: Administration manages/executes; owners pay via a Reallotment Project (Proyecto de Reparcelación); lower deadlock risk since the Administration can act unilaterally.
Expropriation system: Administration expropriates all owners (joint appraisal is standard), develops, and sells to recover investment; fair compensation follows the land's actual situation (TRLSRU arts. 34–38): rural land at capitalised rent with no planning expectations, urbanised land by the residual method, plus the lost right to take part in the development where art. 38 applies; limited right of reversion since Law 8/2007.
Preconditions for execution: approved detailed planning, delimited execution unit, approved Development Project.
Development agent (agente urbanizador, from Valencian Law 6/1994): decouples urban development initiative from land ownership — any company can execute a sector without owning the land, remunerated in plots or cash.
Spanish vocabulary
sistema de actuación
execution system
urbanización / edificación
development (infrastructure) / construction (building)
Junta de Compensación
Compensation Board
Estatutos y Bases de Ejecución
Statutes and Bases of Execution
Proyecto de Compensación
Compensation Project
afección real
real burden (registered charge)
cuotas de urbanización
development dues
compensación forzosa
forced compensation
Comisión Gestora
Managing Commission
reparcelación
reallotment
agente urbanizador
development agent
justiprecio
fair compensation (expropriation)
Key citations
--
Tema 44
Urban Planning Discipline (Módulo 33)
Key concepts
Three independent, compatible strands: preventive control (permits), restoration of legality (demolition/suspension, independent of any fine), penalty power (fines).
Post-STC 61/1997, discipline is fully regionalized (17 different regimes); RDU 1978 remains supplementary; Law 40/2015 (LRJSP, arts. 25–31) supplies the general penalty principles (legality, proportionality, culpability, non bis in idem) and LPAC the penalty procedure.
Three infringement tiers (Andalusia, art. 161 LISTA): very serious (illegal subdivisions, urbanization works against the plan, works on public green areas, roads or facilities, carrying on despite a stop order, harm to protected buildings or preserved land), serious (any works without a licence or declaración responsable or departing from it, legalizable or not, and works or uses against the plan — the day-to-day core), minor (formal breaches only: no licence sign or copy on site, misleading advertising, unauthorized utility hook-ups). Works on specially protected rustic land are territorial infringements graded the same way (art. 161.5–8). No tier is imprescriptible: infringements prescribe (art. 169); only restoration can be ordered at any time in some zones (art. 153.2).
Liability is plural (art. 166 LISTA): for works without or against a licence or declaración responsable, the developer, contractor, builder and site director are each fined, and the owner of the land or building is presumed to be the developer unless he proves otherwise. The official who granted a permit without or against the required reports, the council members who voted for it, the Secretary and the technicians who reported favourably are liable too, but only with intent or gross negligence. Fines are independent, but those who acted jointly answer jointly unless the fine is split by share.
Fines come in euro bands (art. 162 LISTA): minor €600–2,999; serious €3,000–29,999, the cap rising to 75% of the value of the works, land or damage when that is higher; very serious €30,000–120,000, cap up to 150%. Only the illegal part counts. Golden rule: an infringement may never leave the offender with net economic benefit — any gain left after the fine and the restoration cost is confiscated (decomiso, art. 165 LISTA, art. 388 Regulation), not added to the fine.
Aggravating factors → max. penalty degree (public-office abuse, violence/bribery, falsified documentation, exploiting need, recidivism); mitigating → min. degree (no intent to harm, repaired damage pre-file). Professional expertise aggravates; lay-person status mitigates.
Penalty procedure: investigation/decision-body separation is mandatory; max. duration set by regional law — 1 year from the opening decision in Andalusia (art. 170.1 LISTA); voluntary payment with ~20% reduction available; non bis in idem suspends the administrative file when criminal indications arise (arts. 319–320 CP) and refers to the Public Prosecutor.
Restoration of legality is independent of the fine: suspension of illegal works → voluntary demolition period → subsidiary execution by the Administration (at offender's cost) or repeated coercive fines.
Non-conformity with planning (fuera de ordenación): total (only conservation/maintenance works) vs. partial (renovation allowed if it doesn't touch the non-conforming element).
Limitation periods: the state default (art. 30 Law 40/2015, LRJSP — only where the sector law sets none) is very serious 3y / serious 2y / minor 6 months for infringements, but 3y / 2y / 1 year for penalties; Andalusia sets its own — infringements 4 years (serious and very serious) / 1 year (minor), penalties 3 years / 1 year (art. 169 LISTA). Continuing infringements don't start the clock until the illegal situation ceases. Restoration of legality runs on a separate clock: 6 years from completion of the works, but at any time for works on public domain or protection easements, coastal-influence rustic land, green areas, catalogued heritage and some rustic-land subdivisions (art. 153 LISTA). A finished illegal building past that period is 'asimilado a fuera de ordenación' (AFO): no utility connections and no works until the town hall recognises that status (art. 173 LISTA).
Energy Performance Certificate (CEE) regime is a parallel, separate infringement track (12th/13th Additional Provisions TRLSRU): minor (no energy rating in ads, €300–600) / serious (selling/leasing without delivering the CEE, €601–1,000) / very serious (falsification, €1,001–6,000). CEE valid for a maximum of 10 years — only 5 years if rated G (art. 13.1 RD 390/2021). Excluded from the CEE regime, among others: officially protected buildings where energy works would unacceptably alter them, temporary buildings (≤2 years), low-demand industrial/defence/agricultural buildings, detached buildings under 50 m² useful floor area, and buildings bought for demolition or major renovation (art. 3.2 RD 390/2021).
Spanish vocabulary
disciplina urbanística
urban planning discipline
infracción muy grave / grave / leve
very serious / serious / minor infringement
restablecimiento de la legalidad
restoration of (urban planning) legality
demolición
demolition
non bis in idem
prohibition on double jeopardy
reincidencia
recidivism
prescripción
statute of limitations
fuera de ordenación
non-conformity with planning
Certificado de Eficiencia Energética (CEE)
Energy Performance Certificate
pago voluntario con reducción
voluntary payment with reduction
multa coercitiva
coercive fine
Key citations
--
Tema 45
The Public Domain (Módulo 34)
Key concepts
Public domain (demanio) = public ownership + allocation to general use/public service (or constitutional/legal declaration) — art. 132 CE names maritime-terrestrial zone, beaches, territorial sea, exclusive economic zone, continental shelf. Governed by Law 33/2003 (LPAP).
Three defining features (notas demaniales): inalienable, imprescriptible, non-attachable — lost only via deallocation (desafectación), converting it to patrimonial property (alienable/prescriptible/attachable).
Natural demanio (sea, rivers, beaches) vs. artificial/allocated demanio (roads, public buildings, parks).
Uses: general common use (free, no title needed — walking, swimming), special common use (authorization/fee — terrace, driving, fishing license), exclusive use via authorization (precarious, revocable, no permanent works — a market stall) or concession (stable, fixed term, permanent works — a kiosk with foundations, max. 75 years including extensions, art. 93.3 LPAP).
Water (RDLeg. 1/2001): riverbanks are public hydraulic domain; easement zone 5m (public passage; as a rule no construction there — buildings only in very justified cases, art. 7.3 RDPH); police zone 100m (constructions and substantial alterations need the water authority's authorization, art. 9 RDPH; in the preferential-flow zone on land that was rural on 30 December 2016, new buildings and extensions of footprint or volume are not permitted, art. 9 bis RDPH). In Andalusia's Mediterranean basins (e.g. Málaga province), the water authority is the Junta de Andalucía (Ley 9/2010, de Aguas de Andalucía). Concessions max. 75 years, priority: population supply > agriculture > industry.
Forests (Law 43/2003): CMUP-catalogued forests are demanial; neighborhood common forests (montes vecinales en mano común) are imprescriptible/inalienable communal property.
Mining (Law 22/1973): 4 sections — A (low-value resources such as aggregates and building stone; simple authorization), B (mineral and thermal waters, underground structures, deposits formed by mining operations), C (all other minerals, e.g. metallic ores; concession for 30 years, extendable up to 90), D (coal, radioactive minerals, geothermal resources, bituminous rocks — added by Law 54/1980). Liquid and gaseous hydrocarbons (oil/gas) are outside the Mining Act altogether (art. 1.2).
Coastal Act (Law 22/1988, reformed by Law 2/2013) — THE high-yield exam topic: maritime-terrestrial public domain + three easements:
Protection easement: 100m (can be extended to 200m; on river margins only as far as the tide is felt, it can be reduced to a minimum of 20m — art. 23 Coastal Law; inland rivers fall under the Water Law only; on land already classified as urban when the Coastal Law came into force in 1988 — common for older first-line plots on the Costa del Sol — the protection easement is only 20m, with existing uses and buildings respected (DT 3ª.3 Coastal Law)) — NO residential buildings, transport routes, or aggregate extraction (Council of Ministers can exempt for public utility).
Transit easement: 6m (up to 20m) — must stay clear for pedestrian/rescue passage.
Access easement: pedestrian access points every 200m, vehicular every 500m, in urban/developable areas.
Concessions on the maritime-terrestrial domain: max. 75 years, extinguished by expiry/forfeiture/buy-back/revocation/genuine sea-encroachment risk.
Roads Act (Law 37/2015, State road network only — art. 1; regional and provincial roads follow their own laws) — four zones measured from the roadbed edge: public domain zone (8m motorways / 3m conventional, works only for public-service necessity), easement zone (25m / 8m, authorization required), affected zone (100m / 50m, authorization + no-volume-increase repairs allowed), building restriction zone (measured from the carriageway: 50m / 25m, total ban on new construction).
VPO (officially protected housing): regulated jointly by the State Housing Plan (currently RD 326/2026, the 2026–2030 State Housing Plan, in force since 24 April 2026, replacing the 2022–2025 plan of RD 42/2022; homes funded under it must carry permanent protection, DA 8ª) and full regional competence — no uniform national VPO regime. Types: special-regime, general-regime, concerted/price-capped, protected accommodation, scaled by beneficiary income (multiples of IPREM). Provisional qualification (project approved, works can start) → final qualification (only then sellable/leasable as VPO). In Andalusia (Ley 5/2025, in force 24 January 2026) the protection period is set per programme and stated in the qualification (permanent for publicly funded public-stock homes, art. 57, and for homes funded under the 2026–2030 State Plan); every sale needs prior authorization from the Junta's housing department or it is void and cannot be registered (arts. 75, 76.5); the Junta and the town hall hold first refusal and redemption on second and later sales (art. 83); the old 10-year ban on selling survives only for homes finally qualified before that date (DT 1ª); leaving protection early requires repaying the aid and is barred for private developments (art. 85).
Law 12/2023 (Right to Housing Act) added stressed residential market areas (ZMRT): rent-price caps only once the region declares a zone (voluntary; 3 years, extendable yearly) where housing cost exceeds 30% of average household income or prices rose at least 3 percentage points above the regional CPI over 5 years; Andalusia has declared none (as of November 2026), so no ZMRT cap applies in Málaga; the large-holder threshold (normally more than 10 residential properties or over 1,500 m²) can be lowered to 5 or more properties within a ZMRT, but only where the region justifies it in the declaration (art. 3.k).
Three classes of tributo (art. 2.2 LGT): tasas (fee for a public service/use of public property), contribuciones especiales (levy on a benefit from public works), impuestos (levied without consideration on ability-to-pay events — IRPF, VAT, ISD). API-relevant: building permits/first-occupancy licenses are tasas; capital gains tax on a sale is an impuesto.
Hecho imponible (taxable event, art. 20 LGT) triggers the obligation; devengo (art. 21 LGT) is the moment it's deemed to occur. No sujeción = facts never fit the taxable event; exención (art. 22 LGT) = taxable event occurs but law excuses payment.
Sujeto pasivo = contribuyente (who realizes the taxable event) or sustituto (who pays in their place by law, e.g., the buyer from a non-resident seller in the plusvalía, art. 106.2 TRLRHL; withholding agents are a separate category, art. 35.2 LGT). Responsables (arts. 41-43 LGT) are third parties liable alongside the debtor — solidarios (Administration can pursue directly) or subsidiarios (only after principal debtor declared insolvent; default rule is subsidiary unless law says otherwise).
Cadastral reference value (valor de referencia, introduced by Law 11/2021, in force since 1-1-2022) is now the taxable-amount floor for ITP and ISD on real property transfers — if declared price is higher, the higher figure applies; challengeable only via self-assessment correction or appeal, with a binding report from the Directorate-General of the Cadastre.
Extinguishment of tax debt (art. 59 LGT): payment, prescripción (limitation, 4 years — art. 66), compensación (set-off), condonación (waiver, only by law), insolvency write-off.
Enforcement-period surcharges (art. 28 LGT): 5% (paid before providencia de apremio), 10% (paid within the enforcement-order deadline), 20% + late interest (all other cases).
Infringements classified minor / serious / very serious (art. 183 LGT) based on concealment and amount (€3,000 threshold) and use of fraudulent means; penalty reductions (art. 188 LGT): 65% for an agreed assessment (acta con acuerdo), 30% for conformity; any other penalty, after the conformity cut if there is one, is reduced by a further 40% if it is paid within the voluntary period and neither it nor the assessment is appealed (never for an acta con acuerdo).
Administrative review of State and regional tax acts: recurso de reposición (1 month, optional, before same body) → economic-administrative claim (1 month) before the regional TEAR, final when the amount in dispute is ≤ €150,000 (€1,800,000 for challenges to tax bases or valuations); above that, or when the amount is indeterminate, its decision can be appealed (recurso de alzada) to the TEAC, which also hears claims against acts of central bodies directly (arts. 226, 229, 235 LGT; art. 36 RGRVA). Local tax assessments (IBI, plusvalía) have no TEAR stage: reposición within 1 month before the local body that issued them is compulsory, then the courts (art. 14.2 TRLRHL); large cities under Title X LBRL have their own economic-administrative body instead, with reposición optional (art. 137 LBRL).
Spanish vocabulary
tributo
tax (generic term)
tasa
fee (for public service/use)
contribución especial
special assessment
impuesto
tax (proper)
hecho imponible
taxable event
devengo
chargeable event / accrual moment
no sujeción
non-liability (outside taxable event)
exención
exemption
sujeto pasivo
taxable person
contribuyente
taxpayer
sustituto del contribuyente
substitute taxpayer
responsable solidario / subsidiario
jointly-and-severally / subsidiarily liable party
base imponible / liquidable
taxable amount / assessable amount
cuota íntegra / líquida / diferencial
gross / net / differential tax liability
prescripción
limitation period
providencia de apremio
enforcement order
valor de referencia
cadastral reference value
Key citations
--
Tema 2
Transfer Tax and Stamp Duty (ITP-AJD) — Full Consolidated Law (RDLeg. 1/1993)
Key concepts
Structure: Preliminary Title (nature) → Title I: Property Transfers (TPO), arts. 7-18 → Title II: Corporate Transactions (OS), arts. 19-26 → Title III: Stamp Duty (AJD), arts. 27-44 → Title IV: Common provisions (exemptions, art. 45; valuation checks; formalities).
Art. 1.2: the same act can never be charged under both TPO and OS simultaneously.
Art. 7 (TPO taxable event): onerous inter-vivos transfers of assets/rights; creation of rights in rem, loans, guarantees, leases, pensions, administrative concessions; excesos de adjudicación declared in partitions, except where an indivisible asset is allotted to one party who compensates the others (arts. 821, 829, 1056, 1062 CC); in inheritances, also any allotment whose checked value exceeds the heir's entitled share by more than 50%; expedientes de dominio/notarial certificates of notoriety used to substitute title.
Art. 7.5 / Art. 18: transfers by business owners/professionals in the course of business subject to VAT are excluded from TPO — except real property supplies/leases that are VAT-exempt (these fall back to TPO unless the VAT exemption is waived).
Art. 10 (taxable amount): market value of the asset/right transferred; for real property, may not be lower than the cadastral reference value. Only encumbrances reducing asset value are deductible — debts (even mortgage-secured) are not.
Art. 11 (state default rates, apply only if the Autonomous Community hasn't set its own): 6% real property transfers/rights in rem (except security rights), but Andalusia has set 7% (Law 5/2021, art. 41), or 6% / 3.5% (buyer under 35) for a habitual home worth up to €150,000 (art. 43); 4% movable property/livestock, 1% security rights in rem (mortgages, pledges, antichresis) and loans.
Art. 26: Corporate Transactions rate is a flat 1% (though most OS transactions are now exempt per RDL 13/2010: incorporation, capital increases and partner contributions, art. 45.I.B.11, making OS largely residual).
Art. 29: AJD taxpayer is normally the acquirer, except on mortgage-loan deeds, where the taxpayer is the lender/bank (since RDL 17/2018). Art. 31.2: default AJD graduated rate (subsidiary, if no CCAA rate) is 0.5%; Andalusia has set 1.2% (Law 5/2021, art. 49), or 1% / 0.3% (buyer under 35) for a habitual home worth up to €150,000 (art. 50).
Art. 45 exemptions (Title IV) most relevant to real estate: State/public entities, Catholic Church; VPO (subsidized housing) — land transfers, construction-related deeds, first transfer, and mortgage loans for its acquisition, all exempt (provisional for land and construction deeds: lapses if the provisional VPO qualification is not obtained within 3 years, or 4 for land); marital-community contributions/dissolution adjudications; SOCIMI capital formation/increases exempt from OS + 95% AJD/TPO reduction on rental-housing acquisitions; mortgage-cancellation deeds exempt from AJD; habitual-residence leases exempt.
Spanish vocabulary
transmisiones patrimoniales onerosas (TPO)
onerous transfer of assets
operaciones societarias (OS)
corporate transactions
actos jurídicos documentados (AJD)
stamp duty
exceso de adjudicación
declared excess allotment
expediente de dominio
title-clearing proceedings
valor de referencia
cadastral reference value
usufructo temporal / vitalicio
temporary / life usufruct
nuda propiedad
bare ownership
concesión administrativa
administrative concession
cuota gradual
graduated (percentage) duty
vivienda de protección oficial (VPO)
officially protected/subsidized housing
primera copia (de escritura)
first (notarial) copy of a deed
Key citations
--
Tema 3
Value Added Tax (VAT / IVA) — Full Consolidated Law (Law 37/1992, LIVA)
Key concepts
Art. 4 (taxable event): supplies of goods/services by businesspersons or professionals for consideration, in the course of business. Art. 4.Four: VAT-taxed transactions are excluded from TPO, except real property supplies/leases (and rights in rem over them) that are VAT-exempt — these fall to TPO unless the exemption is waived.
Art. 5 (businessperson/professional): explicitly includes property lessors (letra c) and anyone developing land or promoting/constructing/refurbishing buildings for sale, even occasionally (letra d) — this is why a private seller of a resale home is normally not a VAT taxpayer but a developer always is.
Art. 6 ("building"/edificación): permanent constructions capable of independent use; explicitly excludes urbanization works (roads, water/electricity networks), ancillary agricultural constructions, and fixtures.
Art. 7.1 (non-subject): transfer of a going concern (autonomous economic unit of assets capable of carrying on the business) is outside VAT scope — a structuring tool distinct from a "mere assignment of goods", but any real property in it then pays TPO (art. 7.5 TRITPAJD).
Art. 20.One.20: rustic/non-buildable land is exempt; exceptions include land undergoing urbanization and land with buildings under construction transferred together.
Art. 20.One.22 (the central real-estate exemption): second and subsequent supplies of buildings are VAT-exempt. "First supply" = made by the developer on newly-built/renovated property; a later sale by the developer after 2+ years of continuous use by the owner (or usufructuary/lessee without purchase option) is treated as a second supply too, unless the buyer is the person who used it in those two years. Waivable (art. 20.Two) when the acquirer is a business owner with a total or partial right to deduct (or who expects to use the property in deductible activities) — then VAT applies instead of ITP: 21%, or 10% if the building is a dwelling (art. 91.One.1.7º).
Art. 20.One.23: leases of land (except parking/storage/advertising uses) and of dwellings (except hotel-service leases, subletting, furnished-with-services leases; from 1 December 2026 also furnished lets of 30 nights or less to the same tenant unless in the landlord's own home, taxed at 10% (art. 91.One.2.2º) — RDL 29/2026, convalidated by Congress, BOE 13 Nov 2026) are VAT-exempt — these fall to ITP-exemption instead (leases of a permanent home are exempt from ITP since March 2019 — art. 45.I.B.26 TRITPAJD, added by RDL 7/2019).
Rates: Art. 90 general rate 21%. Art. 91.One.1.7ª: reduced 10% on first supply of dwellings (incl. up to 2 garage spaces + annexes, excludes business premises and to-be-demolished buildings) and (91.One.3.1ª) developer-contractor construction/rehab contracts where ≥50% of area is residential; also 10% on renovation/repair works on private homes >2 years old (materials ≤40% of base; from 1 December 2026 also for homes let as a habitual residence, whoever the landlord, and in all cases only if paid by card, bank transfer, nominative cheque or deposit into the contractor's bank account — RDL 29/2026, convalidated by Congress, BOE 13 Nov 2026). Art. 91.Two.1.6ª: super-reduced 4% on first transfer by its developer of VPO under the special/public-promotion scheme and, from 1 December 2026, of protected homes under a permanent or indefinite qualification (RDL 29/2026).
Spanish vocabulary
hecho imponible
taxable event
entrega de bienes
supply of goods
prestación de servicios
supply of services
empresario o profesional
businessperson or professional
edificación
building (VAT concept)
primera entrega / segunda entrega
first supply / second (and subsequent) supply
renuncia a la exención
waiver of the exemption
terreno rústico / urbanizable
rustic land / buildable land
obra de rehabilitación
renovation/rehabilitation work
tipo general / reducido / superreducido
general / reduced / super-reduced rate
autoconsumo
self-supply
sujeto pasivo (inversión)
taxable person (reverse charge)
Key citations
--
Tema 4
ITP-AJD, VAT, Fees and Public Prices in Real Estate — Practical Guide
Key concepts
ITP-AJD is ceded to the Autonomous Communities — they set rates within state limits; managed and collected by the regional (not state) tax authority where the property is located.
Andalusia (Law 5/2021): TPO general 7% flat (no price bands), charged on the Catastro reference value or the price if higher (art. 10 TRITPAJD); reduced 6% (habitual residence, value ≤€150k), 3.5% (under-35s, victims of domestic violence or terrorism, or a home in a depopulated municipality, ≤€150k; disability of the buyer or a household member, or large family, ≤€250k), each cap tested on that same value for the home plus any garages and annexes bought with it; 2% (real estate businesses registered under IAE 833.2 or 861.1 buying a home worth ≤€500k, stating in the deed the intention to resell it, and reselling it by deed within 2 years in a sale that is itself subject to TPO, not VAT; the cap and the 2-year term since 1-1-2026, Law 8/2025; previously 5 years and no cap). AJD general 1.2% (down from 1.5%; it was TPO that ran 8-10% before 2021); reduced 1% (habitual residence ≤€150k), 0.3% (under-35 ≤€150k) and 0.1% (disability or large family ≤€250k); mortgage-cancellation deeds 0% (exempt).
Castile and León (DLeg. 1/2013 + Law 4/2024): TPO tiered 8% (≤€250k) / 10% (excess); reduced 4% for habitual residence (large family, disability ≥65%, all buyers under 36, protected housing; income cap €31,500); 0.01% for all-under-36 buyers of a first home in municipalities of ≤10,000 inhabitants (≤3,000 within 30 km of the provincial capital) worth <€150k — lowest ITP rate in Spain, anti-depopulation policy. AJD general 1.5% (among Spain's highest).
Mortgage AJD is paid by the lending bank, not the client, since RDL 17/2018 — client saving ≈1-1.5% of the loan amount.
ITP vs. VAT decision rule: who is selling? Developer/business owner acting in business → VAT (+ regional AJD). Private individual → ITP (no AJD). Business owner selling used property → VAT-exempt → ITP. The seller may waive the exemption only when the buyer is a business entitled to deduct the VAT (art. 20.Two LIVA); the buyer then self-assesses the VAT (21%, or 10% on a dwelling) under the reverse charge, + AJD. A private buyer of used property always pays ITP.
VAT rates recap for real estate: 21% general (premises, building plots, leases of premises; non-buildable land is VAT-exempt, so ITP applies); 10% new dwellings + ≤2 garages + annexes, and from 1-12-2026 furnished lets of ≤30 nights to the same tenant outside the landlord's own home; 4% on the developer's sale of VPO special/public-promotion homes and, from 1-12-2026, of permanently protected homes (RDL 29/2026).
Fees (tasas) vs. public prices (precios públicos): fees are compulsory public-law services that can't be privately provided (building permits, first-occupancy license, Land Registry fees); public prices are voluntary services also available privately, and are not taxes.
Filing: Form 600 for ITP/AJD, filed with the regional tax authority. State default deadline 30 business days from the deed (art. 102 RITPAJD), unless the region sets its own; 2 months in Andalusia (since 2022).
Spanish vocabulary
impuesto cedido
tax ceded to the region
tasa / precio público
fee / public price
nota simple (registral)
simple registry note
licencia de primera ocupación
first-occupancy license
cédula de habitabilidad
habitability certificate
cuota gradual
graduated (percentage) duty
Modelo 600
Form 600 (ITP/AJD self-assessment)
exceso de adjudicación
excess allotment
ICIO
Tax on Construction, Installations and Works
IIVTNU / plusvalía municipal
municipal capital gains tax
Key citations
--
Tema 5
Local Treasuries Law (TRLRHL, RDLeg. 2/2004) — Full Consolidated Law
Key concepts
Art. 59: municipal taxes are compulsory — IBI, IAE, IVTM — and voluntary (must be established by bylaw) — ICIO, IIVTNU.
IBI (arts. 60-77): taxable event is holding one of four rights over real property, in strict order of precedence (art. 61) — 1st administrative concession, 2nd surface right (superficie), 3rd usufruct, 4th full ownership (residual). Art. 62 exemptions: compulsory for State/regional/local public property tied to defense/education/prisons, Church property, Red Cross; on request for concerted schools and individually declared historic monuments (BIC); by bylaw for low-value property (art. 62.4); VPO gets a 50% rebate, not an exemption, for the three tax periods after definitive qualification, on request; after that the town hall may grant up to 50% by bylaw (art. 73.2). Art. 72 rates: urban 0.4%-1.10% (up to 1.30% for special-characteristics property or large-city surcharge); rural 0.3%-0.9%. Vacant-residential-property surcharge can reach up to 100% of the net liability where vacancy exceeds 3 years and the owner holds 4+ residential properties, plus an additional 50 percentage points for multi-property holders with several vacant units in the same municipality — a materially stricter regime than the flat "up to 50%" figure often cited in older summaries. From IBI 2027 (RDL 29/2026, in force 8 Oct 2026, convalidated by Congress 12 Nov 2026, art. 72.4 bis-ter), in declared stressed-market municipalities the town hall may levy up to 50% on any home vacant over 2 years, without the 4-property condition; for owners of 4+ homes up to 100%, plus up to 50 more points after 3 years of vacancy, and a new surcharge on tourist-let homes there can reach 50% (100% for owners of 2+ such homes, 150% for 4+).
IAE (arts. 78-91): taxable event is the mere exercise of a business/professional/artistic activity. The Law 51/2002 SME exemption removes almost all revenue effect: natural persons always exempt; legal persons exempt if net turnover (INCN) < €1,000,000 in the second prior year; new activities exempt for their first two tax periods.
ICIO (arts. 100-103): taxable event is any construction/installation/works requiring a building permit (whether or not obtained) or a declaración responsable / comunicación previa, where the control belongs to the town hall (art. 100.1). Taxable amount = real/effective material-execution cost only (excludes VAT, tasas and public prices, professional fees, contractor profit — art. 102.1). Rate capped at 4%, set by each municipality (most large cities: 2.5%-4%).
IIVTNU / plusvalía municipal (arts. 104-110): taxes the increase in urban-land value made evident on transfer. Art. 104.3/104.5: non-liability for marital-community contributions, certain divorce-related transfers, and — critically — any transfer where no real increase in value is proven (post-2021 reform). Art. 105 exemptions: dación en pago of habitual residence to cancel mortgage debt, historic-heritage properties with owner-funded conservation works, State/Church/Red Cross. Art. 107: dual calculation method — objective (cadastral land value × legally-capped coefficient by generation period, max 20 years, annually updated by law) or, if requested and lower, the real gain method (actual transfer value minus acquisition value, proportional to land's share of cadastral value). Art. 108: rate capped at 30% per municipality; up to 95% optional relief for inheritance transfers to descendants/spouse/ascendants. Art. 109-110: filing deadlines 30 business days (inter vivos) / 6 months, extendable to 1 year (mortis causa).
Spanish vocabulary
hacienda local
local treasury
concesión administrativa
administrative concession
derecho de superficie
surface right
valor catastral
cadastral value
recargo por vivienda vacía
vacant-property surcharge
coste real y efectivo
real and effective cost
plusvalía municipal
municipal capital gains tax (IIVTNU)
no sujeción
non-liability
bonificación
tax relief / rebate
dación en pago
payment in kind (debt settlement with the asset)
generación del incremento
generation period of the increase (in value)
Key citations
--
Tema 6
Local Real Estate Taxes — IBI, IAE, ICIO, IIVTNU Practical Guide
Key concepts
Five local taxes touch real estate: IBI (ownership), IAE (business activity, incl. real estate agencies), ICIO (works), IIVTNU/plusvalía (transfer gain), plus IVTM (vehicles, non-RE but relevant to rustic properties).
IBI becomes chargeable 1 January; the owner on that date owes the full-year tax, though buyer/seller commonly agree contractually to apportion by days of ownership (endorsed by STS 1463/2016) — the API should always include an apportionment clause in earnest-money contracts.
IBI relief highlights: VPO: 50% for the 3 tax years after the final VPO qualification, mandatory when the owner applies (art. 73.2 TRLRHL), and the bylaw may extend it afterwards; large families up to 90% (optional, bylaw, art. 74.4); solar or ambient-energy installations up to 50% (optional; duration and conditions set by the bylaw, art. 74.5).
IAE: real estate agencies fall under tariff group 834 (services relating to real property; 831 is financial auxiliaries), and a collegiate API working as a professional under group 721 of Section 2; developers under heading 833. Natural persons always exempt; companies exempt if turnover <€1,000,000 — in practice almost no small/medium agency pays.
ICIO: rate ≤4%, typical big-city range 2.5%-4% (Madrid 3.75% for works begun from 2024, 4% before; Barcelona 4%; Seville 3.22%); taxable amount excludes VAT, municipal fees (tasas), technical fees and contractor profit; ICIO is also due on works done under a declaración responsable — a cost buyers of renovation projects frequently underbudget.
IIVTNU reform history: STC 182/2021 declared the old objective, mandatory cadastral-value×years formula (arts. 107.1 ¶2, 107.2.a, 107.4) void outright, not only in no-gain cases (that was STC 59/2017), with no refunds for situations consolidated by 26-10-2021 (final rulings, unchallenged assessments, self-assessments with no rectification requested); RDL 26/2021 introduced the current dual-method system (objective vs. real, taxpayer picks the lower); coefficient maxima are to be updated annually by a rule with the rank of law (RDL 16/2025's 2026 update applied only 1–27 Jan 2026, before Congress derogated it; the RDL 8/2023 maxima apply until 30-11-2026; RDL 29/2026, convalidated on 12-11-2026, sets new maxima from 1-12-2026, and these replace any higher bylaw coefficient until the bylaw is amended). If sale price < acquisition price, no taxable event arises at all — the taxpayer must declare the transfer and provide both deeds as proof (art. 104.5: the land share of each price is compared, taking the deed or checked value, whichever is higher, without expenses or taxes).
Who pays IIVTNU: seller on transfers for consideration (30 business days to file), but if the seller is a non-resident individual the buyer pays it as substitute taxpayer (art. 106.2); acquirer on gratuitous transfers (inheritance: 6 months, extendable to 1 year; donation: 30 business days).
City-level IIVTNU rates vary widely within the 30% legal cap (e.g. Málaga 29%, Seville 26.53%, Valladolid 21.76%, Soria 18%); bylaws may grant up to 95% relief on inheritances by descendants, spouses and ascendants, never 100% (art. 108.4). Málaga: 95% down to 25% by cadastral value for cohabiting heirs of the deceased's main home, 37.5% for non-cohabiting heirs up to €150,000; Soria: 25% on the main home.
API checklist per transaction type: resale (verify IBI current, calculate both plusvalía methods, apportionment clause), new-build (inform buyer of post-deed annual IBI), renovation (budget ICIO), inheritance/donation (deadline + relief check).
Spanish vocabulary
plusvalía municipal
municipal capital gains tax
valor catastral
cadastral value
coeficiente
coefficient (IIVTNU multiplier)
método objetivo / método real
objective method / real (actual-gain) method
bonificación por herencia
inheritance tax relief
recargo
surcharge
licencia de obra mayor / menor
major / minor building permit
apertura de establecimiento
opening of a business establishment
coste de ejecución material (CEM)
material-execution cost
Key citations
--
Tema 7
Real Estate Taxation under Personal Income Tax (IRPF) and Corporate Income Tax (IS)
Key concepts
Rendimientos de capital inmobiliario (art. 22-24 LIRPF): rental gross income minus deductible expenses. Interest + repair/maintenance expenses are jointly capped at the property's gross income (excess carried forward 4 years); depreciation is 3% on the higher of acquisition cost or cadastral value, excluding land value — often forgotten by owners, yet mandatory (it reduces acquisition value for a future capital gain even if never claimed). IBI, insurance, admin/management fees, and owners'-association fees are fully deductible.
Lease reductions (art. 23.2 LIRPF, habitual-residence leases only) depend on the contract date. Signed before 26-5-2023: flat 60%. Signed 26-5-2023 to 1-12-2026 (Law 12/2023): 90% (new contract in a stressed-market area with rent cut >5% vs. the previous one; Andalusia has declared no stressed area so far, and none appears on the State's lists up to Q3 2026, so in Málaga this and the other stressed-area tiers do not apply), 70% (first-time letting in a stressed area and tenant aged 18-35, both required; or letting to a public body/non-profit for social rent), 60% (refurbishment finished within the prior 2 years), 50% (default). Signed after 1-12-2026 (RDL 29/2026, convalidated by Congress on 12-11-2026): no reduction for market lettings by a gran tenedor; re-letting with rent cut >5%: 100% (same tenant after the 5-year term, or rent below the reference-price index) / 95% (stressed area + tenant 18-35) / 90% (stressed area) / 85% (tenant 18-35) / 70% (other); rent not raised: 50%; rent raised: 40% (≤5%) down to 15% (>20%); first letting: 100% (rent below the index), 95%/90%/85% as above, 50% (rent at or above the index); 70% social letting; 60% refurbishment; 80% during tacit extension if the rent is within the index and the landlord is not a gran tenedor (by DT 38ª this also applies to contracts of any date whose 5-year minimum term ends after 1-12-2026).
Imputation of income (art. 85 LIRPF) for owned-but-not-let second homes: 2% of cadastral value (or 1.1% if the municipality's cadastral values were revised in a general valuation within the last 10 years, a window that DA 55ª LIRPF widens for 2023-2026 to any revision in force since 1-1-2012); from 2027 (RDL 29/2026, convalidated by Congress on 12-11-2026) a progressive scale on the sum of the owner's cadastral values: 1.1% up to €100,000, 1.5% to €500,000, 2% to €1,000,000, 3% above — a frequently-overlooked obligation for holiday/second-home owners.
Capital gains (arts. 33-38 LIRPF): transfer value minus acquisition value; depreciation is always subtracted from acquisition value, deducted or not. Taxed on the progressive savings base: 19% (≤€6,000), 21% (€6,000-50,000), 23% (€50,000-200,000), 27% (€200,000-300,000), 30% (>€300,000) — 2025 scale.
Key exemptions: reinvestment in a new habitual residence within 2 years (art. 38.1, partial if reinvestment is partial — confirmed by TEAC 31-3-2025 as a taxpayer right, correctable up to 4 years later); 100% exemption when a seller over 65 or in severe/great dependency sells their habitual residence (art. 33.4.b; no reinvestment needed; the home keeps that status if they moved to a care home or a relative's home, art. 41 bis.3 RIRPF as amended by RDL 29/2026, convalidated by Congress on 12-11-2026); on any other asset an over-65 can exclude the gain only by putting the proceeds into a life annuity within 6 months (art. 38.3, max €240,000); exemption for dación en pago (or judicial/notarial mortgage foreclosure) of the habitual residence to cancel mortgage debt owed to a bank or professional lender, only if the owner has no other assets enough to pay the whole debt (art. 33.4.d).
Corporate Income Tax (IS, Law 27/2014): general rate 25% (art. 29.1 LIS). Smaller companies (Law 7/2024): turnover under €1M — 21%/22% (2025), 19%/21% (2026), 17%/20% from 2027, on the first €50,000 / the rest; other small companies (art. 101) — 24% (2025), 23% (2026), 22% (2027), 21% (2028), 20% from 2029. New companies carrying on an economic activity: 15% in the first 2 profitable years. These reduced rates do not apply to an entidad patrimonial (art. 29.1, art. 5.2) — and letting counts as an economic activity only if at least one full-time employee runs it (art. 5.1), so a letting company without staff usually pays 25%. No separate savings-rate treatment for gains — everything taxed together.
Special regime for residential-letting entities (arts. 48-49 LIS): 40% relief on the gross IS liability for qualifying rental income (85% until 2021; cut to 40% for tax periods from 1 January 2022 by Law 22/2021, art. 61.4) → at the 25% rate, an effective 15%; requires ≥8 homes let/offered, minimum 3-year holding per unit, separate accounting, election notified to AEAT.
SOCIMIs (Law 11/2009): 0% IS rate, but a special levy on undistributed profits that were not taxed at the general rate: 15%, or 25% where they come from residential letting of any kind including tourist lets, reducible for mainly-affordable portfolios (RDL 29/2026, convalidated by Congress on 12-11-2026, tax periods open on 8-10-2026); must distribute 100% of dividends received, ≥50% of gains on disposals (rest reinvested within 3 years) and ≥80% of other profits (art. 6).
IBI deductibility rule: fully deductible against rental income if let; not deductible if not let (only imputation of income applies instead).
Spanish vocabulary
rendimientos de capital inmobiliario
income from real property capital
gastos deducibles
deductible expenses
amortización
depreciation
imputación de rentas inmobiliarias
imputation of real estate income
ganancia / pérdida patrimonial
capital gain / loss
valor de adquisición / transmisión
acquisition value / transfer value
base del ahorro
savings taxable base
exención por reinversión
reinvestment exemption
dación en pago
payment in kind (debt settlement with the asset)
SOCIMI
Listed Real Estate Investment Company
autoliquidación
self-assessment
Módulo 5
Actividad Profesional y Deontología
Tema 39
Professional Associations (Colegios Profesionales) and Licensing
Key concepts
Colegios Profesionales are Corporations under Public Law (Law 2/1974) — dual nature: private/associative basis + delegated public functions. Art. 36 Constitution mandates democratic internal structure.
Association membership (colegiación) for API is voluntary, not mandatory — real estate intermediation was liberalized (RD-ley 4/2000, art. 3 Law 10/2003): under state law anyone can intermediate without a title/membership, subject to regional consumer-protection rules (in Andalusia, Housing Act 5/2025, in force since 24 Jan 2026, arts. 49–53, requires habitual paid housing intermediaries to register in a regional agents' registry, with a qualification, 100 h of training and insurance or a guarantee; the registry is due by Jan 2028, and on 19 Oct 2026 the Junta agreed with the State to amend the law to drop the mandatory registration), but only colegiados get the "API" title, ethics oversight, and collective liability insurance.
Current governing rule: General Statutes RD 1294/2007, which repealed the Regulation approved by Decree 3248/1969 except its art. 1 (the list of the API's professional functions, still in force).
Three-tier structure: (1) Official Association (provincial/territorial) — processes membership, manages fianza, first-instance discipline; (2) Regional Council (where regional law provides) — Andalusia (Law 10/2003) uses regional criterion, Castile & León (Law 8/1997) uses provincial criterion; (3) General Council (Plenary + Executive Board) — national representation.
Admission requirements (art. 1 RD 1294/2007): the applicant must be of age, hold a university degree (graduado, licenciado, diplomado, ingeniero, arquitecto, ingeniero técnico or arquitecto técnico) or the official API title, and have no criminal record that disqualifies from practice (art. 1.1); then application + fianza (professional bond) + membership fee (art. 1.2). Governing Board decides within 1 month; silence = positive administrative approval.
Refusal grounds: insufficient/doubtful documentation, final disqualifying conviction, prior expulsion without rehabilitation, final disciplinary suspension.
The fianza (individual bond) guarantees liability toward the Association itself, not third parties — third-party liability is a matter for professional civil liability insurance; art. 11 RD 1294/2007 lets the General Council's Plenary take out a collective policy with minimum cover binding on all colegios (it "may agree" it, the Statutes do not impose it), which a colegio or the agent may improve.
Two membership statuses: practicing (colegiado ejerciente — can use "API" title) vs. non-practicing (no colegiado ejerciente) — can switch anytime.
Loss of member status (art. 7): death, permanent incapacity, final disqualifying conviction, final suspension/expulsion, voluntary resignation.
Article 13 Law 2/1974 (post-2009 Omnibus reform): the visado colegial is a rule for the colegios of technical professions (e.g. architects, engineers). A colegio visas a work only at the client's express request, or where the Government requires it by Royal Decree, which it may do only when the work directly affects people's physical safety and the visado is the most proportionate control. The visado checks the author's identity and professional qualification and the formal correctness of the documentation; it never covers fees or other contract terms, nor the technical control of the work (art. 13.2).
Article 14 Law 2/1974: Associations are prohibited from setting indicative fee scales — fees are freely agreed with the client (exception: tasación de costas).
Disciplinary regime (Title VI RD 1294/2007, arts. 37–46): infractions classified minor/serious/very serious; sanctions range from private reprimand + €30–300 fine (minor) to expulsion (very serious). Limitation periods: 6 months/2 years/3 years for the infraction; 1/2/3 years for the sanction.
Self-employed APIs fall under RETA (Special Social Security Regime for Self-Employed); employed APIs under the General Regime.
Ley 2/1974, de 13 de febrero, sobre Colegios Profesionales (basic state law, amended by Ley 25/2009 "Ley Ómnibus").
RD 1294/2007, de 28 de septiembre — current General Statutes of API Associations.
Art. 9.k) RD 1294/2007 — duty of loyalty and diligence toward clients (most-invoked duty in complaints).
--
Tema 40
API Professional Activity — Client Service, GDPR and AML Obligations
Key concepts
Article 12 Law 2/1974 requires each Association to run TWO services: (1) for members (internal corporate complaints) and (2) for consumers/users (external claims against members) — must accept electronic/remote submissions.
Article 10 Law 2/1974: Associations must maintain a single point of contact (website) for telematic registration/practice/withdrawal procedures and publish: register of members, register of professional companies, complaint channels, consumer-association contacts, code of ethics.
RD 515/1989 (consumer information in home sales/rentals) applies in Andalusia only as a fallback (disp. adic. 2ª); the regional rule is Decreto 218/2005. Whoever offers homes professionally, even as a mere intermediary, must give any enquirer a free Documento Informativo Abreviado (DIA) for a new home (arts. 6–7) and have one ready for a rental (free copy on request, handed over by signing at the latest, art. 11); on a resale, every consumer who visits a home through the agent gets an information sheet (ficha, art. 10) backed by a nota simple no older than three months. Two RD 515/1989 rules apply statewide: advertising has "contractual character" (ad data are enforceable even if absent from the contract, art. 3.2), and art. 10 bans clauses passing seller-borne title expenses to the buyer on a first sale.
Energy efficiency certificate (RD 390/2021, replacing RD 235/2013): mandatory in-person technician visit within 3 months before issuance; required for ANY new-tenant rental regardless of duration (old 4-month threshold eliminated); whoever advertises a property (agency/portal) is responsible for displaying the energy rating. Validity: 10 years generally, 5 years if rating is G (art. 13). The certificate has legal validity only once registered with the regional body (art. 6.6); a copy of the registered certificate and the label is annexed to a sale contract, the label to a rental contract (art. 17.2). Excluded (art. 3.2): officially protected buildings where improvement works would unacceptably alter their character, temporary buildings used for 2 years or less, low-demand industrial, defence and agricultural buildings, detached buildings under 50 m² of useful floor area, and buildings bought for demolition or for a major renovation (owner files a declaración responsable).
Data protection: GDPR (EU 2016/679, directly applicable since 25 May 2018) + LOPDGDD (Organic Law 3/2018) replaced the old LO 15/1999 security-levels model with proactive accountability (risk-based, controller self-assesses measures).
API is the data controller for client/owner/tenant data collected at the office. Obligations: identify the legal basis for each processing (consent, which must be free, specific, informed and unambiguous, is only one of them; data needed to perform the brokerage contract or to meet a legal duty such as AML checks need no consent: art. 6.1 GDPR), provide transparency info at collection, maintain Record of Processing Activities, apply risk-appropriate security measures, handle data-subject rights requests. DPO only mandatory in specific art. 34 LOPDGDD cases (not a typical solo API practice).
Video surveillance of the office (art. 22 LOPDGDD): visible sign required; images retained max 1 month (unless needed for proceedings).
Transfers outside EEA require an adequacy decision or standard contractual clauses.
Portals (Idealista, etc.) and cloud CRM providers act as data processors — requires a formal data processing agreement (art. 28 GDPR).
GDPR sanctions: up to €10M/2% turnover (first tier) or €20M/4% turnover (second tier), whichever higher; AEPD is the supervisory authority and may impose a reprimand (apercibimiento) instead of a fine (art. 58.2.b GDPR), typically for a minor infringement or where a fine would be a disproportionate burden on a natural person (recital 148).
Anti-money-laundering (AML): Law 10/2010 + RD 304/2014. API is an obliged entity (art. 2.1.l) for every sale it intermediates, regardless of payment method or price; for rentals only where the deal involves annual rent of €120,000 or more or monthly rent of €10,000 or more (art. 2.1.l, as amended by RD-ley 7/2021). By contrast, traders in goods are obliged only for cash payments above €10,000 by non-resident individuals (art. 38).
AML due diligence: identify client + beneficial owner (>25% ownership/control), understand transaction purpose, examine/report suspicious transactions to SEPBLAC, retain documentation minimum 10 years, appoint a representative before SEPBLAC (a sole trader is his own representative, art. 26 ter.1 Law 10/2010) and an internal control body, which is not required for agencies with fewer than 50 staff and turnover or balance sheet of €10M or less, where the representative does its job (art. 35.2 RD 304/2014); agencies under 10 staff and €2M are also exempt from the written internal-control procedures (art. 31.1 RD 304/2014).
Reporting to SEPBLAC is strictly confidential — tipping off the client is a separate infraction.
AML sanctions: minor, private reprimand or fine up to €60,000 (art. 58); serious, fine from €60,000 up to the greatest of 10% of annual turnover, the transaction value plus 50%, 3x the profit, or €5M (art. 57); very serious, fine from €150,000 up to the greatest of 10% of turnover, 2x the transaction value, 5x the profit, or €10M (art. 56); responsible directors may also be fined and removed and disqualified (up to 10 years for very serious).
Spanish vocabulary
responsable del tratamiento
data controller
encargado del tratamiento
data processor
consentimiento inequívoco
unambiguous consent
registro de actividades de tratamiento
record of processing activities
delegado de protección de datos (DPO)
data protection officer
AEPD
Spanish Data Protection Agency
SEPBLAC
Executive Service of the Commission for the Prevention of Money Laundering
LO 3/2018 (LOPDGDD) — arts. 22 (video surveillance), 34 (DPO), Título IX arts. 70–78 (sanctions).
Ley 10/2010, de 28 de abril, de prevención del blanqueo de capitales — art. 2.1.l) (API as obliged entity).
RD 390/2021 — energy efficiency certification procedure.
RD 515/1989 — consumer information in home sale/rental.
--
Tema 41
Consumer Protection Law (TRLGDCU)
Key concepts
Art. 51 Constitution mandates public authorities to protect consumer safety, health and economic interests; consumer protection is not an exclusive state competence — coexists with regional law (Andalusia has exclusive competence via its Statute of Autonomy; Castile & León has development/implementation competence).
Core rule: TRLGDCU (RDLeg. 1/2007), consolidating Ley 26/1984 + EU-derived rules. 4 Books: I general/sanctioning regime, II contracts, III defective-product liability, IV package travel.
Directive (EU) 2019/2161 "Omnibus Directive" renumbered/modernized the sanctioning chapter (old arts. 49–52 → new arts. 47–52) and massively raised fine ceilings.
Basic consumer rights (art. 8 TRLGDCU): health/safety protection, economic interest protection, compensation/redress, information/education, hearing/representation, protection via effective procedures. Rights are non-waivable (art. 10) — any advance waiver clause is void.
RD 515/1989 remains the specific state rule on housing sale/rental information (in Andalusia, Decreto 218/2005, with RD 515/1989 as fallback; see Tema 40) — advertising has contractual character even if not repeated in the final contract; keep brochures as evidence.
Right of withdrawal (distance/off-premises contracts, arts. 68+ TRLGDCU) does NOT apply to contracts to create, acquire or transfer real estate, nor to residential lettings (art. 93.e–f TRLGDCU). It does reach the agency's own service contract (e.g. a nota de encargo signed with a consumer at their home or at a distance): 14 calendar days, 30 after an unsolicited home visit (art. 102), lost once the service has been fully performed with the consumer's express prior consent (art. 103.a).
Unlawful advertising (Ley 34/1988): misleading, unfair, subliminal, or advertising that offends dignity or breaches sector rules. Ley 3/1991 (Unfair Competition, reformed by Ley 29/2009 transposing Directive 2005/29/EC) distinguishes misleading practices (action/omission) and aggressive practices.
Customer service department (art. 21 TRLGDCU): must log complaints with a reference/written acknowledgment; respond within max 15 days (art. 21.3, as amended by Ley 10/2025); in Andalusia a complaint on the official hoja de quejas y reclamaciones must be answered in writing within 10 working days (Decreto 82/2022, art. 12.1). If unresolved → ADR entity (Ley 7/2017) or Consumer Arbitration System (voluntary, binding, enforceable — RD 713/2024, in force since 13 Aug 2024, which repealed RD 231/2008).
Infraction catalogue (art. 47 TRLGDCU) is a "catch-all" — includes health risks, fraud/alteration, unfair pricing, labeling/advertising breaches, obstruction of inspection, unfair contract terms, discrimination, unfair commercial practices (incl. geo-blocking under EU Reg. 2018/302).
Sanction amounts (art. 49, post-Omnibus reform): minor €150–10,000; serious €10,001–100,000; very serious €100,001–1,000,000 (can be multiplied 2–8x the unlawful benefit obtained). Cross-border infractions under EU Reg. 2017/2394 can reach 4% of turnover or €2M.
Limitation periods (art. 52, state minimums under art. 46.11): minor 1yr/1yr; serious 3yr/3yr; very serious 5yr/5yr (infraction/sanction). In Andalusia infractions prescribe at 4 years (Ley 13/2003, art. 87), so minor/serious 4yr, very serious 5yr; sanctions stay 1/3/5.
Cease-and-desist actions (arts. 53–56) — no limitation period; can be brought by consumer bodies, associations, Public Prosecutor, or qualified EU entities.
Directiva (UE) 2019/2161 — Omnibus reform of sanctioning regime.
--
Tema 42
Customer Service, Client Relations, Communication, Personal Image, Direct Marketing
Key concepts
Service, not price/product, is the API's main competitive lever (properties are heterogeneous, prices are market-constrained). Formula: COMPREHENSIVE PRODUCT = essential product (property) + additional factors (paperwork, legal/tax advice, coordination).
Satisfaction = comparison of received vs. expected service: below expectation → dissatisfaction; meeting → satisfaction; exceeding → extra satisfaction/loyalty/referrals.
Satisfaction questionnaire should cover 4 dimensions: reliability, responsiveness, professionalism, empathy — scored on a 1–7 Likert scale; a result below 5 triggers an improvement protocol.
Client expectations stem from two sources: the company's own communication/promises, and the client's personal needs — API must manage both (don't over-promise; know the client).
Staff behavior standards: smile/eye contact, warm tone, active listening, using the client's name, respecting personal space (~1m), proactive help, demonstrated technical training.
Benchmarking = systematically studying competitors' best practices (visits as mystery client, reviewing brochures/digital presence/reviews) to adopt improvements before they become market standard.
Internal vs. external communication: internal (staff training, meetings, protocols) must be able to sustain what external communication (ads, portals, social media) promises to clients.
4 approaches to communication budget: fixed annual amount (not recommended), % of sales (not recommended — cuts budget when needed most), by planned objectives (best — links spend to measurable goals), competitive parity.
Personal image elements: punctuality, grooming, attire, handshake, facial expression/gaze (toward mouth/nose area, not direct eye contact, to avoid scrutiny feel), always initiate conversation, respect personal space.
Visit protocol has 4 phases: welcome (2 min) → guided tour (10–15 min, mention strengths AND known limitations) → free time (5 min, no pressure) → questions/closing (5–10 min, propose concrete next step).
Direct marketing = techniques seeking immediate, measurable response via direct dialogue. Success factors: competitive product first, right channel for the target profile, emotionally connecting creative.
Direct marketing channels: leafleting (0.5–2% response), catalogues, mailing (most cost-effective per contact; needs GDPR compliance and, by email, prior consent under art. 21 LSSI), telemarketing (since 29 June 2023 only with prior consent or another GDPR art. 6.1 legal basis, art. 66.1.b Ley 11/2022), interactive media (main lead-gen channel today). Before any campaign, check the Robinson exclusion lists unless the person consented (art. 23.4 LOPDGDD).
Digital marketing: >90% of buyers start online. Requires GDPR + LSSI (Ley 34/2002) compliance for commercial email/WhatsApp — prior express opt-in consent required (art. 21.1 LSSI), except for a client with a prior contract whose contact data were lawfully obtained, who may receive offers of the agency's own services similar to those contracted (art. 21.2); a one-off viewing or enquiry is not a contract. A simple, free opt-out at collection and in every message, and a compliant client database.
Spanish vocabulary
producto integral
comprehensive/integral product
encuesta de satisfacción
satisfaction survey
escala Likert
Likert scale
benchmarking
competitive benchmarking
comunicación interna / externa
internal / external communication
imagen personal
personal image
protocolo de visita
visit protocol
marketing directo
direct marketing
buzoneo
leafleting/mailbox distribution
mailing
direct-mail email campaign
telemarketing
telemarketing
opt-in / opt-out
opt-in / opt-out consent
LSSI
Law on Information Society Services and Electronic Commerce
Art. 83.5 GDPR — fines for unlawful marketing use of personal data: up to €20M or 4% of worldwide annual turnover, whichever is higher. Commercial email/WhatsApp sent without consent is also an LSSI offence fined by the AEPD (arts. 38, 39 and 43.1 LSSI: up to €30,000; €30,001–150,000 if mass or insistent).
--
Tema 43
Evaluating Customer Satisfaction, Managing Client Perception, Service Standards, Competitive Knowledge
Key concepts
Quality = delivering exactly what was promised; excellence = exceeding expectations (positive surprise) — the key differentiator between mediocre and reputation-building operators.
Net Promoter Score (NPS): single question "how likely to recommend 0–10"; promoters = 9–10, neutral = 7–8, detractors = 0–6. NPS = %promoters − %detractors. Above 50 = excellent in real estate. Personally contact detractors to try to convert them.
Perception principle: client decisions are driven by perceived reality, not objective reality — two agencies with identical listings/price can generate very different perceptions via presentation, response time, and treatment.
Market positioning = the mental image/position the brand occupies relative to competitors (not geography or market share) — goal: be the first agency the client thinks of.
Commodity vs. differentiated product: undifferentiated → client chooses on price alone; differentiated → API specializes (e.g., luxury, investment, foreign clients) and can command higher fees/loyalty.
Differentiation/preference strategy: pick a hard-to-copy attribute (speed, area expertise, client-profile specialization) and communicate it consistently across every touchpoint — inconsistent messaging destroys positioning even if each message is individually good.
Service standards must be defined, trained, and supervised — not left to individual goodwill. Core rules: never promise what can't be delivered, max response times (e.g. under 2 hours for WhatsApp/email), be helpful even without immediate benefit, offer unexpected extras (surprise effect).
Complaint-handling protocol (5 steps): listen without interrupting → acknowledge/empathize → investigate and propose a concrete, timed solution → follow up and log → review process if the same complaint recurs (signals a structural problem).
Competitive analysis dimensions: market supply, pricing strategy, service quality, digital positioning, market demand — accessible techniques: Google searches, in-person mystery shopping, client surveys ("why us / why not us"), Google Alerts, monthly logging/synthesis.
Merchandising = techniques presenting the product under the best physical/psychological conditions to boost sales at point of sale — applies to both the agency's shop window/office AND the property itself (home staging).
Home staging can sell properties 30–50% faster and closer to asking price; offering it as an included service is a strong competitive differentiator.
Communication channel selection matters: email (formal/written record, not urgent), phone (nuanced/real-time trust-building, no written record), WhatsApp Business (fast/informal, respect hours), newsletter (requires consent — GDPR/LSSI), video call (not a substitute for in-person property visits), social media (attraction channel, never handle complaints publicly), website (needs SEO/ads investment to generate leads, not passive).
Technology infrastructure: real estate CRM (Inmovilla, Witei, Salesforce), electronic signature (only a QUALIFIED electronic signature has the same legal effect as a handwritten one — eIDAS Regulation (EU) 910/2014, art. 25.2; other electronic signatures cannot be denied legal effect merely for being electronic, art. 25.1; Ley 6/2020 regulates electronic trust services in Spain), Verifactu billing-software rules (RD 1007/2023, based on art. 29.2.j LGT added by Ley 11/2021; compulsory from 1 January 2027 for corporate-tax payers and from 1 July 2027 for all other businesses, incl. the self-employed), which are separate from B2B electronic invoicing under Ley 18/2022 "Crea y Crece" art. 12, developed by RD 238/2026 and Orden HAC/1028/2026 (compulsory from 6 October 2027 for VAT turnover above €8M in the previous year, from 6 October 2028 for the rest), cookie compliance on websites (LSSI).
Ley 6/2020 — Spanish rules on electronic trust services.
Ley 18/2022 ("Crea y Crece"), art. 12 and final provision 8, developed by RD 238/2026 and Orden HAC/1028/2026 — B2B electronic invoicing (compulsory from 6 Oct 2027 above €8M turnover / 6 Oct 2028 for the rest)
RD 1007/2023 — Verifactu billing-software requirements (compulsory from 1 Jan 2027 / 1 Jul 2027).
LSSI (Ley 34/2002) — cookie compliance and unsolicited commercial communications.
Módulo 6
Valoraciones y Tasación
Summary
Expert Property Valuation for Tax Purposes
Key concepts
Expert valuation (tasación pericial) determines tax obligations and must balance fairness between taxpayer and tax administration.
Individualization of the asset is essential — no generalized valuations; each property assessed on its specific characteristics.
Appraiser's methodology must follow recognized standards of good practice: objective criteria, appropriate tools, transparency; appraiser must have adequate training/experience.
Valuation must address ALL relevant factors: location, size, state of repair, improvements — omitting a determining factor invites future challenges.
Internal visit is the general rule — reveals condition, material quality, unique features (adapted spaces, high-tech installations), and structural/maintenance problems not visible from outside.
If the internal visit is omitted, the appraiser must justify this in a reasoned, documented way in the report (e.g., owner refused access). Without solid justification, the appraisal can be judicially challenged and nullified.
Taxpayer right: tasación pericial contradictoria (contradictory expert appraisal) — taxpayer may request a second valuation by an appraiser of their own choosing to balance power with the administration, within the deadline for the first appeal against the assessment (filing it suspends enforcement of the assessment and the deadline to appeal it); once the administration's valuation is notified, the taxpayer has 10 days to name the appraiser, who then has 1 month to deliver a reasoned valuation, or the procedure ends and the administration's value stands (art. 161 RGAT); if the two values differ by no more than €120,000 and 10%, the taxpayer's appraisal becomes the base, otherwise a third expert is appointed by lot (art. 135 LGT); this right does not lower the required professional standards. Not for the reference value: where the ITP or ISD base on a property is the cadastral reference value (valor de referencia), there is no expert appraisal to attack; that value can only be challenged by appealing the assessment or asking to rectify the self-assessment, and the tax office decides on a binding report from the Dirección General del Catastro (art. 10.2–4 TRLITPAJD; art. 9.3–5 Ley 29/1987 ISD).
Taxpayer also has the right to clear, complete information on the valuation criteria used and to question discrepant aspects of the report.
Case law reinforces: consistent/transparent, non-arbitrary criteria (STS 39/2021) and mandatory internal visits (STS 280/2018).
Thorough documentation of the whole process (methodology, inspection notes) is the appraiser's defense in the event of a dispute.
Civil Code: Art. 333 — all appropriable things are movable or immovable. Art. 334 — exhaustive list of immovable property (land, buildings, attached trees/fixtures, machinery serving the building, mines/quarries while attached, administrative concessions and real rights over immovables, etc.). This classification drives the applicable legal regime (mortgage, registration, tax).
Market value (Order ECO 805/2003): price at which a property could be sold by private contract between a willing seller and independent buyer, publicly offered, orderly market, normal negotiation period — excludes taxes/marketing costs.
Appraisal value (VT): the value under Order ECO 805/2003 for a given property type, with legal effect within its scope. Value ≠ price ≠ income (income = periodic monetary benefit produced by the property).
Surface units: centiare = 1 m²; are = 100 m²; hectare = 10,000 m². Scale = ratio of drawing to real dimensions (natural 1:1, enlargement >1, reduction <1).
Land suitable for building (solar): in Andalusia (LISTA art. 13.3), an urban-land plot with at least access by paved urban roads, public lighting on the road it fronts, and drinking-water supply, sewage disposal and electricity with enough capacity for the intended use, plus any further services the planning requires. Planning parameters to check before purchase: edificabilidad (buildability, m² built/m² plot), ocupación (site coverage %), max height/floors, minimum setback (retranqueo), min plot size/frontage.
Order ECO/805/2003 — eleven mandatory valuation principles (breach can void the appraisal): Anticipation, Purpose, Highest-and-best-use, Probability, Proportionality, Prudence (lowest value when scenarios are equally probable — mandatory for mortgage-cover, insurer and pension-fund valuations, art. 3.1.f), Substitution (basis of comparison method), Temporality (reports expire), Transparency, Residual value (value of a factor = total value − value of other factors), Sustainability (where relevant, the environmental and climate risks the property is exposed to must be taken into account — added by Orden ECM/599/2025, in force 12 Aug 2025).
Report expiry under ECO/805/2003: 6 months from issue date (art. 62.4).
Types of valuation: free-market (comparison method, unregulated), cadastral (administrative, from land + construction cadastral value, cannot exceed market value), tax/municipal (real rights — usufruct, use/habitation, bare ownership, easements: art. 10.5 TRLITPAJD, art. 26 LISD). For ITP/AJD and ISD a property's base is its Catastro reference value (valor de referencia), or the declared value or agreed price if higher (art. 10.2 and 30.1 TRLITPAJD; art. 9.3 LISD).
Four valuation methods previewed here (detailed in later temas): Comparison (priority method, most objective), Income capitalization (Value = Net income / capitalization rate), Cost (Vi = Vs + Ve), Residual (Vs = Vi − Ve).
Worked example logic (comparison method): homogenize a sample of comparables to €/m², take the arithmetic mean of the homogenized prices, then multiply by the subject property's surface area to get its value (110 m² flat, mean 1,377 €/m² → 151,470 €).
Spanish vocabulary
bienes inmuebles
real/immovable property
Código Civil
Civil Code
valor de mercado
market value
valor de tasación (VT)
appraisal/valuation value
solar
buildable plot
edificabilidad
buildability
ocupación
site coverage
retranqueo
setback
valor catastral
cadastral value
usufructo
usufruct
nuda propiedad
bare ownership
servidumbre
easement
plusvalía municipal
municipal capital gains tax
Key citations
Order ECO/805/2003, of March 27 — mandatory standards for property valuation for mortgage guarantees, insurance provisions, and real estate investment/pension funds; eleven binding principles (the eleventh, sustainability, since 12 Aug 2025); art. 62.4 sets 6-month report validity.
Civil Code arts. 333 and 334 — classification of movable/immovable property.
Royal Legislative Decree 7/2015 (recast Land Act) + RD 1492/2011 (Valuation Regulation) — land regime valuations (expropriation).
Royal Legislative Decree 1/2004 (recast Real Estate Cadastre Act) + RD 1020/1993 — cadastral valuations.
--
Tema 45
The Comparison (Market) Method
Key concepts
Concept: obtains market value by analyzing the supply of similar properties (comparables/testigos) in the same area. Most objective/direct method; priority method for most properties and purposes. Not applicable where there is no sufficient/representative market.
Requirements to apply it: a representative market of comparables exists; sufficient data to identify and homogenize comparables; information on at least six comparable transactions or offers that reflect the current market (art. 21.1 ECO/805/2003); for mortgage valuations, also price data for the local market over at least the previous 2 years (art. 21.2).
5-step methodology: (1) establish the appraised property's value-relevant qualities/characteristics; (2) study the market of comparables; (3) select a representative sample; (4) homogenize prices; (5) assign the value.
Key comparison characteristics for urban property: location (same/similar neighborhood, socioeconomic level), use (residential/industrial/tertiary/tourist — never compare across uses), type (never compare across building types even within same use, e.g. villa vs. flat), plus age, surface area, construction quality, floor level/orientation, state of repair.
Asking prices must be corrected down to probable actual sale price (do not use raw asking prices — they overvalue); actual sale prices under 1 year old need no correction; older transactions need market-movement correction. Work in €/m² (an ECO/805 report may homogenize the unit or the total value, but must say which and why: art. 22.1.d) — never mix built vs. usable surface area within one sample; since 12 Aug 2025 the reference is the verified usable area, and any other surface needs an explicit justification (art. 71.6) and a coefficient for the different adopted-to-usable ratio of comparables and subject (art. 22.1.d).
Verification step: check currency/accuracy of data; discard/adjust outliers and non-market transactions (speculative, off-market, mistaken); deduct value of included extras (parking, storage) if the subject property lacks them.
Stratification filters the sample by use, type, location, age, quality. Elimination of non-comparables: individual elimination (drop comparables with a very different basic characteristic), extreme-value elimination (drop highest/lowest price), or deviation-from-mean elimination (drop those >10–15% from the mean).
Homogenization: for each comparable, apply a signed % adjustment per characteristic (location, age, surface, quality, floor, repair state) relative to the subject property; sum the percentages and apply to the comparable's price to get its homogenized value. Alternative scale: Much Better (−10 to −6%), Better (−5 to −3%), Equal (0/±2%), Worse (+3 to +5%), Much Worse (+6 to +10%).
Age homogenization: witness older than the subject → positive adjustment (increase its value to match); witness newer → negative adjustment. Surface area: smaller area → higher unit value (€/m²) — stratify by surface bracket.
Final value = arithmetic mean of homogenized €/m² prices × subject property surface area, net of marketing costs and any uncounted easements/restrictions.
Worked example logic (Albacete flat, 110 m², 2nd floor): (1) record subject's characteristics; (2) market study found ask-to-sold gap of ~12.5%, applied to all asking-price comparables; (3) verify data in a comparables table; (4) stratify by age (±20 yrs), surface (±20%); (5) eliminate 2 outliers (one far below mean/inferior quality, one far above mean/superior quality); (6) build homogenization table applying %-adjustments across 6 characteristics (location, age, surface, quality, floor, repair) to the 8 remaining comparables; (7) take the arithmetic mean of homogenized €/m² (1,450) × 110 m² = 159,500 €. Partial-ownership shares are then pro-rated (e.g., 25% share → value × 25%).
Spanish vocabulary
método de comparación / método de mercado
comparison/market method
testigos / comparables
comparables ("witnesses")
homogeneización
homogenization
estratificación de la muestra
sample stratification
precio de oferta
asking price
precio de venta
sale price
superficie construida
built surface area
superficie útil
usable surface area
valor unitario (€/m²)
unit value
entorno
surrounding environment
estado de conservación
state of repair
coeficiente de homogeneización
homogenization coefficient
Key citations
--
Tema 46
Cost or Replacement Method
Key concepts
Concept: values a property from its production costs. Uses the additive technique: Vi = Vs + Ve (total value = land value + building value). Land value (Vs) comes from the comparison or residual method; the cost method values only the building (Ve). Applicable to all buildings/building elements at any stage (project, under construction/rehabilitation, or completed).
Reproduction cost = cost to build an identical building today. Replacement cost = cost to build an equivalent-utility building today using current materials/techniques (more commonly used).
Gross/new replacement cost (CRB), course formula: Ve = Cc + Gp + Bp (construction cost under contract + developer's expenses + developer's profit). In an official appraisal under Order ECO/805/2003, the gross replacement value (VRB) is land value + contract construction cost + necessary expenses, and the developer's profit, financial and marketing costs are EXCLUDED (art. 18.4).
Cc = CEM + Gc + Bc — cost of material execution + contractor's overheads + contractor's industrial profit. Since Gc+Bc ≈ 20% of CEM: `Cc = 1.20 × CEM`.
Developer's expenses: `Gp ≈ 0.15 × (Vs + Cc)`.
Developer's profit: `Bp ≈ 0.20 × (Vs + Cc + Gp)`.
Combined: `Ve = 0.38 Vs + 1.38 Cc`, so total property value `Vi = 1.38 × (Vs + Cc)` — course formula including the developer's profit; an ECO/805 appraisal leaves Bp out and comes out lower.
Net/current replacement cost (CRN): CRB minus depreciation. D = depreciation (% of CRB), d = (1 − D) = depreciation coefficient. `CRN = CRB − D` or equivalently `CRN = CRB × d`.
Three types of depreciation: physical (age + state of repair), functional (obsolescence, poor adaptation to use — intrinsic, hard to value), economic (external causes reducing profitability — extrinsic, hard to value). CRN = CRB − (physical + functional depreciation).
Physical depreciation due to age — straight-line method (most common): `D = Age / Useful life`, d = 1 − D, applied to the building only: under Order ECO/805/2003 (art. 19.2.b) the age ÷ useful-life ratio multiplies the VRB excluding the land's market value. Max useful life per Order ECO 805/2003: residential 100 yrs, offices 75 yrs, commercial 50 yrs, industrial buildings and properties linked to an economic activity (hotels, hospitals, car parks, sports, teaching and care facilities, residences) 35 yrs.
Physical depreciation due to state of repair — cadastral correction coefficients: Normal = 1.00, Fair = 0.85, Poor = 0.50, Derelict = 0.00.
Income capitalization method (also covered in this tema): values a property by its income-generating capacity, based on the Principle of Anticipation. 4-step process: estimate cash flows → estimate reversion value → choose discount rate → apply formula.
Net annual income: `RN = RB − G` (gross income minus expenses). Typical expense ratios: dwellings/offices 20–30% of RB; commercial/parking/industrial 10% of RB. Assume min. 5% vacancy/non-payment.
Reversion value (value at end of income-generating life, i.e. land value at that point): `Vr = Vs × (1 + i)ⁿ` — ≤2%/year in constant terms is a course prudence guideline, not a legal cap: Order ECO/805/2003 (art. 31.1) takes the land value at the valuation date and adjusts it by a reasonable, duly justified gain or loss.
General present-value formula: VA = Σ[Ej/(1+i)^tj] − Σ[Sk/(1+i)^tk] (receipts discounted minus payments discounted).
Perpetual capitalization formula (property with unlimited economic life, constant income): `Value = Net income / Capitalization interest rate`. Applies to dwellings, offices, rural estates — not to short-life/operating properties. The 1999 Resolution's minimum rates (1st-home 4.5%, 2nd-home 7.5%, offices 5.5%, commercial 7.0%, industrial 9.0%, parking 6.0%, rural 4.0%) belong to the 1994 valuation Order, repealed by Order ECO/805/2003; today the nominal rate must reflect the investment's risk, be similar to the market's for comparable deals and be no lower than the average yield on State debt maturing in over 2 years (over 5 years for mortgage valuations), with the spread justified in the report (art. 32).
Valuation of real rights (also in this tema): a real right reduces an asset's value — asset value = total value − real right value.
Life usufruct: % = 89 − age of usufructuary (min 10%, max 70%).
Temporary usufruct: % = 2 × years of duration (max 70%).
Bare ownership = total value − usufruct value.
Use and habitation = 75% of the corresponding usufruct value. These four rules are the ITP and ISD tax rules (art. 10.5 TRLITPAJD; art. 26 Ley 29/1987); in an appraisal under Order ECO/805/2003 (art. 56) the usufruct is the actuarial present value of its cash flows, and use and habitation = usufruct ÷ 1.12.
Easements: value = (property value free of the easement) − (property value burdened by it); same subtraction logic applies to most other unregulated real rights/restrictions.
Spanish vocabulary
método del coste / de reposición
cost/replacement method
coste de reposición bruto (CRB)
gross replacement cost
coste de reposición neto (CRN)
net replacement cost
coste de ejecución material (CEM)
cost of material execution
gastos de promoción
developer's expenses
beneficio del promotor
developer's profit
depreciación física / funcional / económica
physical/functional/economic depreciation
método de capitalización de rentas
income capitalization method
tasa de capitalización
capitalization rate
valor de reversión
reversion value
derecho real
real right
usufructo vitalicio / temporal
life / temporary usufruct
nuda propiedad
bare ownership
derecho de tanteo y retracto
right of first refusal and redemption
Key citations
Order ECO/805/2003 — governs useful-life maxima for physical depreciation and applies to income capitalization for all income-producing property types and certain real rights.
Royal Legislative Decree 7/2015 (recast Land Act) — planning/expropriation valuation of rural land via income capitalization.
Recast Transfer Tax and Stamp Duty Act (ITP y AJD) — valuation of certain real rights.
Resolution of July 20, 1999 (Directorate-General of the Treasury) — historical minimum capitalization rates under the 1994 valuation Order, which Order ECO/805/2003 repealed; the current floor is art. 32 ECO/805/2003 (State-debt yield).
--
Tema 47
The Residual Method
Key concepts
Principle of residual value: the value of a production factor = total asset value − value of the other factors. Rearranging the cost method: Vi = Vs + Ve → `Vs = Vi − Ve` → `Vs = Vi − Cc − Gp − Bp`. Used to value buildable plots or buildings to be rehabilitated, especially when there are no direct land comparables but completed-property prices are known.
Relies on the other methods for its inputs: comparison method → sale value of the finished property (Vi); cost method → construction cost (Cc); income capitalization → sale value reference for income-producing property types.
Key terms: buildability = total m² that can be built on a plot; buildability coefficient = m² floor area / m² of plot; contributory value = land value ÷ total built/buildable m² (€/m² built); unit value = land value ÷ plot m² (€/m² of land, used for low-intensity land).
Two procedures: Dynamic (expected values, discounts cash flows over time) — mandatory for long horizons (>1 year), applies to land (built or not) and buildings at project/construction/rehabilitation stage. Static (current values, no time discounting, simpler) — applies to plots/rehabilitations startable soon, and already-built plots.
Dynamic residual formula: `F = Σ[Ej/(1+i)^tj] − Σ[Sk/(1+i)^tk]` (F = land value; Ej = receipts at time j; Sk = payments at time k; i = discount rate). Discount rate i = risk-free rate + risk premium; the rate is the average annual return an average developer would obtain WITHOUT external financing (art. 38.1 ECO/805/2003); the risk premium is raised in line with leverage, with justification, ONLY when the cash flows themselves include third-party financing (art. 38.4).
Static residual formula: `F = VM × (1 − b) − ΣCi` (VM = sale value of the finished property; b = developer's profit margin as a fraction; ΣCi = all costs/expenses excluding land). Common mistake: applying b to total cost instead of to VM — b is always applied to VM.
Worked example logic (dynamic — 8-flat housing plot): (1) estimate total sales revenue from comparison-method flat prices; (2) build the construction cost via CEM → Cc = 1.20×CEM; (3) lay out a cash-flow schedule by year (payments in years 1–2, receipt in year 3); (4) discount each flow to present value at the chosen rate (10%); (5) F = PV(receipts) − PV(payments) → land value ≈ 494,000 €. Sanity-check: developer's PV outlay vs. PV revenue should equal roughly what's paid for land.
Worked example logic (static — office plot): (1) VM = buildable m² × market €/m² (comparison method); (2) compute VM × (1 − b); (3) sum all costs (Cc + Gp) excluding land; (4) F = VM×(1−b) − ΣCi → land value = 214,800 €. Sanity-check: land + construction + expenses + profit should reconcile to VM.
Sensitivity/"leverage effect" of land: because land only receives what's "left over" after costs and profit, small % changes in the finished-property sale price cause disproportionately large % swings in land value (e.g., a 10% drop in sale price cut the land value ~51% in the worked sensitivity table) — land value can even go negative, signaling the development isn't viable at that price.
Dynamic vs. static: dynamic is more rigorous/accurate for long projects; under Order ECO/805/2003 (art. 34.3) the static procedure may only be used for plots and rehabilitations where works can start within one year and for built plots — otherwise it must be dynamic, for every purpose the Order governs (art. 2, and mortgage-loan appraisals through Law 5/2019 art. 13); static also serves as a cross-check. Expropriation follows the Land Act instead: unbuilt urbanised land by the static residual method (TRLSRU art. 37.1.b; RD 1492/2011 art. 22), built land at the higher of a joint comparison value and that residual applied to the land alone (art. 37.2; RD 1492/2011 art. 23).
Common mistakes to avoid: confusing buildability coefficient with plot surface area; forgetting to include all developer's expenses (fees, permits, marketing 3–6% of sale value); using one discount rate for all risk profiles; misapplying b to costs instead of VM; not checking that F comes out positive.
Spanish vocabulary
método residual
residual method
valor residual
residual value
procedimiento dinámico
dynamic procedure
procedimiento estático
static procedure
edificabilidad
buildability
coeficiente de edificabilidad
buildability coefficient
valor de repercusión
contributory value
valor unitario
unit value
tasa de descuento
discount rate
margen del promotor
developer's margin
flujos de caja
cash flows
tipo libre de riesgo
risk-free rate
prima de riesgo
risk premium
viabilidad
feasibility/viability
Key citations
Order ECO/805/2003 — reference regulation for the residual method (required for mortgage/financial valuations); governs discount rates and cash-flow estimation criteria.
Royal Legislative Decree 7/2015 (recast Land Act) — valuation for expropriation: unbuilt urbanised land by the static residual method (art. 37.1.b
RD 1492/2011 art. 22), built land at the higher of a comparison value or that residual (art. 37.2
RD 1492/2011 art. 23), rural land by capitalising its actual or potential income, whichever is higher (art. 36.1.a).
Cadastral regulations — Cadastre uses similar residual-style methods with its own tables/coefficients.
Banco de España regulations — require accredited appraisal companies to apply ECO 805/2003 for mortgage lending on land/project-stage buildings.
Tema 48
The Valuation Report
Key concepts
The tema is a complete worked example of a court-ordered expert valuation report (dictamen / informe pericial) written by a colegiado API for a Juzgado de 1ª Instancia (enforcement proceeding, ejecución de títulos judiciales) to establish the value of a seized property (embargo). It shows the structure a professional report must follow rather than new theory.
Two-layer structure: (1) a summary (resumen / cédula de pericia, pages 1–2): requester, property identification + registry data, methodology, appraisal value, date, purpose, signature; (2) the complete report (informe completo) in 14 numbered sections; (3) annexes.
The 14 sections of the full report: 1 Requester and purpose → 2 Identification, registry data and other data (full Registry description, surface, owners and their shares, title, cadastral reference) → 3 Checks performed and documentation used → 4 Locality and surroundings (municipality, neighbourhood, infrastructure, amenities/transport) → 5 Land description and surface → 6 Building description and surface → 7 Planning status → 8 Protection regime, tenure and occupation → 9 Market analysis → 10 Data and calculation of technical values → Appraisal value → 11 Conditions and warnings → 12 Observations (expert's oath) → 13 Issue date and signature → 14 Annexed documentation.
Checks (section 3): physical identification by on-site inspection, inside and out; conformity with planning (dentro de ordenación → planning status not relevant to the value). Documents used: nota simple from the Registro de la Propiedad, cadastral data, location plan, photo report.
Surface discrepancy rule (section 6): Registry said 104 m², Cadastre 105 m²; the report adopts the cadastral 105 m² and states why (larger, closer to the market study, discrepancy negligible). Always adopt one figure explicitly and justify it. Also record age (38 years, built 1978).
Section 8: state whether any legal protection (e.g. VPO) limits the sale price, and who occupies the property (here: one of the co-owners).
Market analysis (section 9): grid of primary/secondary market supply and demand (high/medium/low/none) and expectations (better/same/worse).
Calculation (section 10) — comparison method: table of 10 comparable offers (address, built m², price, homogenised €/m², offer vs sale) → mean homogenised value 1,315.17 €/m² → × adopted 105 m² = 138,092.88 € for 100% of full ownership → the object valued was a 1/3 undivided share (33.33%) = 46,030.96 € ≈ 46,031 €. Note "all prices have been homogenised" and that figures are asking prices (oferta), not closed sales.
Appraisal value statement: written in words and figures, for the exact share valued, with the explicit note that it is assigned without deducting any charge or encumbrance that may exist on the property (refer to the nota simple annex).
Section 12 — expert's oath (perito judicial): declares under promise to tell the truth that they acted with maximum objectivity, considering what may favour or harm either party, and that they know the criminal penalties for breach of expert duty (art. 335.2 LEC formula).
Section 13: appraiser's name, professional title (Agente de la Propiedad Inmobiliaria), colegiado number, date of last site visit (7 May 2017) and issue date (11 May 2017). Where ECO/805 binds, art. 77 also requires an expiry date: the report is issued at most two months after the last visit and expires six months after issue (art. 62).
Annexes: A location plan, B photographs, C cadastral data (consulta descriptiva), D nota simple from the Registry (shows finca, IDUFIR, VPO status, issue date).
Every page carries a footer with the appraiser's identity (name, DNI, address, phone) and the page number ("Pág. n de 17").
Key formulas
Market value (100% full ownership) = adopted surface × mean homogenised €/m² → 105 m² × 1,315.17 €/m² = 138,092.88 €
Value of an undivided share = full-ownership value × share → 138,092.88 € × 33.33% = 46,030.96 €
Spanish vocabulary
informe de valoración
valuation report
dictamen pericial
expert opinion / expert report
cédula de pericia
expert's summary sheet
perito
expert witness / appraiser
solicitante
requester / instructing party
finalidad de la tasación
purpose of the appraisal
ejecución de títulos judiciales
enforcement of court judgments
embargo
seizure / attachment
nota simple
(uncertified) Land Registry extract
IDUFIR / CRU
unique registry identifier of the property
finca registral
registered property (registry unit)
tomo / libro / folio / inscripción
volume / book / sheet / entry (registry references)
referencia catastral
cadastral reference
pleno dominio
full ownership
cuota indivisa
undivided share
carácter privativo
separate (non-marital) property
dentro de ordenación
in conformity with planning
régimen de protección
protection regime (e.g. VPO)
tenencia y ocupación
tenure and occupation
homogeneizado
homogenised (adjusted comparable)
valor de mercado (VM)
market value
valor de tasación
appraisal value
condicionantes y advertencias
conditions and warnings
cargas y gravámenes
charges and encumbrances
fecha de emisión
issue date
documentación anexa
annexed documentation
Key citations
Art. 335.2 Ley de Enjuiciamiento Civil (LEC) — the expert's oath/promise to act with objectivity, reproduced in section 12 of the report.
Ley de Propiedad Horizontal — the flat is a horizontal-division unit subject to the LPH and the statutes recorded in the first entry of the parent property.
Order ECO/805/2003 (amended by Order ECM/599/2025, in force 12 Aug 2025) — reference standard for the comparison method used in section 10 (homogenisation of comparables); binding only for the financial purposes of its art. 2, so a voluntary reference for a court report. Where it binds: at least six comparables (art. 21) and, for each, its cadastral reference, surfaces, and asking vs trimmed price with the negotiation discount and agency commission explained (art. 75.2.a).
Registro de la Propiedad / nota simple informativa — the documentary basis used here for the identification and charges sections (Annex D), but informative only: it does not attest the registry entries (art. 222.5 Ley Hipotecaria). In an enforcement the expert values at market value without charges (art. 639.3 LEC) and the court deducts them from the certificación de dominio y cargas (arts. 656, 666 LEC); where ECO/805 binds, art. 8.1 requires a registry certificate issued within three months (a nota simple suffices only for mortgage valuations).